Ang Kaalaman/search/irr/doc-83462/
Supplemental IRR of P.D. No. 856 (June 25, 1999)
Implements
P.D. No. 856
(NAR) VOL. 10 NO. 3 / JULY - SEPTEMBER 1999
[ DOH, June 25, 1999 ]
SUPPLEMENTAL IMPLEMENTING RULES AND
REGULATIONS OF CHAPTER II — "WATER SUPPLY", OF
THE CODE ON SANITATION OF THE PHILIPPINES (P.D. 856)
To carry out the provisions of Chapter II — "Water Supply" of the Code on
Sanitation of the Philippines (P.D. 856), these rules and regulations supplementing
the existing rules and regulations approved by the Secretary of Health on 24th
November 1995, are hereby formulated for implementation of all concerned.
SECTION 1. SCOPE. — These supplemental implementing rules and regulations
shall apply to the following:
1.1 Development of drinking water supply system;
1.2 Establishment and operation of retail water system (RWS) or refilling station;
1.3 Source and product water quality monitoring;
1.4 Drinking water in vending machines and dispensers and product water
containers;
1.5 Household and commercial water purification equipment, gadgets and devices;
and
1.6 Bulk water handling, storage and transportation.
SECTION 2. DEFINITION OF TERMS. — As used in these supplemental
implementing rules and regulations, the following term shall mean:
2.1 AIRGAP — a clear vertical space through the free atmosphere between the
opening of any pipe or faucet conveying water or waste to a tank, plumbing fixture
receptor, or other device and the flood level rim of the receptacle. An air gap is used
to prevent cross-connection between a water treatment device and a possible source
of wastewater thereby preventing a reverse flow of water from the sewer into the
water supply system.
2.2 APPROVED WATER LABORATORY — a Department of Health-accredited
water analysis laboratory.
2.3 APPROVED SOURCE — source of the water whether it be from a spring,
artesian well, drilled well, public or private water system, rain water reservoir, or
any other source that has undergone a sanitary survey, issued site clearance,constructed, and the water sampled, analyzed, and found safe and potable, issued an
operational permit and certificate of potability of drinking water.
2.4 BACKFLOW — flow of water in a pipe or line in a direction opposite to the
normal flow; often associated with back siphonage of the flow of used water into a
potable water system.
2.5 BACKFLOW PREVENTER — a device or system installed in a water line to
stop backflow from a non-potable source.
2.6 BACKPRESSURE — pressure which creates resistance against the flow of
water.
2.7 BACK-PRESSURE BACKFLOW — backflow due to an increased pressure
above the supply pressure, which may be due to pumps, boilers, gravity or other
sources of pressure.
2.8 BACKWATER VALVE — a device installed in a system to prevent reverse flow.
2.9 BULK WATER — water in container of five gallons or more in volume coming
from refilling station establishment or water intended for potable uses which is
transported via tanker truck or equivalent means from one area to another for the
purpose of treatment and/or packaging and human consumption.
2.10 CERTIFICATE OF POTABILITY OF DRINKING WATER — a certification
issued by the Secretary or his duly authorized representative certifying the potability
and safeness of source drinking water for human consumption based on the
Philippine National Standards for Drinking Water.
2.11 CROSS-CONNECTION — any connection or arrangement, physical or
otherwise, between a potable water supply system and any plumbing fixture or any
tank, receptacle, equipment or device, through which it may be possible for non-
potable, used, unclean, polluted and contaminated water, or other substances, to
enter into any part of such potable water system under any condition.
2.12 DEIONIZATION — the removal of the ionized minerals and salts (both
organic and inorganic) from a solution by a two-phase ion-exchange procedure.
First, positively charge ions are removed by a cation exchange resin in exchange for
a chemically equivalent amount of hydrogen ions. Second, negatively charged ions
are removed by an anion exchange resin for a chemically equivalent amount of
hydroxide ion. The hydrogen and hydroxide ions introduced in this process unite to
form water molecules. The term is often used interchangeably with demineralization.
2.13 DISTILLATION — the process of separating organic and inorganic solids from
water by evaporation (vaporization) followed by cooling and condensation.
2.14 ESTABLISHMENT — a collective term construed to include buildings and
premises where retail water system product water or refilling station product water is
being processed.
2.15 FILTER — device installed as part of a water treatment system through whichwater flows for the purpose of removing turbidity, unpleasant taste, odor, iron or
color. Filters can be loose media beds, in tanks or cartridge-type devices. Filter
media may be used for mechanical, absorptive, neutralizing, or catalyst/oxidation
filtration process.
2.16 FILTRATION — the process of separating solids from a liquid by means of a
porous substance such as a permeable fabric or membrane or layer of inert media.
2.17 GOOD MANUFACTURING PRACTICE (GMP) — the detail requirements
governing plant construction and design, sanitary facilities and operations,
equipment design and construction, production and process controls specific to the
production and purification of water.
2.18 HORIZONTAL PIPE — any pipe or fitting which is installed in a horizontal
position or which makes an angle of less than forty-five (45) degrees with the
horizontal.
2.19 HYDROSTATIC PRESSURE — a measurement of structural strength and
ability to hold water pressure.
2.20 ION EXCHANGE — the reversible process in which ions are released from an
insoluble permanent material in exchange for other ions in a surrounding solution;
the direction of the exchange depends upon the affinities of the ion exchanger for the
ions present and the concentration of the ions in the solution.
2.21 POINT-OF-ENTRY (POE) — a water treatment device that is installed at the
main inlet to a building or mobile vehicle and acts as centralized water treatment.
2.22 POINT-OF-USE (POU) — a water treatment system designed to connect at the
actual point-of-use for water; countertop or undersink treatment system.
2.23 PRESSURE — the normal force exerted by a homogenous liquid or gas, per
unit of area, on the wall of the container.
2.23.1STATIC PRESSURE — the pressure existing without any flow.
2.23.2RESIDUAL PRESSURE — the pressure available at the fixture or water
outlet after allowance is made for pressure drop due to friction loss, head,
meter and other losses in the system during maximum demand periods.
2.24 PRESSURE BALANCING VALVE — a mixing valve that senses incoming
hot and cold water pressures and compensates for fluctuations in either, to stabilize
outlet temperature.
2.25 REFILLING STATION — another term for a retail water system (RWS)
establishment.
2.26 REFILLED WATER OR PRODUCT WATER — source water that has
undergone additional processing and the product of multi-stage purification
technology (filtration, ion-exchange treatment, post carbon polishing, distillation,
ultraviolet sterilization, reverse osmosis, air filtration, ozonation or other DOH-
approved technology) and complying with the standard parameters and values for
refilled water quality of retail water system or refilling station.2.27 REFILLED WATER CONTAINER — food-grade quality container for the
containment of processed drinking water from retail water system or refilling station
establishment.
2.28 REFILLED WATER DISPENSER — an equipment used for dispensing
processed drinking water either as a coin-operated machine, a monetary-driven
equipment or manually operated machine.
2.29 REGULATING EQUIPMENT — includes all valves and controls used in a
plumbing system, which are required to be accessible or readily accessible.
2.30 RESIDUAL — the amount of a specific material remaining in water following
a water treatment process. It may refer to material remaining as the result of
incomplete removal such as hardness leakage, or to a substance meant to remain in
the treated water such as residual chlorine.
2.31 RETAIL WATER SYSTEM (RWS) — refilled water being sold and placed in
the refilled water container or in customer's containers in refilling station.
2.32 REVERSE OSMOSIS OR HYPERFILTRATION — a process for the removal
of dissolved ions from water, in which pressure is used to force the water through a
semi-permeable membrane, which will transmit the water but reject most of the
other suspended and dissolved materials. It is called reverse osmosis because
mechanical pressure is used to force the water flow in the direction that is the
reverse of natural osmosis, namely from the dilute to the concentrated solution.
2.33 SANITARY CLEARANCE — a clearance issued by the local health office to
food or water delivery vehicles, mobile water tankers and similar vehicles, including
its appurtenances that they comply with the design, construction, specification and
other requirements of the Department.
2.34. SANITARY PERMIT — the permission or certification in writing of the
city/municipal health officer or in his absence, the chief or head of the sanitation
division/section/unit that the establishment complies with the existing minimum
sanitation requirements upon evaluation or inspection conducted in accordance with
Presidential Decree Nos. 522 and 856 and its implementing rules and regulations,
and local ordinances.
2.35 SOURCE WATER — water from approved source that is conveyed or
distributed to the refilling station through the public or private water mains or water
tankers, containers or reservoir.
2.36 ULTRAVIOLET LIGHT STERILIZATION — the process of killing active
bacteria and spores in water with the use of ultraviolet ray.
2.37 VERMIN — a group of insects such as flies, mosquitoes, cockroaches, lice,
bedbugs or small animals such as mice and rats that are vector of diseases.
2.38 VERMIN ABATEMENT PROGRAM — a series of preventive and control
procedures and activities in the control of vermin.2.39 WATER HAMMER ARRESTOR — a device used to absorb hydraulic shock,
either of the air chamber or mechanical device design.
