Primary Holding
A stipulation in a bill of lading that requires the consignee to file a claim for loss or damage within a fixed period and to institute suit within a shorter time than the general statute of limitations is valid and binding as a condition precedent to the accrual of a right of action, provided the periods are reasonable. Non-compliance with such condition precedent extinguishes the right to enforce the carrier’s liability, even if the cause of action otherwise exists.
Background
In March 1977, 7,000 bags of low-density polyethylene were shipped from Baton Rouge, Louisiana, aboard the foreign vessel SS “VISHVA YASH,” destined for Davao City via Manila. The cargo, consigned to the order of Far East Bank and Trust Company with arrival notice to Tagum Plastics, Inc. (TPI), was insured by Philippine American General Insurance Co., Inc. (Philamgen). At Manila, the shipment was transhipped to the interisland carrier M/V “Sweet Love,” operated by Sweet Lines, Inc. (SLI). Upon discharge at Davao, significant shortages and contamination were discovered, leading to a survey and, ultimately, a suit for recovery.
History
1978 – 1981-
May 1978
Complaint filed on 12 May 1978 in the Regional Trial Court of Manila, Branch II (Civil Case No. 115376), by Philamgen and TPI against Sweet Lines, Inc., Davao Veterans Arrastre and Port Services, Inc., S.C.I. Line, and F.E. Zuellig, Inc., for recovery of lost or damaged cargo.
-
3 yrs 3 mos later
-
Aug 1981
Before trial, a compromise agreement was executed with S.C.I. Line and F.E. Zuellig; the case against them was dismissed with prejudice on 12 August 1981.
-
The trial court rendered judgment in favor of petitioners, ordering SLI to pay ₱34,902.00 and holding SLI and DVAPSI jointly and severally liable for ₱49,747.55, plus attorney’s fees and costs.
-
Sweet Lines, Inc. appealed to the Court of Appeals (CA-G.R. CV No. 04620).
-
The Court of Appeals reversed the trial court’s decision and dismissed the complaint on the ground of prescription.
-
Petitioners’ motion for reconsideration was denied; they elevated the case to the Supreme Court via a petition for review on certiorari.
Facts
The Shipment and Insurance:
In or about March 1977, the foreign vessel SS “VISHVA YASH” took on board at Baton Rouge, Louisiana, two consignments totalling 7,000 bags of low-density polyethylene (600 bags of type 631 and 6,400 bags of type 647), covered by Bills of Lading Nos. 6 and 7. The cargo was consigned to the order of Far East Bank and Trust Company, Manila, with arrival notice to Tagum Plastics, Inc., Madaum, Tagum, Davao City. Tagum Plastics insured the shipment with Philamgen under Marine Risk Note No. 438734.
Transshipment and Delivery:
The cargo was discharged at the Port of Manila and transshipped to Davao City aboard the interisland vessel M/V “Sweet Love,” owned and operated by respondent Sweet Lines, Inc. Sweet Lines issued its own bills of lading numbered MD-25 and MD-26. The goods were loaded in Holds Nos. 2 and 3, commingled with similar cargoes of other consignees. On 15 May 1977, the shipment was discharged from the vessel and turned over to the consignee.
Survey and Extent of Loss:
A survey conducted on 8 July 1977 at petitioners’ instance revealed that of the 7,000 bags originally inside 175 pallets, only 5,820 bags were delivered in good order condition, resulting in a shortage of 1,080 bags. Many of the remaining bags were torn, partially emptied, or contaminated with foreign matters, rendering their contents unfit for the intended purpose. The bags were considered a total loss and valued at ₱110.28 each, inclusive of customs duties, taxes, and other charges.
The Bills of Lading Stipulations:
The bills of lading issued by Sweet Lines contained a paragraph 5 which read, in part:
“Claims for shortage, damage, must be made at the time of delivery to consignee or agent, if container shows exterior signs of damage or shortage. … Claims for non-delivery, misdelivery, loss or damage must be filed within 30 days from accrual. Suits arising from shortage, damage or loss, non-delivery or misdelivery shall be instituted within 60 days from date of accrual of right of action. Failure to file claims or institute judicial proceedings as herein provided constitutes waiver of claim or right of action.”
Claim and Suit Filed:
Philamgen filed a claim with Sweet Lines only on 28 April 1978. A provisional claim had earlier been filed with DVAPSI on 14 June 1977, and a survey was conducted on 8 July 1977. The complaint was instituted on 12 May 1978. Sweet Lines had issued a “Report on Losses and Damages” dated 15 May 1977, which noted damages but carried the notation: “This Copy should be submitted together with your claim invoice or receipt within 30 days from date of issue otherwise your claim will not be honored.”
