Ang Kaalaman/search/irr/doc-82445/
IRR of Chapter XX of P.D. No. 856 (April 16, 1998)
Implements
Chapter XX of P.D. No. 856
(NAR) VOL. 9 NO. 2 / APRIL - JUNE 1998
[ DOH, April 16, 1998 ]
IMPLEMENTING RULES AND REGULATIONS OF CHAPTER
XX — "POLLUTION OF THE ENVIRONMENT" OF THE CODE
ON SANITATION OF THE PHILIPPINES (P.D. 856)
To carry out the provisions of Chapter XX — "Pollution of the Environment" of the
Code on Sanitation of the Philippines (P.D. 856), these rules and regulations are
hereby formulated for implementation and strict compliance of all concerned.
SECTION 1. SCOPE — These implementing rules and regulations shall apply to all
establishments, premises and facilities that are producing, processing,
manufacturing, handling storing, transporting, selling, distributing, using and
disposing the following: fertilizers, pesticides, heavy metals, chemicals, biological
agents and pollutants, radioactive materials, food additives, products emitting
ionizing and non-ionizing radiation and other products and by-products that may
cause harm to public health. These rules and regulations shall also apply to projects,
conditions or activities such as industry, transport, energy, infrastructure, food,
agricultural and other processes that may generate pollutants that are likely to
adversely affect public health.
SECTION 2. DEFINITIONS OF TERMS — As used in these rules and regulations,
the terms below shall be defined as follows.
2.1 CONSTRUCTION — any or all activity necessary or incidental to the alteration,
demolition, installation, assembling, or equipping of buildings, private or public
highways, roads, premises, parks, utility line, including line grading, excavation and
filling.
2.2 DISINFECTION — a process of reduction or elimination of the number of
potentially infectious microorganisms on an item or surface to safe levels.
2.3 ENVIRONMENT — all that which is external to the individual human host. It
includes the physical, biological, chemical, social or economic factors that can
influence human health.
2.4 ENVIRONMENTAL COMPLIANCE CERTIFICATE (ECC) — the document
issued by the DENR Secretary or the Regional Executive Director (RED) certifying
that based on the representations of the project proponent and the EIS prepares, as
reviewed and validated by the Environmental Impact Assessment Review
Committee (EIARC), the proposed project or undertaking will not cause a
significant negative environmental impact, and that the proponent has complied with
all the requirements of the Environmental Impact Statement (EIS) system.2.5 ENVIRONMENTAL HEALTH — the characteristics of environmental
conditions that affect the quality of health. It is the aspect of public health that is
concerned with those forms of life, substances, forces and conditions in the
surroundings or person that may exert an influence on human health and well-being.
2.6 ENVIRONMENTAL HEALTH ASSESSMENT REPORT (EHAR) — a report
issued by the duly authorized officer of the DOH (i.e., the Director of the
Environmental Health Service in case of health sensitive projects, and the Regional
Health Director in case of health sensitive project locations) which contains
comments, recommendations, and other inputs, that the proposed project, activity or
undertaking has undergone review by the DOH. This report shall be submitted by
the DOH to the DENR.
2.7 ENVIRONMENTAL HEALTH IMPACT ASSESSMENT (EHIA) — a formal
study used to predict and determine the positive and negative consequences of
developmental projects and existing environmental conditions on public health.
2.8 ENVIRONMENTAL HEALTH RISK ASSESSMENT (EHRA) — the use of
scientific methods and information to define the probability and magnitude of
potentially adverse health effects which may result from exposure to hazardous
materials or situations.
2.9 ENVIRONMENTAL IMPACTS — the probable effects or consequences of
proposed projects or undertakings on the physical, biological and socioeconomic
environment, which can be direct or indirect, cumulative, and positive or negative.
2.10 ENVIRONMENTAL IMPACT STATEMENT (EIS) — the document(s) of
studies on the environmental impacts of a project including the discussion on direct
and indirect consequences upon human welfare and ecological and environmental
integrity and the appropriate mitigating and enhancement measures.
2.11 ENVIRONMENTAL IMPACT STATEMENT SYSTEM — the entire process
of organization, administration, and procedures institutionalized for purposes of
assessing the significance of the effects of any project or undertaking on the quality
of the physical, biological and socioeconomic environment, and designing
appropriate preventive, mitigating and enhancement measures.