2.40 WATER MAIN (STREET MAIN) — a water-supply pipe for public or
community use.
2.41 WATER-DISTRIBUTING PIPE — in a building or premises, a pipe which
conveys potable water from the building supply pipe to the plumbing fixtures and
other water outlets.
2.42 WATER PURIFICATION DEVICE — any DOH-certified equipment,
apparatus, device or gadget whose purpose is to purify water, either for household,
commercial or other uses.
SECTION 3. SANITARY REQUIREMENTS FOR THE DEVELOPMENT OF
DRINKING WATER SUPPLY SYSTEM.
3.1 DRINKING WATER SITE CLEARANCE
3.1.1 Requirements - Persons or entities intending to develop drinking water supply
system shall submit the following initial requirements to the local health office.
a. Application letter addressed to the local health officer or duly accomplished
application form.
b. For waterworks, a copy of the water permit issued by the National Water
Resources Board (NWRB).
3.1.2 Sanitary Survey
a. A sanitary survey shall be conducted by the local health office on all proposed
water supply source location. It shall be done under the supervision of a sanitary
engineer. Such sanitary survey (EHS Form No. 121) shall be a prerequisite for the
issuance of the Drinking Water Site Clearance.
b. The sanitary survey shall include the evaluation of the site location, type of water
supply source (well, spring, etc.), type of water use and the following:
i. Ground water supply: the slope of the ground surface, depth of the
water table (maximum drawdown), nature of soil and underlying porous
strata as determined from well log test, distance of the nearest well, yield
of the nearest well, direction of surface run-off.
ii. Wells: distance of the well from possible sources of contamination.
iii. Springs: type of spring, geologic location, free flowing or with the use
of external force, possible upstream sources of pollution, characteristic of
water.
iv. Fresh Surface Water Supply: area of the watershed/drainage, grasslandarea, area greater than 3% slope, average annual rainfall, estimated
annual run-off, length of main stream, drainage density, channel gradient,
perimeter of river basin and rain water impounding reservoir.
v. Other required technical data that may influence the development of
the water source.
3.1.3 Issuance of the Drinking Water Site Clearance - After the result of the sanitary
survey has been evaluated and found to be satisfactory, a Drinking Water Site
Clearance (EHS Form No. 122) Shall be issued by the local health authority as
recommended by the local health officer. The amount of fees for the clearance shall
be set through city/municipal ordinance.
3.2 INITIAL PERMIT ("Notice to Proceed")
3.2.1 Requirements - Persons or entities intending to develop drinking
water supply system shall submit the following to the Regional Health
Office concerned:
a. A copy of the Drinking Water Site Clearance issued by the local health
office.
b. Engineering report and/or feasibility study, including assessment of
water source and system capacity and pressure to meet the water
demands of intended beneficiaries or clients.
c. Plans and specifications and other required document signed and
sealed by a privately practicing licensed sanitary engineer.
3.2.2 Review and Evaluation - The plans and specifications and other
necessary documents for the construction of the water source shall be
reviewed and evaluated by the Supervising Sanitary Engineer at the
Regional Health Office. He shall submit his findings and
recommendation to the Regional Health Director.
3.2.3 Issuance of the Initial Permit ("Notice to Proceed") - The Regional
Health Director shall issue or deny the issuance of the Initial Permit to
the applicant based on the findings and recommendation of the
Supervising Sanitary Engineer. No construction, installation and
operation of the water source shall be done without an approved Initial
Permit issued by the Regional Health Director.
3.3 OPERATIONAL PERMIT
3.3.1 Requirements - After completion of construction works on the
water supply system, the following shall be submitted to the Regional
Health Office concerned:
a. Report of inspection of completed construction works and complete
disinfection of the system from the local health office.b. Report of inspection verifying completeness of construction works and
disinfection from the regional and/or provincial sanitary engineer.
c. Result of the water sampling and testing conducted by a DOH-
accredited water analysis laboratory.
3.3.2 Issuance of Operational Permit - The Regional Health Director
shall issue or deny the issuance of the Operational Permit to the applicant
based on the findings and recommendation of the Supervising Sanitary
Engineer. The applicant shall be informed on the permit status and action
to be taken, in case negative findings were noted. No water supply source
shall be operated for drinking purposes without an Operational Permit
issued by the Regional Health Director.
3.3.3 Grounds for Revocation/Suspension of the Operational Permit
a. Errors found in the plans and specifications.
b. Incorrect or inaccurate data or information found in the application.
c. Non-compliance with terms and conditions of Permit.
d. Repair was not done as prescribed, rendering the water unsafe for
human consumption.
e. Disinfection of the water system was not done after disruption of water
service or disinfection was not done after a recent repair work in the
water system. The drinking water system shall be flushed and disinfected
before being placed in service after construction, repair or modification
and after emergency situation such as flood, that may introduce
contaminants to the system.
f. Unauthorized change, modification or alteration in the approved plans
and specifications and/or in the type of construction.
g. Other causes that may be discovered during the operation of the water
system, which is not in accordance with these rules and regulations and
the DOH standards.
3.4 CERTIFICATE OF POTABILITY OF DRINKING WATER
3.4.1 Requirements - The issuance of the Certificate of Potability of
Drinking Water shall be based on the following:
a. Results of the water sampling and testing conducted by a DOH-
accredited water analysis laboratory.
b. Reports and recommendation of the Local Drinking Water Quality
Monitoring Committee (LDWQMC).
3.4.2 Issuance of the Certificate of Potability of Drinking Water (CPDW)a. The city or municipal health officer is hereby deputized by the
Secretary of Health to issue Certificate of Potability of Drinking Water.
b. The frequency of the evaluation and re-validation of the CPDW shall
be in accordance with the standard interval or frequency of sampling
specified in the Philippine National Standards for Drinking Water.
c. Fees for the certification shall be in such amount as set through
city/municipal ordinance.
3.4.3 Grounds for Revocation of the Certificate of Potability of Drinking
Water
a. Non-compliance with maximum contaminant level set by the
Philippine National Standards for Drinking Water as shown in the result
of most recent water analysis.
b. The result of the water analysis was not evaluated and recommended
by the Local Drinking Water Quality Monitoring Committee.
c. The laboratory where the water sample was submitted and analyzed is
not a DOH-accredited laboratory.
d. Other compelling reasons (e.g. false or misleading results of water
analysis, etc.).
e. The Operational Permit was revoked/suspended earlier by the
Department.
3.5 REQUIRED MEASURES FOR THE OPERATOR OF THE WATER SYSTEM
IN CASE WATER IS FOUND OR DECLARED UNSAFE FOR DRINKING. The
operator of the water supply system shall:
3.5.1 Immediately stop the operation of the part of the water distribution
system that was detected to be hazardous for human consumption.
3.5.2 Immediately inform the Department and the local health office of
the condition of the water system. In such cases, the local health office
shall immediately inform the local health authority who shall convene
the Local Drinking Water Quality Monitoring Committee. The
Committee shall announce to the public:
a. The status of the drinking water and the precautionary
measures that should be done by the public during the crisis.
b. The limited usage of the water being supplied (e.g. for
bathing, washing clothes, watering plants, washing cars, etc.).
3.5.3 Refrain from unauthorized declaration of the quality of the drinking
water to the public without any prior clearance from the Department orthe Local Drinking Water Quality Monitoring Committee.
3.5.4 Assume the obligation of print and media expenses in the
pronouncement of the situation to the public.
3.5.5 Institute immediate repair of the affected portion/s of the water
supply system.
3.5.6 Provide substantial quantity of drinking water to the affected
consumers.
3.5.7 Conduct complete disinfection of the affected portion of the water
system and collect water samples for laboratory analysis.
3.5.8 Wait for the clearance from the Department or the Local Drinking
Water Quality Monitoring Committee and the re-issuance of the
Certificate of Potability of Drinking Water by the city/municipal health
officer before the full operation of the water system.
3.5.9 Submit to the Department and the Local Drinking Water Quality
Monitoring Committee the water supplier's contingency plans for such
situation.
3.6 DISTRIBUTION LINES, DELIVERY AND RETENTION
3.6.1 Water Distribution Lines
a. All openings through floors over the water distribution areas shall be
provided with sleeves securely bonded to the floor construction and
projecting not less than 19.1 mm (¾ inch) above top of the finished floor
with space between sleeve and pipe or duct sealed.
i. All pipes and fittings used for water conveyance shall be
made of materials acceptable to the Department.
ii. All plastic pipes and fittings that are or will be exposed to
ultraviolet light (UV) shall be provided with protective
coating or UV protector.
iii. All valves that are used in water conveyance systems shall
be of food grade quality.
iv. All water distribution systems shall be provided with
isolation valves in branch lines or grid lines.
v. Appropriate control and regulating valves shall be provided
where needed.