Lower Court Findings:
The trial court found that loss or damage had already occurred by the time the cargo was discharged to DVAPSI and could not have occurred solely in the arrastre operator’s custody. It held SLI and DVAPSI liable, but the Court of Appeals reversed, ruling that the claim and suit were time-barred under the bills of lading.
Arguments of the Petitioners
-
Non-presentation of the Bills of Lading: Petitioners contended that the Court of Appeals erred in upholding prescription because the bills of lading containing the shortened periods were never formally offered in evidence, and their existence and tenor remained unproven.
-
Invalidity of the Shortened Periods: Assuming the bills of lading existed, petitioners argued that paragraph 5, which shortened the period for filing a claim and instituting suit, was void as an unreasonable contract of adhesion contrary to public policy, invoking Sweet Lines, Inc. v. Teves.
-
Substantial Compliance: Petitioners maintained that even if the stipulation were valid, they substantially complied therewith because Sweet Lines had actual knowledge of the loss through its own Report on Losses and Damages, rendering a separate formal claim unnecessary.
Arguments of the Respondents
-
Existence and Admissibility of the Bills of Lading: Sweet Lines countered that it was standard practice to issue bills of lading and that Bills of Lading MD-25 and MD-26 had in fact been issued; their existence was manifest in the records and the litigation revolved around them.
-
Reasonableness and Validity of the Stipulation: Sweet Lines defended the reasonableness of the time limitations, asserting that such clauses are uniformly adopted in the shipping industry to balance the legal presumption of negligence that operates against carriers and to enable prompt investigation while evidence is fresh.
-
Lack of Proof of Negligence: DVAPSI argued that the complaint against it should be dismissed because petitioners failed to prove its direct responsibility for the loss or damage; unlike a common carrier, an arrastre operator is not governed by a presumption of negligence.
Issues
-
Admissibility of the Stipulations: Whether the Court of Appeals correctly upheld the defense of prescription despite the fact that the bills of lading containing the time limitations were not formally offered in evidence.
-
Validity of the Shortened Periods: Whether the stipulation limiting the period to file a claim to 30 days and to institute suit to 60 days from accrual of the right of action is void as a contract of adhesion or contrary to public policy.
-
Substantial Compliance: Whether petitioners substantially complied with the claim-filing requirement through the carrier’s own Report on Losses and Damages and the earlier survey.
-
Liability of the Arrastre Operator: Whether DVAPSI may be held liable for the loss or damage notwithstanding the dismissal of the action against the carrier.
Ruling
-
Admissibility of the Stipulations: The bills of lading were actionable documents that formed the basis of both the cause of action and the defense. Under Sections 7 and 8 of Rule 8 of the Rules of Court, the genuineness and due execution of an actionable document are deemed admitted unless specifically denied under oath. Petitioners’ reply merely assailed the validity of the stipulations as a contract of adhesion without denying the existence or genuineness of the bills of lading. This amounted to a negative pregnant—a denial pregnant with the admission of the substantial facts pleaded. Consequently, the instruments and their terms were impliedly admitted and could be considered without being formally offered in evidence.
-
Validity of the Shortened Periods: The 30-day claim requirement is not a mere prescriptive period but a condition precedent to the accrual of a right of action, consistently with Article 366 of the Code of Commerce. The failure to file a timely claim prevents a right of action from vesting in the consignee. The 60-day suit provision is a valid contractual limitation that merely requires the earlier assertion of an otherwise existing right. Such a stipulation is not contrary to public policy because it does not defeat the right to recover but only sets a shorter time within which to bring suit. Contracts of adhesion are not per se void; the adhering party is free to reject the contract entirely. The ruling in Sweet Lines, Inc. v. Teves was distinguished because it involved an unreasonable venue stipulation, whereas the time limitations here were reasonable and standard in the industry.
-
Substantial Compliance: There was no substantial compliance with the condition precedent. The claim against Sweet Lines was filed on 28 April 1978, nearly a year after the 15 May 1977 discharge—far beyond the 30-day period. Sweet Lines’ Report on Losses and Damages merely noted the condition of the goods and did not constitute the required claim; it explicitly required a separate claim within 30 days. The survey conducted at petitioners’ behest did not substitute for the notice of claim that would have alerted the carrier to the institution of a demand for compensation. Petitioners’ own ability to file a provisional claim with DVAPSI as early as 14 June 1977 demonstrated that they could have filed a timely formal or provisional claim with SLI but failed to do so.
-
Liability of the Arrastre Operator: Because the right of action against the carrier was extinguished by failure to comply with the condition precedent, DVAPSI could not be held liable by mere elimination. Additionally, petitioners failed to prove when, where, and how the loss or damage occurred, or to establish negligence on the part of DVAPSI. An arrastre operator does not bear a presumption of negligence; liability must rest on preponderant evidence of want of due diligence, which was not presented.