2.12 EXPOSURE — any contact between a potentially harmful agent present in an
environmental medium like air, water, food, soil, and surface of the human body like
the skin or the lining of the digestive tract or respiratory tract. Exposure can occur in
a number of routes like via inhalation, ingestion, direct skin or eye contact,
transplacental blood contact or injection directly into the body.
2.13 FERTILIZER — an organic or inorganic material that is added to soil to supply
elements essential to plant growth.
2.14 HAZARD — a source of danger; a qualitative term expressing the potential
that an agent or condition can cause harm.
2.15 HEALTH SENSITIVE PROJECT — a project, whose raw materials, by
products, intermediate products, finished products, waste, products, and otherprocesses during the construction, operation and decommissioning phases will pose
a significant health risk to the workers and the communities exposed. These
undertakings can be classified into major development projects such as, but not
limited to the following:
a. Heavy Industries (e.g., non-ferrous metal industries, iron and steel
mills, smelting plants, petroleum, and other petrochemical industries,
including oil and gas);
b. Resource Extractive Industries (e.g., major mining and quarrying
projects, forestry projects like logging, grazing and extraction of
mangrove products, fishery projects including dikes and fishpond
development projects);
c. Power Generation Operations (e.g., thermal, geothermal, hydroelectric,
nuclear, and other non-traditional sources of power and energy);
d. Infrastructure Projects (e.g., major dams, major reclamation projects,
major roads and bridges); and
e. Golf Course Projects
2.16 HEALTH SENSITIVE PROJECT LOCATION — a project located in an area
that meets any of the following characteristics:
a. Health sensitive project location defined by the presence of endemic
diseases in the area, presence of vulnerable environmental pathways
which can cause an exposure situation, and presence of significantly high
number of vulnerable sector of the community (children, elderly, sick and
differently-abled);
b. Areas such as national parks, wildlife preserves, watersheds and
aquifers where environmental damage may compromise the health of
resident communities dependent on these areas for their water, food and
other necessities vital to the maintenance of good health;
c. Areas traditionally occupied by indigenous cultural communities or
tribes where development may pose a significant impact on their health;
d. Areas classified as prime agricultural lands, bodies of water, mangrove
areas, coral reefs, and other locations used by nearby communities as
sources of income and sustenance; and
e. Areas frequently visited or hard-hit by natural calamities like volcanic
activities, earthquakes, floods, etc. that may affect or disrupt the project
cycle once located therein, and thereby pose additional hazards or risks to
the resident communities.
2.17 HEAVY METAL — metallic element with high molecular weight, generally
toxic to plant and animal life.2.18 INITIAL ENVIRONMENTAL EXAMINATION (IEE) — the document
required of proponents describing the environmental impact of, and mitigation and
enhancement measures for projects or undertakings located in an environmentally
critical area (ECA).
2.19 INITIAL HEALTH EXAMINATION (IHE) — part of the IEE which consists
of a list of health hazards which may have significant health risks, including
prevention and mitigating measures for projects or undertakings classified under
health sensitive project locations.
2.20 LOCAL HEALTH AUTHORITY — an official or employee responsible for the
application of a prescribed health measure in a local political subdivision. For a
province, the local health authority is the governor and for a city or municipality, the
mayor.
2.21 LOCAL HEALTH OFFICER — the Provincial, City or Municipal Health
Officer.
2.22 MULTIPARTITE MONITORING TEAM — a multisectoral team convened for
the primary purpose of monitoring compliance by the proponent with the ECC and
applicable laws, rules and regulations.
2.23 NOISE — an erratic, intermittent, or statistically random oscillation, or any
unwanted sound.
2.24 NUISANCE — anything that offends the senses, produces discomfort to the
community, may injure health or endanger life.
2.25 OBJECTIONABLE ODOR — any odor present in the indoor or outdoor
atmosphere that, by itself or in combination with other odors, is or may be harmful
or injurious to senses, interferes with comfortable use and enjoyment of life and
property, or creates a nuisance.
2.26 PERSONAL PROTECTIVE EQUIPMENT (PPE) — includes equipment
necessary for the protection of workers and other persons against bodily harm
resulting in sudden illness, occupational diseases or injury.