3.6.2 Diameter
a. Fittings shall be of the same materials used for piping. For dissimilarpiping materials, appropriate adaptors shall be used.
b. Floor and shower drains installed above such areas shall be equipped
with integral seepage pans.
i. For mechanical flanges and joints, food grade rubber seals
shall be used.
ii. For threaded joints, teflon seal shall be used.
3.6.3 Water Supply Metal Pipes and Fittings
a. Metal pipes and fittings shall be rigid, high strength and food grade.
Acceptable metal piping shall include ductile iron pipes, centrifugally
cast iron pipes, stainless steel pipes, copper pipes, galvanized iron pipes.
b. Other metal pipes and fittings intended to be used for potable water
conveyance shall be subject to the approval of the Secretary.
3.6.4 Water Supply Plastic Pipes and Fittings
a. Plastic pipings subject to operation at temperatures that will form
condensation on the exterior of the pipe shall be thermally insulated.
b. Plastic pipes and fittings shall be food grade, chemically stable against
water purifying and disinfecting agents, and shall be of adequate
thickness. Acceptable plastic piping and fitting materials shall include
polyethylene, polyvinyl chloride, and polypropylene. The use of other
plastic pipes shall be subject to the approval of the Secretary.
3.6.5 Water-Distributing Pipe
a. Where pipes are installed in ceilings above such areas, the ceiling shall
be of the removable type, or shall be provided with access panels in order
to form a ready access for inspection of piping.
b. Water shall be received by the refilling station establishment from the
source through the use of the public water main or one or more of the
following that shall be constructed, maintained and operated in
accordance with these rules and regulations:
i. Private water system, water pumps, pipes, hoses,
connection and other appurtenances.
ii. Mobile bulk water tanks.
iii. Water containers.
iv. Rain water catchment reservoir.
3.7 MONITORING OF DRINKING WATER SUPPLY SYSTEM3.7.1 The city/municipal health office shall cause the monitoring of the
operation of the drinking water supply system and the quality of drinking
water produced and distributed within the system through the Local
Drinking Water Quality Monitoring Committee.
3.7.2 Report from the water supplier of the following shall be obtained
and reported to the Local Drinking Water Quality Monitoring committee:
a. Description of the vertical and horizontal extent of the source aquifer
using existing data that will be used to define the recharge area of the
aquifer.
b. Report on any additional improvement or constructions of the spring
or well, well installation, surface catchment and intake structures.
c. Watershed survey of the recharge area or zone of influence of the water
source that identifies and evaluates actual and potential sources of
contamination which shall be updated every three years, including any
reported discharge that may affect the source.
d. A plan for special monitoring of any significant contaminant source
and the appropriate corrective measures to protect the water source.
e. Regular monitoring of quality of water supplies.
SECTION 4. SANITARY REQUIREMENTS FOR THE OPERATION OF RETAIL
WATER SYSTEM OR REFILLING STATION.
4.1 SANITARY PERMIT REQUIREMENTS
4.1.1 No person or entity shall operate a retail water system (RWS) or refilling
station for commercial purposes without securing a Sanitary Permit from the
city/municipal health office. The following documents shall be submitted as
requirements for the issuance of the permit:
a. Operational Permit and Certificate of Potability of Drinking Water for
retail water system or refilling station where raw water is sourced from
private water supply system.
b. Certificate of Potability of Drinking Water for retail water system or
refilling station where raw water is sourced from public water supply
system. However, validation water samples shall be required to confirm
that there is no cross-connection in the main lines and/or seepage from
the water main.
c. Plans and specification for the complete multi-stage water purification
design of the plant prepared by a privately practicing licensed sanitary
engineer (R.A. 1364 and P.D. 1096) shall be submitted with each
application for a sanitary permit. Such plans and specifications shall be
subject for review and approval by the city/municipal health officer as
recommended by a government employed licensed sanitary engineer.4.1.2 Any additional construction, alteration or renovation in the establishment or
any alteration, addition or deletion or any changes in the water treatment process,
which is not indicated in the approved as-built design, shall require a new sanitary
permit. Violation of this provision shall be a ground for the immediate revocation or
suspension of the sanitary permit.
4.1.3 Application or Renewal of Sanitary Permit
a. The application or renewal of the sanitary permit shall be filed with the
city or municipal health office having jurisdiction over the establishment.
Existing establishment operating before the issuance of these rules and
regulations shall be evaluated by the local health office and shall be
required to conform to these rules and regulations before the renewal or
issuance of the sanitary permit.
b. The sanitary permit shall be issued only upon compliance to at least a
satisfactory rating of the establishment and its product quality, utilizing
the sanitary inspection form.
c. Fees shall be paid to the local government unit upon application or
renewal of sanitary permit. The amount of fees shall be set through city
or municipal ordinance.
4.1.4 Noting of Permit. If there is a change in ownership of the establishment, the
new owner shall apply at the city/municipal health office within fourteen (14)
working days to have such change noted in the records and sanitary permit and shall
pay the corresponding fee in respect of such noting.
4.1.5 Validity. The sanitary permit shall be valid on the day of issuance until the last
day of December of the same year, unless otherwise revoked, and shall be renewed
every beginning of the year, thereafter.
4.1.6 Revocation/Suspension. Upon the recommendation of the local health officer,
the sanitary permit shall be suspended or revoked by the local health authority upon
violation of any sanitary rules and regulations.
4.1.7 Posting. The sanitary permit shall be posted in a conspicuous place of the
establishment for public information and shall be available for inspection by
authorized health and other regulatory personnel.
4.1.8 Record of Sanitary Permit.
a. Every city or municipal health office shall keep a record of all establishments that
have been issued sanitary permit and renewal thereof.
b. The record shall in every case show the following:
i. The name and address of the holder of the sanitary permit;
ii. The location of the establishment;iii. The nature/kind of business for which the permit has been issued;
iv. The registered business name of the establishment;
v. The date the first permit was issued and the dates of any renewal
thereof;
vi. Any alteration, renovation, additional construction in the
establishment;
vii. Any alteration, addition, deletion or any change in the water
purification process;
viii. Every change of management of the establishment since the first
permit was issued;
ix. Sanitary conditions under which the permit was issued or any renewal
thereof granted; and
x. Any revocation of the sanitary permit.
c. The record shall be available at all reasonable times for inspections by any
authorized officer of the Department or the local government unit concerned.
4.2 SANITARY STRUCTURAL REQUIREMENTS
4.2.1 Location
a. The establishment shall be located in areas or zones designated by
existing laws or local ordinance.
b. The establishment shall be at least twenty-five (25) meters away from
direct sources of pollution.
c. The site shall not be subject to flooding. In areas where frequent
flooding occurs, the establishment shall be designed in such a manner
that the water purification process will not be contaminated by flood
water.
d. Source water and power shall be available.
4.2.2 Plans and Specifications
a. The plans and specifications of the retail water system or refilling
station establishment shall be signed and sealed by a privately practicing
licensed sanitary engineer and submitted to the local health office for
review and approval.
b. The design, construction and specification of delivery vehicles, mobile
water tankers or bulk water tankers shall be submitted by the applicant to
the local health office for approval. On-site visitation, where necessary,shall be conducted by the local health office.
4.2.3 Plant Construction and Design
a. In the design of the plant, rooms or facilities shall be provided for the
refilling, selling, purification equipment (enclosed room), container
washing and sanitizing, container storage (separate for filled and empty),
production or source water storage facilities, toilet room and other rooms
and facilities (e.g. parking area), as may be required by the
city/municipal health office. Rooms that should be under positive
pressure of purified air (e.g. filling room) shall be determined by the
city/municipal health office.
b. Room/Facility Area Allocation.
Refilling and Selling Room 9.50 square meters (minimum)
Water Purification Room 3.10 square meters per person (clear of all
equipment)
Container Washing andSanitizing Room 6.00 square meters (plus 3.10 square meters
for every additional personnel)
Container Storage Room:
1. Filled 1. Sufficient area; per approved plan
2. Empty 2. Sufficient area; per approved plan
Production/Source Water Storage Facilities Sufficient space that will allow free
movement during the conduct of inspection
Office Space 1.77 square meters per person (clear of all
furniture and equipment)
Changeroom 2.80 square meters per person (inclusive of
lockers or other facilities)
Toilet Room Per Toilet Structural Requirement
Parking Area (optional) 30 square meters plus 10 square meters for
each additional car
c. All doors and partitions shall be of see-through finished materials (e.g. glass,
approved plastic materials) for the purpose of transparent product processing and
satisfactory supervision.
d. All customer service openings shall be so designed and constructed as to
minimize the entrance of dust, seepage and other contaminants and to protect against
entrance of insects and rodents.
e. All rooms used for processing, handling and selling shall be constructed in
accordance with the following requirements:i. Floors. Floors shall be constructed of concrete or other impervious,
non-skid and easily cleaned material and shall be adequately graded and
drained. Store or selling area, if provided with floor drain, shall be of the
"closed' type.
ii. Walls. The internal surface of walls shall be smooth, even, non-
absorbent and easily cleaned without damaged to the surface. It shall be
painted with light color or finished with light colored materials. All
angles between the floor and walls shall be rounded off to a height of
7.62 centimeters. All angles between walls and ceilings shall be sealed as
to leave no spaces or cracks which would permit accumulation of dust
and dirt or provide harborage for vermin. Walls of toilet, bath and other
rooms/premises subject to wetting shall be constructed of impervious,
non-absorbent materials to a height of not less than two (2) meters from
the floor.
iii. Ceilings. Ceilings shall be constructed of smooth, non-absorbent and
easily cleaned material and painted with light color.
iv. Doors. Doors shall be self-closing and tight fitting with smooth and
non-absorbent surfaces.
v. Lighting. All rooms shall be provided with a minimum illumination
intensity of 20 foot-candle (215.20 lux).
vi. Ventilation. Each personnel shall be allotted a room volume of at least
twelve (12) cubic meter.