Doctrines
-
Actionable Documents and Implied Admission — Under Sections 7 and 8 of Rule 8 of the Rules of Court, when a pleading is based upon or sets up a defense founded on a written instrument, the genuineness and due execution of that instrument are deemed admitted unless the adverse party specifically denies them under oath. A denial that merely impugns the validity of the instrument without contesting its existence or execution is a negative pregnant and operates as an admission. The instrument need not be formally offered in evidence once admitted.
-
Cause of Action Distinguished from Right of Action — A cause of action consists of the operative facts giving rise to an enforceable claim; a right of action is the right to presently enforce that cause of action. The right of action does not arise until all conditions precedent to the action have been performed, and it may be taken away by prescription, estoppel, or failure of a condition, even if the underlying cause of action remains.
-
Notice of Claim as Condition Precedent — A stipulation in a contract of carriage requiring the consignee to file a notice of claim for loss or damage within a specified period is a condition precedent to the accrual of a right of action against the carrier. Its purpose is to afford the carrier a reasonable opportunity to investigate the claim while the matter is fresh. Failure to give such notice extinguishes the right to enforce the carrier’s liability.
-
Validity of Contractual Limitation of Action — The parties to a contract of carriage may validly agree to a shorter period for filing suit than the statutory limitation, provided the period is reasonable. Such a stipulation does not contravene public policy because it does not defeat the vesting of the right to recover; it merely requires that the right be asserted within a shorter time.
-
Subrogation of Insurer — An insurer who pays the loss is subrogated pro tanto to the rights of the insured and may sue the responsible third party. However, the insurer stands in the shoes of the insured and is bound by all the terms of the bill of lading, including conditions precedent that the insured would have to satisfy.
Key Excerpts
-
“a right of action is the right to presently enforce a cause of action, while a cause of action consists of the operative facts which give rise to such right of action. The right of action does not arise until the performance of all conditions precedent to the action and may be taken away by the running of the statute of limitations, through estoppel, or by other circumstances which do not affect the cause of action.”
-
“the filing of a claim with the carrier within the time limitation therefor under Article 366 actually constitutes a condition precedent to the accrual of a right of action against a carrier for damages caused to the merchandise.”
-
“Such limitation is not contrary to public policy for it does not in any way defeat the complete vestiture of the right to recover, but merely requires the assertion of that right by action at an earlier period than would be necessary to defeat it through the operation of the ordinary statute of limitations.”
-
“contracts of adhesion wherein one party imposes a ready-made form of contract on the other … are contracts not entirely prohibited. The one who adheres to the contract is in reality free to reject it entirely; if he adheres he gives his consent.”
Precedents Cited
-
Southern Lines, Inc. v. Court of Appeals, 4 SCRA 258 (1962) — Distinguished. The requirement of filing a claim under Article 366 of the Code of Commerce applies only to actions for recovery of damages for loss or damage to cargo, not to actions for refund of overpayment; the present suit fell squarely within the damages category.
-
Sweet Lines, Inc. v. Teves, 83 SCRA 361 (1978) — Distinguished. The ruling voiding a venue stipulation as an unreasonable contract of adhesion did not control, because the time limitations involved here were reasonable and served a legitimate commercial purpose.
-
Ong Yiu v. Court of Appeals, 91 SCRA 223 (1979) — Followed. Contracts of adhesion are not inherently prohibited; the adhering party is free to reject the whole contract and, by adhering, gives consent.
-
Sea-Land Service, Inc. v. Intermediate Appellate Court, 153 SCRA 552 (1987) — Cited for the rule that a consignee who accepts a bill of lading is bound by all its stipulations.
-
Government of the Philippine Islands v. Inchausti & Co., 24 Phil. 315 (1913) — Followed for the principle that Article 366 of the Code of Commerce applies to maritime transportation.
-
Fireman’s Fund Insurance Company, Inc. v. Jamila & Company, Inc., 70 SCRA 323 (1976) — Subrogation entitles the insurer to sue the party responsible for the loss.
Provisions
-
Article 366, Code of Commerce — Applied as the basis for the requirement that a claim for damage or average must be made within a specified period after receipt of the merchandise. The bill of lading stipulation extended the statutory 24-hour period to 30 days, a modification sanctioned by jurisprudence.
-
Sections 7 and 8, Rule 8, Rules of Court — Governed the treatment of actionable documents; the bills of lading were properly pleaded and their genuineness and due execution were deemed admitted for want of a specific verified denial.
-
Section 4, Rule 129, Rules of Court — Judicial admissions made in pleadings are conclusive upon the party making them and require no further proof.
Notable Concurring Opinions
Narvasa, C.J., Padilla, and Nocon, JJ., concurred.