2.27 PESTICIDE — any substance or product, or mixture intended to control,
prevent, destroy, repel or mitigate pests. It includes insecticide, fungicide,
bactericide, nematocide, herbicide, molluscicide, avicide, rodenticide, plant
regulator, defoliant, desiccant, and the like.
2.28 POLLUTANT — any substance whether solid, liquid or gas, which has direct
or indirect impact on health, may alter the quality of the environment, imparts
objectionable odor, noise, temperature change, physical, chemical or biological
change to any segment of the environmental, or is in excess of allowable health and
environmental quality standards prescribed by the government.
2.29 POLLUTION — any alteration of the physical, chemical and biological
properties of any water, air and/or land resources of the Philippines, or any discharge
thereto of any liquid, gaseous or solid wastes as will or is likely to create or to rendersuch water, air and land resources harmful, detrimental or injurious to public health,
safety or welfare, or which will adversely affect their utilization for domestic,
commercial, industrial, agricultural, recreational or other legitimate purposes.
2.30 PROPONENT — any natural or juridical person intending to implement project
or undertaking.
2.31 REGIONAL HEALTH DIRECTOR — an official who heads the Department
of Health Regional Health Office.
2.32 RISK — a negative consequence or adverse effect of some action or inaction; a
quantitative term expressing the magnitude and probability of the adverse effect
occurring after an individual has been exposed to a specific amount of hazard.
2.33 SAFETY — the condition of being free from danger that may cause accident or
disease.
2.34 SANITARY ENGINEER — a person duly registered with the Board of
Examiners for Sanitary Engineers (Republic Act 1364) and who heads the sanitation
division/section/unit of the provincial/city/municipal health office or employed with
the Department of Health or its regional health offices.
2.35 SANITARY PERMIT — the certification in writing of the city or municipal
health officer or, in his absence, the chief or head of the sanitation
division/section/unit that the establishment complies with the existing minimum
sanitation requirements upon evaluation or inspection conducted in accordance with
Presidential Decree Nos. 522 and 856 and local ordinances.
2.36 SANITATION INSPECTOR — a government officer employed by the
national, provincial, city or municipal government, who enforces sanitary rules, laws
and regulations and implements environmental sanitation activities under the
supervision of the provincial/municipal/city health officer/sanitary engineer.
2.37 SCOPING — the stage in the EIS System where information and assessment
requirements are established to provide the proponent with the scope of work for the
EIS.
2.38 UNDERSECRETARY — the Undersecretary of Health, Office for Public
Health Services of the Department of Health.
2.39 VERMIN — a group of insects or small animals such as flies, mosquitoes,
cockroaches, lice, bedbugs, mice and rats that are vectors of diseases.
2.40 VERMIN ABATEMENT PROGRAM — a series of preventive and control
activities or procedures to eliminate or reduce the presence of vermin.
SECTION 3. ENVIRONMENTAL HEALTH ASSESSMENT REPORT (EHAR)
3.1 Coverage — The Environmental Health Assessment Report (EHAR) shall cover
(a) Health Sensitive Projects, and (b) Health Sensitive Project Locations. The
coverage shall include new development projects and projects being proposed forexpansion in terms of operations or area, or modification of processes.
3.2 Procedure
3.2.1 Health Sensitive Project — Proponents of health sensitive projects shall
conduct an environmental health impact assessment (EHIA) as part of the EIS
documents submitted to the DENR. Health sensitive projects shall be reviewed at the
national level by the DOH Environmental Health Service (EHS) in accordance with
the following procedures: (Please refer to Annex 1 for the flowchart)
a. The project proponent, after securing an application for ECC, shall
prepare for the conduct of the scoping meeting with DENR-EMB, Local
Government Units, Non-Government Organizations, EIA Review
Committee and other stakeholders, including the DOH.
b. Upon submission of the EIS documents by the proponent, the DENR-
EMB shall provide a copy of the EIS to DOH-EHS.
c. The DOH-EHS shall review the environmental health impact
assessment (EHIA) component of the EIS documents within thirty (30)
days from receipt thereof. The DOH-EHS shall invite, if necessary,
experts from other offices/units of the DOH in the review of the EIS.
d. After the DOH review process, the DOH reviewer(s) shall endorse the
findings and recommendations to the Director of Environmental Health
Service who shall approve or disapprove the issuance of the EHAR or
shall recommend the need for additional information from the proponent.