1 When only natural ventilation is provided, all rooms shall have a
window opening of at least 10% of the floor area. Windows shall be kept
clean and in good condition.
2. In the absence of effective natural ventilation, mechanical ventilation
with airflow from a clean area and discharged in such manner as not to
create nuisance, shall be provided with the following:
a. Air-conditioning Unit — provide 1.5 HP (6,000 BTU/hr) air-
conditioner for every 50 cubic meter room volume.
b. Exhaust Fans or Blower — provide 25.40-cm diameter blower fan per
35 cubic meter room volume.
c. Toilet and Bathroom — provide a 15.24-cm diameter exhaust fan per
10 cubic meter room volume. Mechanical exhaust systems shall be
connected to the light circuits of windowless bathrooms.
3. All selling and filling and water purification rooms shall preferably be
air-conditioned.
4. All rooms shall be provided with odor absorber or with an installed air
purifier.5. Air circulated in the room of the establishments shall be supplied
through air inlets arranged, located and equipped so that the personnel
and customers are not subjected to air velocities exceeding 1.02 meter
per second. Not less than three (3) changes of air per hour shall be
provided.
f. No room or space shall be used in connection with the purification of water,
handling, capping, sealing, storage, sale and other related activities which is at
anytime used as a sleeping quarter or directly connected to a toilet or in which
animal is kept or which is or has been used for any purpose that would likely
contaminate the water. Persons not directly involved in the process, including
children, shall be allowed in these service areas.
g. It is strictly prohibited for RWS or refilling station establishments, particularly in
the water processing, refilling and selling rooms, to conduct other business (e.g.
selling grocery items, dry goods, cosmetics, etc.) or allow to display or store their
items in the establishment other than the RWS materials.
4.3 SANITARY FACILITIES REQUIREMENTS - The retail water system or
refilling station establishment shall provide adequate sanitary facilities including,
but not limited to, the following:
4.3.1 Water Supply
a. There shall be an adequate supply of water for the operations and
maintenance of the establishment and its facilities.
b. The water source shall be protected from possible contamination that
will adversely affect its potability and palatability.
c. The water supply going to the water purification machines/equipment
shall be protected from backflow and backpressure from in-machine
water.
d. Booster, pneumatic, pressure or other pumps shall be prohibited to be
connected directly to main water lines when water source is from public
water supply system.
e. The plumbing system, water piping, connections, fittings and hoses
conveying water shall be constructed, installed and repaired with in
accordance with the National Plumbing Code of the Philippines.
f. Air Gap. The air gap between the water supply inlet and the flood rim
of the plumbing fixture, equipment or non-water equipment shall be at
least twice the diameter of the water supply inlet or as per the following
schedule:
Fixture Minimum Air Gap (cm)
When not Affected by When Affected by
Near Wall Near WallLavatories with effective opening not greater 2.54 3.81
than 1.27 cm diameter
Sink, laundry, trays and gooseneck bath 3.81 5.72
faucets with effective openings not greater
than 1.91 cm diameter
Over rim bath fillers with effective openings 5.08 7.62
not greater than 2.54 cm diameter
Effective opening greater than 2.54 cm 2 x Effective Opening 3 x Effective
Opening
g. Backflow Prevention Device. The backflow or backsiphonage prevention device
installed on a water supply system shall meet the National Plumbing Code of the
Philippine's standards for construction, installation, maintenance, inspection and
testing for that specific application and type of device.
h. Cross Connection.
i. No person shall install any water operated equipment or mechanism, or
use any water treating chemical or substance, if it is found that such
equipment, mechanism, chemical or substance may cause pollution or
contamination of the domestic water supply. Such equipment or
mechanism may be permitted only when equipped with an approved
backflow prevention device or assembly.
ii. Approval of Devices or Assemblies. No device or assembly used for
the prevention of backflow shall be installed, removed, relocated, or
substituted without the approval of the local health office. Devices or
assemblies shall be tested for conformity with recognized standards or
other standards acceptable to the Department.
iii. The person or persons having control of such devices or assemblies
shall maintain them in good working condition. The local health office
may inspect such devices or assemblies and if found to be defective or
inoperative, shall require the repair or replacement thereof.
i. Conditioning Device. Water filters screens and other water-conditioning devices
installed on water lines shall be designed to facilitate disassembly for periodic
servicing and clearing. Water filters shall be of the replaceable type.
j. Prohibited Connections.
i. No installation of potable water supply piping or part thereof shall be
made in such a manner that it will be possible for used, unclean, polluted
or contaminated water, mixtures or substances to enter any portion of
such piping from any tank, receptacle equipment or plumbing fixture by
reason of back-siphonage, by suction or any other cause, either during
normal use and operation thereof or when any such tank, receptacle
equipment or plumbing fixture is flooded or subject to pressure in excessof the operating pressure in the hot or cold water piping.
ii. No person shall make a connection or allow one to exist between pipes
or conduits carrying domestic water supplied by any public or private
water service system, and any pipes, conduits or fixtures containing or
carrying water from any other source or which has been used for any
other purpose whatsoever, or any piping carrying chemicals, liquids,
gases or substances whatsoever, unless there is provided a backflow
prevention device approved for the potential hazard.
iii. No plumbing fixture, device or construction shall be installed or
maintained or shall be connected to any domestic water supply when
such installation or connection may provide a possibility of polluting
such water supply or may provide a cross connection between a
distribution system of water for drinking and domestic purposes and
water which may become contaminated by such plumbing fixture, device
or construction unless there is provided a backflow prevention device
approve for the potential hazard.
iv. No water piping supplied by any private water supply system shall be
connected to any other source of supply without the approval of the local
health office.
k. Potable Water Piping
i. Whenever a water filter, water softener or water treating device, or
other similar device is installed in any water supply line, the pressure loss
through such devices shall be included in the pressure loss calculations of
the system, and the water supply pipe and meter shall be adequately sized
to provide for any such pressure loss.
ii. No water filter, water softener, backflow prevention device, or other
similar device shall be installed in any potable water supply piping when
the diameter of the inlet or outlet of any such device or its connecting
piping is less than the diameter of such water supply piping or when the
installation of such device produces an excessive pressure drop in any
such water supply piping.
iii. All such devices shall be approved by the local health office and shall
be tested for flow rating and pressure loss by an approved laboratory or
recognized testing agency in accordance to standards consistent with the
intent of these rules and regulations.
iv. The quantity of water required to be supplied to every plumbing
fixture shall be represented by fixture units.
v. In localities where there is fluctuation of pressure in the main
throughout the day, the water piping system shall be designed on the
basis of the minimum pressure available.4.3.2 Toilet Facilities
a. Adequate and clean toilet facilities shall be provided for personnel use.
Number of Water Closet Urinal Lavatory
Personnel
Male Female Male Female
5 -29 1 1 - 1 1
30-49 1 2 2 2 2
50-99 2 2 2 3 3
For every 100 - up, one (1) fixture for each additional 50 personnel
b. The toilet shall not open directly into spaces where product water is being purified
and handled.
c. The toilet door shall be tight fitting and self-closing.
d. Toilet room shall be completely enclosed, properly lighted and ventilated.
e. RWS employing less than five (5) personnel shall provide at least one (1) water
closet and one (1) handwashing lavatory.
f. Toilet room for women shall be provided with receptacle for sanitary napkins.
g. Toilet Structural Requirements: The approval of the city/municipal health officer
as recommended by the sanitary engineer shall be required on the following:
i. Plans of the toilet;
ii. Individual sewage disposal system, sub-surface absorption system or
other secondary or waste water treatment device;
iii. Minimum space requirement:
Unit Sq.m ./Unit Sq.ft ./Unit
Water Closet 1.50 16
Lavatories 1.11 12
Urinals 1.11 12
Showers 1.11 12
1. Minimum height of ceiling = 2.5 meters
2. Lighting = not less than 10 foot-candle (107.6 lux)3. Natural ventilation window space shall be at least 25% of the floor
area of the toilet room
4. Mechanical ventilation = use of exhaust fan
h. At least one (1) service sink or one (1) curbed cleaning facility equipped with a
floor drain shall be provided and conveniently located for the cleaning of mops or
similar wet cleaning tools and for the disposal of mop water and similar liquid waste
for the retail water system establishment or refilling stations.
4.3.3 Hand-Washing Facilities
a. Wash-hand basins shall be provided and installed in convenient location and as
near as practicable to where the person for whose use they are provided.
b. There shall be adequate supply of soap, nail brush, clean towels or other suitable
hand-drying facilities.
c. Handwashing lavatory shall not be used for purposes other than handwashing.
4.3.4 Liquid Waste Management
a. Waste water treatment and disposal shall be strictly enforced in accordance with
the provisions of the IRR on Chapter XVII - "Sewage Collection and Disposal,
Excreta Disposal and Drainage" of the Code on Sanitation of the Philippines, P.D.
856.
4.3.5 Solid Waste Management
a. Indoor Storage Area and Receptacles. If located within the establishment, storage
areas for refuse, recyclable, and returnable and refuse receptacles shall comply to the
requirements of Sec. 4 - "Sanitary Requirements for the Segregation and Storage of
Refuse/Solid Waste" of the IRR of Chapter XVIII, "Refuse Disposal" of the Code on
Sanitation of the Philippines, P.D. 856.
b. Outdoor Storage Surface. An outdoor storage surface for refuse, recyclables, and
returnables shall be constructed of non-absorbent material such as concrete or
asphalt and shall be smooth, durable and sloped to drain.
c. Outdoor Enclosure. If used, outdoor enclosures for refuse, recyclables and
returnables shall be constructed of durable and easy to clean materials.
d. All waste materials shall be handled in such a manner as to avoid contamination
of water.
e. All other pertinent provisions of the IRR of Chapter XVIII - "Refuse Disposal" of
the Sanitation Code of the Philippines, P.D. 856 is hereby adopted and made an
integral part of these rules and regulations.
4.3.6 Vermin Controla. A vermin abatement program shall be maintained in the establishment by the
operator/owner. The methods and procedures for vermin control shall be in
accordance with the implementing rules and regulations of Chapter XVI-"Vermin
Control" of the Sanitation Code of the Philippines, P.D. 856.
4.3.7 Changeroom
a. RWS or refilling station establishment shall provide a changeroom and suitable
lockers or other facilities for the orderly storage of clothing and personal belonging
of employees and where personnel could change from their street clothes before
working and vice versa. It is prohibited to have any clothing, including gowns and
aprons, in other places in the establishment except in the places abovementioned.
b. The facilities shall be so situated and arranged that there is no contamination of
refilled water.
c. Where the number of persons engaged or employed is five (5) or more of either
sex, there shall be provided separate changing room for each sex.
d. Changeroom shall be cleaned and disinfected at least once a week, or more
frequently as may be necessary.
4.4 SANITARY PROCESSING AND OPERATION PROCEDURES
4.4.1 Water Purification Process
a. The water treatment or purification process shall be capable of
producing drinking water that is clear, colorless and free from
objectionable taste and odor. The product water shall not contain any
substance, organism, chemical or radioactive material at a concentration
which could endanger the lives of the consuming public.
b. The design of the water treatment or purification process shall be
based on the characteristic of the source water and the availability of
appropriate purification technology. The design shall be environmentally
sound, ecologically safe and cost-efficient. The water purification
process shall include an air filtration to minimize the recontamination of
the product water.
c. The product water shall show "No Residual" of any disinfectant used.
d. An appropriate quality monitoring program for the water treatment or
purification system shall be established in accordance to manufacturers'
requirements. The program shall include recording the conditions and
performance of equipment.
4.4.2 Washing and Sanitizing of Water Containers, Caps and Dispensers
a. Containers, caps and dispensers for refilled water provided by the
RWS shall be of non-toxic, non-corrosive and food grade quality
materials.b. Water containers or dispensers for sale or lease from the RWS or
refilling stations shall be subject to testing and certification by the
Department.
c. Product water operators shall submit to the local health office the
certification by the Department indicating the acceptability of the
container.
d. All water containers and caps provided by the establishment or
provided by customers shall be thoroughly washed with water from
approved source prior to sanitizing. Warm water with a temperature
range of 46°C to 49°C (115 °F — 120 °F) or a strong alkaline solution
with pH of 10.5 may be used to aid in the cleaning process.
e. Sanitizing solution and/or process shall be applied to all water
containers and caps after washing. It shall be the responsibility of the
RWS or refilling station operator to see to it that washing and sanitizing
of containers are conducted before filling it with product water. The
sanitizing process may be by means of chemical, dry or moist heat agent
or other approved procedures. Chemical sanitization using 60%-75%
available chlorine shall be based on the standard attached as Annex 1.
f. Only DOH-approved sanitizing solution and/or process shall be
permitted. The following data regarding the sanitizing solution shall be
submitted for evaluation by the Department:
i. Health Hazard Data (signs and symptoms; first-aid
procedures and medical conditions generally recognized as
aggravated by exposure);
ii. Reactivity Data (stability, stability-conditions to avoid,
hazardous decomposition products, hazardous
polymerization, hazardous polymerization-conditions to
avoid);
iii. Spill or Leak Procedures (steps to be taken in case
material is released or spilled, waste disposal information);
iv. Special Protection Information (respiratory protection,
ventilation, protective gloves, eye protection, other protective
measures);
v. Special Precautions (precautionary labeling);
vi. Other Handling and Storage Conditions;
vii. A clear statement of the types of water purification
systems intended for sanitizer treatment is also necessary to
enable the Department to estimate probable chronic human
exposure to a sanitizer and its component; andviii. The manner in which the sanitization is performed (e.g.,
clean-in-place, immersion, etc.) and the types of equipment
intended for treatment (e.g. containers, utensils, conveyer,
belt, tanks, flat work surfaces, etc).
g. Treatment of containers or surface shall not be followed by a water
rinse prior to its contact with the refilled water. Where rinsing is done,
refilled water shall be used for rinsing.
h. There shall be "adequate draining" of the treated containers, equipment
or contact surfaces.
i. There shall be no residual of the sanitizer in the product water
(sanitizing solutions are considered as indirect food additives).
4.4.3 Filling and Capping
a. Before being used, filling equipment (designed to be cleaned in-place)
shall be thoroughly cleansed and sanitized in-place.
i. An alkaline solution of appropriate strength shall be
recirculated through the filler to provide effective cleaning of
all product water contact surfaces, with a minimum
recirculation time of 20 minutes at a temperature between
60°C and 76.67°C.
ii. The cleaning solution shall be drained and followed with
potable water rinse-to-drain for the removal of all residual
alkalinity. The step may be supplemented by the application
of an acidified rinse prior to the potable water rinse in order to
neutralize any residual alkalinity on product contact surfaces.
b. Immediately following completion of filling operations, the filler shall
be thoroughly rinsed internally and externally with potable water.
c. Parts of the filler that are not designed to be cleaned in-place shall be
disassembled and removed. All these parts shall be cleansed and
sanitized prior to reassembly using DOH-approved cleansing and
sanitizing procedure.
d. All surfaces of the filler that do not come in contact with the water
shall be cleaned manually so as to render all surfaces free of residues.
e. Any other cleaning, rinsing, or sanitization operations or processes not
mentioned above shall be subject to the approval of the city/municipal
health officer.
f. Filling of containers with water shall be in a manner that it will not
come in contact with hands or other surfaces that may contaminate the
water.g. The rim of the container when filling shall be pointed directly to the
water-dispensing nozzle during filling.
h. The container shall be properly and immediately capped after filling.
Precautions shall be observed when workers manually cap the container.
i. Sanitary Cap or equivalent cap for 5-gallons bulk water container shall
be used to prevent the contamination of the neck of the container before
placing it to the dispenser.
j. Five-gallon bulk water containers shall preferably be provided with
handle or "ears" or a carrying strand attached to the container's groove or
in the neck. Bulk water containers shall be carried only with the use of a
container's grabber or handler.
4.4.4 Storage of Water
a. Storage tank/sump/reservoir design, materials, specification and
location shall be reviewed and approved by local health office before its
construction/installation.
b. The design of the steel tank shall include the manhole/opening,
drainpipe, and vermin proofed vent and inlet and outlet pipes.
c. Materials that are used in the construction of a steel storage tank shall
be made of non-toxic materials, durable, corrosion-resistant and non-
absorbent and finished to have smooth, easily cleaned surface. Soldering
joints materials shall be based on DOH approved materials and
procedure.
d. Concrete sumps, tanks and reservoirs shall be tested for water
tightness. Internal finishing construction materials shall be approved by
the local health office.
e. All water storage facilities shall be cleaned and sanitized at least once a
month.
f. Refilled water in containers awaiting delivery shall be stored in cool
room temperature (26°C-28ºC) and relative humidity of 60%.
g. Refilled water shall be stored in dry environment away from chemicals
and solvents (e.g. household cleaning products, gasoline paint thinners)
and other toxic materials and contamination.
h. Refilled water in containers shall preferably be stored in a separate
storage room.
i. Refilled water containers shall be stored in slated platform with a
height of 20 cm from the floor to allow air circulation, easy cleaning and
inspection of vermin infestation.j. Holding time of stored refilled water shall not go beyond 24 hours.
4.4.5 Transporting of Refilled Water
a. All refilled water shall be transported in sanitary transporting facilities
inspected and approved by the local health office.
b. All refilled water containers to be transported shall be properly
arranged, crated or boxed and the containers properly capped and
protected from contamination. All vehicles shall be kept clean, and no
substance capable of contaminating the product water shall be
transported in such a manner as to permit contamination.
c. A Sanitary Clearance shall be required for every refilled water delivery
vehicle. Sanitary Clearance Fee shall be in such amount that the
city/municipality may impose through a local ordinance. The clearance
shall be posted in all delivery vehicles.
d. Delivery personnel in vehicles carrying refilled water shall see to it
that the water is maintained at room temperature (25ºC-28ºC).
e. All deliveries of refilled water, in so far as the containers and vehicles
are concerned, shall be subject to the inspection and approval of the local
health office having jurisdiction on the area of origin.
f. The local health offices concerned at the receiving point of deliveries
may also conduct inspection of the containers and vehicles and findings
referred to the counterpart local health office as mentioned above.
SECTION 5. SANITARY REQUIREMENTS FOR MOBILE WATER TANKS AND
BULK WATER FOR DRINKING.
5.1 SANITARY CLEARANCE
5.1.1 A Sanitary Clearance shall be required for all water tankers. Fee for
the clearance shall be in such amount that the city/municipality may
impose through a local ordinance. The Sanitary Clearance shall be posted
in each individual water tanker vehicle.
5.1.2 All deliveries of bulk water for drinking shall be subject to the
inspection and approval of the local health office having jurisdiction of
the area of origin.
5.1.3 The local health offices concerned at the receiving point of
deliveries may also conduct inspection of the bulk water and findings
referred to the counterpart local health office mentioned above.
5.1.4 Except during exigencies (e.g., disasters, calamities) and subject to
the guidelines issued by the Department, no mobile water purification
plant (e.g., Point-Of-Entry and Point-Of-Use) shall be allowed to operate.The operation of the mobile plants shall also require a Sanitary Clearance
from the local health office.
5.2 MOBILE WATER TANKS
5.2.1 Materials for Mobile Water Tanks. Materials that are used in the
construction of a mobile water tank and appurtenances shall be safe,
made of or finished internally with non-toxic materials, durable,
corrosion-resistant, non-absorbent and finished to have a smooth, easily
cleaned surface.
5.2.2 System and Drain. The mobile water tank shall be enclosed from
the filling inlet to the discharge outlet and sloped to an outlet that allows
complete drainage of the tank.
5.2.3 Access Port. If a mobile water tank is designed with an access port
for inspection and cleaning, the opening shall be in the top of the tank
and flanged upward at least 13 mm and equipped with a port cover
assembly that is provided with a gasket and a device for securing the
cover in place; and flanged to overlap the opening and sloped to drain.
5.2.4 "V " Type Threads. A fitting with "V" type threads on a water tank
inlet or outlet shall be allowed only when a hose is permanently attached.
5.2.5 Tank Vent. If provided, a water tank vent shall terminate in a
downward direction and shall be covered with 16 mesh screen or
equivalent when the vent is in a protected area, or a protective filter when
the vent is in an area that is not protected from windblown dirt and
debris.
5.2.6 Inlet and Outlet. A water tank and its inlet and outlet shall be sloped
to drain. The inlet shall be positioned so that it is protected from
contamination such as grease, road dust or waste discharge.
5.2.7 Hose. A hose used for conveying drinking water shall be safe,
durable, non-absorbent, resistant to pitting, chipping, crazing, scratching,
scoring, distortion and decomposition and shall be finished with a
smooth interior surface, and clearly and durably identified as to its use if
not permanently attached.
5.2.8 Filter. A filter that does not allow passage of oil or oil vapor shall
be installed in the air supply line between the compressor and drinking
water system when compressed air is used to pressurize the water tank
filter.
5.2.9 Protective Device or Cover. A cap and keeper chain, closed cabinet,
closed storage tube or other approved protective cover or device shall be
provided for a water inlet, outlet and hose.
5.2.10 Small Mobile Water Tank. The water tank inlet shall have a 19.1
mm inner diameter or less and provided with a hose, with a hoseconnection of a size or type that will prevent its use for any other service.
5.2.11 System Flushing and Disinfection. The water tank pump and hoses
shall be flushed and sanitized before being placed in service after
construction, repair, modification and period of non-use.
5.2.12 Backflow Prevention. Persons operating the water tank and hoses
shall prevent that backflow and other contamination of water supply.
5.2.13 Fitting. If not in use, a water tank and hose inlet and outlet fitting
shall be protected using a cover or device.
5.2.14 Water tank pump and hoses used for conveying drinking water
shall not be used for other purpose.
5.3 BULK WATER FOR DRINKING
5.3.1 Product water shall not be transported or stored in bulk tanks, or
processed or placed through equipment or lines for non-food products.
5.3.2 Bulk water shall be from approved source.
5.3.3 Bulk shipment of water prior to transporting to RWS or to
consumers shall be disinfected. Free residual, chlorine reading shall be
maintained between 0.20 to 0.50 ppm until water reaches the plant or the
household.
5.3.4 Representative samples shall be taken from shipment of the bulk
water for the analyses of coliform and Heterotrophic Plate Count (HPC).
The minimum frequency of sampling shall be one sample from each
tanker on a weekly basis. Record of the deliveries and laboratory results
of water sample shall be available for inspection by the Department or
the local health office.
SECTION 6. SANITARY REQUIREMENTS FOR WATER VENDING MACHINES
AND DISPENSERS. —
6.1 No person shall operate a water vending machine or dispenser for commercial
purposes without securing a sanitary permit from the local health office.
6.2 The local health office may in writing, exempt establishments from securing a
separate sanitary permit for the water vending machine or dispenser when the same
is located inside a food establishment. The class of vending machine shall be
specified in the exemption form.
6.3 Commercial water vending machines or dispensers located in other
establishments (e.g., drug stores, bowling alleys, billiard halls, schools, hotel lobby,
cockpit arena, hospitals, theaters, service stations and other public places
establishments) shall not be exempted from securing sanitary permit.
6.4 These machines shall be located only in specific places approved by the localhealth office. A transfer of location shall need a new sanitary permit.
6.5 Cups used in commercial water vending machines or dispensers shall be made of
recyclable single service materials.
6.6 Water vending machines or dispensers shall be registered only in the name of the
operator.
6.7 Operators and employees of vending machines and dispensers shall secure the
necessary health certificate.
6.8 A refuse receptacle shall be located adjacent the vending machine or dispenser.
6.9 Design of Vending Machines and Dispensers.
6.9.1 Vending machines shall be so designed that practically all parts,
including the nozzles, can be cleaned and sanitized daily.
6.9.2 Drinking water dispensers shall be so designed that the nozzles are
detachable for easy cleaning and sanitizing. The top most area where the
bulk water container are placed, shall be provided with a sanitary,
protector shield or equivalent device to prevent the contamination of the
drinking water from the neck and other parts of the bulk water container.
6.9.3 Vending machines and drinking water dispensers shall not contain
parts that are made of lead or other toxic materials or will promote the
growth of microorganisms.
6.9.4 No vending machines or drinking water dispensers shall be sold or
placed for household or commercial purposes without a certification
from the Department.
SECTION 7. SANITARY REQUIREMENTS FOR THE MANUFACTURE AND SALE
OF WATER PURIFICATION EQUIPMENT, GADGETS AND DEVICES. —
7.1 Any person or entity, firm or company involved in the manufacture and sale of
water purification equipment, gadgets and devices, including household water filters
and water purifiers and similar apparatus (imported or locally made), shall submit an
application to the Department through the Environmental Health Service for review,
testing and certification, before they could market the said equipment, gadgets or
devices.
7.2 Expenses that will be incurred by the Department on laboratory examination and
testing of the water treatment equipment, gadgets and devices shall be charged to the
applicant.
7.3 Fees for the Certification shall be in such amount that the Department will
impose.
SECTION 8. WATER QUALITY MONITORING. —8.1 SOURCE WATER MONITORING
8.1.1 The operator and the local health office concerned shall monitor regularly the
quality of the water source based on the following:
a. Bacteriological quality — at least monthly
b. Physical quality — at least every six (6) months
c. Chemical quality — at least every six (6) months
d. Biological quality — at least once a year
e. Monitoring of radioactive contaminants shall be done only if there is
significant input of radiation from the surrounding environment.
8.1.2 Samples for water analysis shall be submitted to water analysis laboratory
accredited by the Department.
8.2 PRODUCT WATER MONITORING
8.2.1 The quality of product water shall conform to the requirements
stipulated in these implementing rules and regulations.
8.2.2 The local health office shall monitor the product water quality at
the same frequency as the source water monitoring.
8.2.3 The local health office may require operators of RWS or refilling
station, bulk water suppliers, or operators of water vending machines to
test and submit result for any substance, including organic chemical
contaminants at anytime the local health office believes the substance
may be present in the water source and threaten the public health.
8.3 STANDARD PARAMETERS AND VALUES FOR DRINKING WATER
8.3.1 Source water and product water for drinking purposes shall
conform to the Philippine National Standards for Drinking Water.
8.3.2 Product or refilled water from RWS or refilling station shall,
however, contain no residual of any disinfectant used.
SECTION 9. REQUIREMENTS FOR PERSONNEL. —
9.1 HEALTH CERTIFICATE
9.1.1 No person shall be employed in any water refilling station, delivery
vehicles, water tankers and bulk water tankers, and other establishments
processing, dispensing or selling water without an up-to-date health
certificate issued by the local health officer. The certificate shall be
issued only after the required physical and medical examinations and
immunizations.9.1.2 The health certificate (EHS Form 102-A or B) shall be clipped in
the upper left front portion of the employee's garment while working.
This will include all the personnel and driver of delivery vehicles and
mobile tankers and bulk water tankers.
9.1.3 The health certificate shall be renewed at least every year or as
often as required by local ordinance.
9.1.4 Health certificates are non-transferable.
9.1.5 Regulatory fees in the processing of the health certificate shall be in
accordance with local ordinances.
9.2 PERSONAL HYGIENE AND PRACTICES
9.2.1 All personnel of the establishments including delivery and transport
personnel shall observe good personal hygiene.
9.2.2 Personnel shall wear uniform or clean working garments (street
clothes shall not be considered as working garments) and hair restrain for
those who are handling the refilled water.
9.2.3 Washing of hands and arms before working shall be observed. Such
washing shall be repeated during working shift and after smoking,
visiting the toilet, coughing or sneezing into hands, or as often as may be
necessary to remove the contaminants.
9.2.4 Using, chewing or smoking tobacco in any form while processing,
selling or while in the equipment and container washing and disinfecting,
is not allowed.
9.2.5 No person afflicted with a communicable disease or a carrier of
such disease which includes boils or infected wounds, infected pimples,
colds or respiratory infection, diarrhea or gastrointestinal upsets and
other related illnesses, shall be allowed to handle the water processing
and vending activities.
9.2.6 The operator of the establishment shall notify the city/municipal
health officer or the company physician (if available) when any
employee is known to have a notifiable disease.
9.3 PERSONAL PROTECTIVE EQUIPMENT
9.3.1 Personnel working in the purification of water and those that are
using chemical disinfectant shall wear the approved type of respiratory
protection. All other personnel handling water (filling, capping, sealing,
selling, etc.) shall wear a cough mask.
9.3.2 Personnel shall wear the approved type of safety glasses where the
process is using unsealed UV light.9.3.3 All personnel working in the water purification room shall wear
water-resistant shoes like rubber or plastic boots, which shall only be
worn inside such room.
9.3.4 Other personal protective equipment (e.g. body, hearing, face, head,
hand protection, etc.) may be required depending on the equipment,
chemicals and other variations and conditions present in the
establishment.
9.4 ERGONOMICS
9.4.1 The operator of the establishment shall ensure that all work
procedures shall be in such a manner that it will not produce undue
stresses to the musculo-skeletal system of personnel.
9.5 HUMAN RESOURCE DEVELOPMENT
9.5.1 Plant operator or persons directly involved in the management or
supervision of RWS or refilling station shall undergo a 40-hour basic
certification course on ecology, hydrology, microbiology and
parasitology, water demand and treatment, sanitary chemistry, plumbing,
public health engineering, hazard analysis critical control point, and
environmental laws conducted by the Department or any DOH-
accredited professional organization and institution.
9.5.2 Other employees in the establishment shall attend a 20-hour water
sanitation classes to be conducted by the local health office as a pre-
requisite for the issuance of the health certificate.
9.5.3 Operators, managers, supervisors or employees who have
undergone such training course or equivalent courses in their formal
academic course shall be exempted from taking the basic certification
course or water sanitation classes, provided they show certification from
the academic institution.
9.5.4 The plant operator and/or manager shall be responsible for the
quality of product water processed in RWS or refilling station for sale
and distribution to the public. He shall be liable to any litigation that may
arise as a result of negligent manufacture, storage, handling or
distribution of refilled product water.
SECTION 10. INSPECTION AND EVALUATION. —
10.1 RESPONSIBLE OFFICER - It shall be the duty of the city or municipal health
officer to cause the evaluation and inspection of every water refilling station
establishment and other similar establishments, facilities or equipment processing,
dispensing or selling drinking water at least once every three (3) months and to
cause additional inspections and re-inspections and evaluation as deemed necessary
for the enforcement of these rules and regulations. Inspection of the establishment
shall be conducted within seven (7) days after payment of the inspection fee to the
city or municipal treasurer concerned.10.2 SANITATION AND INSPECTION FEE - The fees payable for every
inspection shall be of such amount prescribed by local ordinance.
10.3 MISSION ORDER
10.3.1 The city or municipal health officer or the chief of sanitation
division/section/unit of the local health office, as the case may be, shall
issue a mission order (EHS Form No. 112) for every sanitary inspection
that will be conducted by the sanitary engineer/sanitation inspector.
10.3.2 The mission order must contain the date, mission order number
and series, the name of the inspector and I.D. number, the business
names, addresses, categories of establishments to be inspected and the
scheduled dates of inspection. This must be shown to the owner/operator
of the establishment before any inspection is conducted. The immediate
supervisor of the inspector shall monitor the enforcement of the mission
order.
10.3.3 Sanitary inspection conducted without a mission order is
prohibited.
10.3.4 The owner/operator of the establishment shall report to the local
health officer or chief of sanitation division/section/unit the unauthorized
inspection that was conducted.
10.4 UNIFORM OF THE INSPECTOR AND AIDS TO INSPECTION
10.4.1 The sanitary engineer or sanitation inspector shall wear the
prescribed uniform of the office with the proper identification card while
conducting the inspection.
10.4.2 He shall likewise bring all the equipment and supplies needed in
the inspection such as the inspection forms, clipboards, thermometers,
flashlight, measuring tape, camera, light meter, water pressure gauge,
sampling bottles, residual chlorine and pH comparator kits, blacklight,
etc., and copy of the sanitation laws and other materials.
10.5 RECORDING OF INSPECTION
10.5.1 The sanitary engineer/sanitation inspector shall keep a record of
all his inspections or evaluation reports in an inspection form (EHS Form
103-R).
10.5.2 The sanitary engineer/sanitation inspector shall furnish the
original of such report to the owner/operator.
10.5.3 Demerits entered in the appropriate column of the inspection form
shall indicate that the item does not conform with the requirements of
these rules and regulations.
a. The inspection form has twenty (20) items. Non-complying
items are indicated with an (X). Every such item is weightedwith a demerit 5. The rating of the establishment is therefore:
100 less (number of demerits x 5). The result is expressed as a
percentage (%) rating.
10.5.4 Sanitation Standard
a. The percentage rating has an equivalent sanitation standard
as follows:
Percentage Rating Sanitation Standard Color Code
90%-100% EXCELLENT Luminous Green
70%-89% VERY SATISFACTORY Luminous Yellow
50%-69% SATISFACTORY Red-Orange
b. The sanitation standard rating sticker (SSRS) (EHS Form
No. 104-A/C) shall be posted in a conspicuous part of the
establishment, preferably at the door of the RWS or refilling
station, for guidance of the customers. It shall be updated
once every three-(3) months, unless revoked earlier.
10.5.5 The average sanitation standard of every refilling station shall be
evaluated by the local health officer/chief of sanitation
division/section/unit every year-end to determine its
improvement/maintenance of rating.
10.6 REPORT OF INSPECTION
10.6.1 The sanitary engineer/sanitation inspector who conducted the
inspection shall complete the sanitary inspection report, and whenever an
inspection form issued indicates non-complying items, he shall notify the
owner/operator of the corrections to be made and indicate a reasonable
period for its compliance.
a. The recommended corrective measures shall be specific in
nature or easy understanding of the owner/operator of the
establishment.
b. Reasonable period for compliance or grace period shall be
inclusive of Saturdays, Sundays and holidays.
10.6.2 The sanitary engineer/sanitation inspector who conducted the
inspection shall likewise prepare a sanitary order (EHS Form No. 107)
for approval by the city or municipal health officer or chief of the
sanitation division/section/unit as the case may be.
10.6.3 Within 48 hours of the inspection or evaluation, the original copy
of the inspection report (EHS Form No. 103-R) and the sanitary order
shall be furnished and acknowledged by the holder of the sanitary permit
or the owner/operator of the establishment. The inspection report shall be
personally delivered, or shall be sent through postal service, registered
with return card.10.7 RE-INSPECTION
10.7.1 If upon re-inspection of the establishment after the deadline, the
sanitary engineer/sanitation inspector finds that correction has not been
affected, he shall report to the local health officer who shall recommend
to the local health authority the revocation of sanitary permit.
10.7.2 A copy of the inspection form and any notice served shall, in all
cases be filed and kept by the local health office and be available for
inspection by authorized officials.
10.8 SERVICE OF NOTICE
10.8.1 Whenever an inspection or evaluation form indicates non-
complying items, the city or municipal health officer shall serve the
owner or operator a sanitary order requiring him, within the grace period
stated in the order, to take such remedial action as may be specified
therein.
10.8.2 In the event of non-compliance of the first sanitary order by the
owner/operator, the health officer may serve a second notice:
a. Second Sanitary Order
i. If the owner of the establishment needs additional time to comply with
the first sanitary order, he shall request the city or municipal health
officer in writing, prior to the expiration of the sanitary order, for an
extension of the grace period. The local health officer, upon the
recommendation of the sanitary engineer/sanitation inspector who
conducted the inspection, will act on such request.
ii. Notice of Hearing (EHS Form No. 118). The city or municipal health
officer shall call the holder of the sanitary permit to show cause, at a time
and place stated in the notice, why the permit issued in respect of the
establishment should not be revoked.
10.9 REVOCATION OF PERMIT
10.9.1 After prior notices and hearing as provided above, the local health
officer, if satisfied that the terms of the two notices have not been
complied with or failure to comply therewith is not excusable, shall
recommend the revocation of the said permit, or;
10.9.2 After the second sanitary order on an extended grace period, a re-
inspection was conducted and still the owner/operator fails to comply
with such order as reported by the sanitary engineer/sanitation inspector,
the local health officer shall recommend to the local health authority the
revocation of the sanitary permit without delay and shall inform other
related agencies of the city or municipality of such revocation.
10.9.3 Lifting of suspension of permit may be recommended when the
owner/operator of the establishment complies with the notices.10.9.4 The owner of the establishment may file a motion for
reconsideration to the local health authority if he is not satisfied with the
action of the local health officer.
10.9.5 The local health authority may file court proceedings against any
establishment for continuously operating after the evocation of its permit.
10.10 SUMMARY SUSPENSION OF PERMIT - Whenever the city or municipal
health officer finds unsanitary or unhealthy conditions in the operation of the
establishment which constitute a substantial hazard to public health, the local health
officer shall recommend the immediate suspension of the sanitary permit. Any
person to whom such order is issued may file a written petition and shall be afforded
a hearing within 48 hours.
10.11 APPEALS - The person or panel conducting the hearing may confirm, modify
or reverse the decision appealed from which decision shall be final.
10.12 POWER OF ENTRY - Any sanitary engineer/sanitation inspector or duly
authorized officer of the Department of Health or of the provincial, municipal or city
health offices, upon presentation of proper credentials may at all reasonable times
enter into any establishment for the purpose of inspection or any other action
necessary for administration of these rules and regulations.
10.12.1 Sanitary inspections shall be conducted by officials in accordance with these
rules and regulations.
10.12.2 Sanitary inspections shall be done preferably during the time while the
establishment is in operation.
10.13 HEARINGS - The local health authority may conduct hearings regarding
erring establishments. The decision of the local health authority shall be deemed
final and executory.
10.14 VISITORIAL POWER
10.14.1 The Local Drinking Water Quality Monitoring Committee may
visit any water supplier under its jurisdiction, for the purpose of verifying
the conduct of collection of water sample, interpret the result of the
laboratory analysis, assist in the mitigation of water-borne outbreaks, and
recommend to the local health authority the immediate stoppage of a
water supply system found operating to the detriment of public health,
the imposition of fines to the water supplier and the announcement to the
public of the status of the drinking water of the locality in accordance
with these rules and regulations.
SECTION 11. RESPONSIBILITY OF THE OPERATORS OF RETAIL WATER
SYSTEM OR REFILLING STATIONS, BULK WATER SUPPLIERS, OPERATORS
OF WATER DISPENSER OR VENDING MACHINE. — The operator shall:
11.1 Submit the plans, specification and other required documents of private watersources before its construction to the DOH for review and approval.
11.2 Secure the necessary permits for the establishment, water dispenser or vending
machine and transport/delivery vehicles and health certificate from the local health
office.
11.3 Submit periodically the result of the required water samples for laboratory
analysis.
11.4 Secure the Certificate of Potability of Drinking Water at frequencies prescribed
in these rules and regulations.
SECTION 12. RESPONSIBILITY OF MANUFACTURER/SUPPLIER OF WATER
PURIFIER. — The manufacturer/supplier shall:
12.1 Submit the product particulars for review and certification of the DOH before
the same will be offered for sale.
12.2 Submit result of laboratory analysis of treated water passing the water purifier.
SECTION 13. RESPONSIBILITY OF THE LOCAL HEALTH OFFICER. — The
local health officer shall:
13.1 Conduct or cause the conduct of sanitary inspections and evaluation of every
refilling stations, water dispensers or vending machines, delivery vehicles and
mobile water tankers and validate the water quality of RWS if complying with the
standard parameter and values for refilled water.
13.2 Issue Sanitary Permit to establishments, water dispensers or vending machines
and issue Sanitary Clearance to mobile water tankers and delivery vehicles
complying with the minimum sanitation requirements.
13.3 Issue Health Certificates to all personnel, including drivers of delivery vehicles
of the establishments.
13.4 Cause the conduct of sanitary survey for the development of a drinking water
supply source and issue Drinking Water Site Clearance to applicants.
13.5 Issue Certificate of Potability of Drinking Water in accordance with these rules
and regulations.
13.6 Validate from the DOH approved water purification apparatus, devices and
similar gadgets being sold or peddled to the public.
13.7 Cause the conduct of investigations of any claim on advertised product water or
water purification equipment, which in his judgment, may be detrimental to public
health and safety.
13.8 Enforce the provisions of these rules and regulations.
SECTION 14. RESPONSIBILITY OF THE LOCAL HEALTH AUTHORITY. — Thelocal health authority shall:
14.1 Certify the passing of an ordinance consistent with these rules and regulations
to strengthen its enforcement.
14.2 Provide the necessary supplies and materials to the local health office for the
enforcement of these rules and regulations.
14.3 Issue directives upon the recommendation of the local health officer for the
closure of establishments operating without the necessary sanitary permit and/or
whose operation is inconsistent to the DOH standards and these rules and
regulations.
14.4 Prohibit the selling of water purifiers or equivalent apparatus if found not
conforming to the DOH requirements.
14.5 Enforce the provisions of these rules and regulations.
SECTION 15. RESPONSIBILITY OF THE REGIONAL HEALTH DIRECTOR. —
The regional health director shall:
15.1 Issue Initial and Operational Permit to water suppliers in accordance with these
rules and regulations.
15.2 Coordinate with other government agencies, NGOs, professional associations
on the new technology of drinking water purification.
15.3 Conduct surveillance of the proliferation of water refilling stations and
household and commercial water purifier operating or being sold in the market
without the certification from the DOH.
15.4 Enforce the pertinent provisions of these rules and regulations.
SECTION 16. PENAL PROVISION
16.1 Any person who shall violate, disobey, refuse, omit or neglect (including
implementors) to comply with any of the provisions of these rules and regulations,
shall be guilty of misdemeanor and upon conviction shall be punished by
imprisonment for a period of not exceeding six (6) months or by a fine of not
exceeding Php 1,000.00 or both depending upon the discretion of the court.
16.2 Any person who shall interfere with or hinder, or oppose any officer, agent or
member of the Department of Health or the bureaus and offices under it, or of the
local government units or local health offices in the performance of his duty as such
under these rules and regulations, or shall tear down, mutilate, deface or alter any
placard, or notice, affixed to the promises in the enforcement of these rules and
regulations, shall be guilty of a misdemeanor and punishable upon conviction by
imprisonment for a period not exceeding six (6) months or by a fine of not
exceeding Php 1,000.00 or both depending upon the discretion of the court.
SECTION 17. SEPARABILITY CLAUSE — In the event that any rule, section,paragraph, sentence, clause or words of these implementing rules and regulations is
declared invalid for any reason, the other provisions thereof shall not be affected
thereby.
SECTION 18. REPEALING CLAUSE — All laws, orders, rules and regulations
which are inconsistent with the provisions of these rules and regulations are hereby
repealed or amended accordingly.
SECTION 19. EFFECTIVITY — These rules and regulations shall take effect after
fifteen (15) days from date of publication in the official gazette or newspaper of
general circulation.
Adopted: 25 June 1999
(SGD.) ALBERTO G. ROMUALDEZ, JR., M.D.
Secretary of Health
Source: Supreme Court E-Library
This page was dynamically generated
by the E-Library Content Management System (E-LibCMS)