The EHAR shall be noted by the Undersecretary of Health before
transmittal to the DENR.
e. In case there is a need for additional information after the DOH review
process, the DOH-EHS shall inform the proponent through the DENR
Review Committee.
f. Upon the proponent's submission of additional information, the DENR-
EMB shall provide a copy to DOH-EHS.
g. The DOH-EHS shall review the additional information within thirty
(30) days upon receipt thereof. Upon completion of the review, the DOH
reviewer(s) shall endorse the findings and recommendations to the
Director of Environmental Health Service for the approval of the EHAR.
h. The EHAR shall be submitted directly to the DENR EIA Review
Committee within fifteen (15) days after the DOH review process. The
processing of the EHAR, however, may be prolonged depending on the
extent of the additional information that will be required.
3.2.2 Health Sensitive Project Location — Proponents of projects in health sensitive
location shall conduct an Initial Health Examination (IHE) as part of the IEE
documents submitted to the DENR Regional Office. Projects in health sensitive
location shall be reviewed by the DOH Regional Health Office-Technical Division(RHO-TD) in accordance with the following procedures: (Please refer to Annex 2
for the flowchart)
a. Upon submission of the IEE documents by the proponent, the DENR
Regional Office provides a copy of IEE to DOH-Regional Health Office
(RHO).
b. The DOH-RHO technical staff shall review the IHE component of the
IEE documents within fourteen (14) days from receipt thereof.
c. After the DOH-RHO review process, the DOH-RHO reviewer(s) shall
recommend to the Regional Health Director the approval of the EHAR or
the need to request for additional information from the proponent.
d. In case there is a need for additional information after the DOH-RHO
review process, the DOH-RHO shall inform the proponent through the
DENR Regional Office.
e. Upon the proponent's submission of additional information, the DENR
Regional Office shall provide a copy to DOH-RHO.
f. The DOH-RHO shall review the additional information within fourteen
(14) days upon receipt thereof. Upon completion of the review, the DOH-
RHO reviewer(s) shall recommend to the Regional Health Director the
approval of the EHAR.
g. The EHAR shall be submitted directly to the DENR Regional Office
within seven (7) days after the DOH-RHO review process. The
processing of the EHAR, however, may be prolonged depending on the
extent of the additional health information that will be required.
3.2.3 The Philippine National Framework and Guidelines for Environmental Health
Impact Assessment shall be the basis for the conduct of EHIA for health sensitive
projects and IHE for projects in health sensitive location and is hereby made part of
these implementing rules and regulations.
3.3 Contents of the Environmental Health Impact Assessment (EHIA) Report
— After classification or screening for health sensitive project or health sensitive
project location, the proponent shall collect the following environmental health data
for the EHIA report:
3.3.1 Baseline Health and Sanitation Information
a. Demographic Profile
b. Vital Statistics
c. Local Health Resources
d. Environmental Health and Sanitation Profilei. Water supply
ii.Human excreta management
iii.Waste management and disposal systems
iv. Food hygiene
v. Other baseline environmental data e.g., community noise levels, dust
and other air pollutants levels, ground water quality, quality of existing
bodies of water, soil quality and other parameters which may be
aggravated as a consequence of the development project).
3.3.2. Environmental Health Impact and Risk Assessment Component.
a. Description of the stages of the development project
b. Identification and description of environmental health sensitive
activities and processes during the various phases of the project
c. Identification of health hazards present during the project activities
d. Identification of impact population or receptors
e. Description of the health consequences
3.3.3 Control and Mitigating Measures
a. Management control measures
b. Health hazards control program
i. Engineering controls
ii.Administrative controls
iii.Personal protective equipment
iv. Community strategies and intervention to be implemented by the
proponent
c. Consequence recovery or mitigating measures
i. First-aid programs
ii. Medical emergency response strategies
iii.Community emergency and disaster plans
iv. Communication and warning strategiesv. Options for community rehabilitation and relocation
d. Health surveillance, evaluation and monitoring plans
i. Monitoring parameters (ambient sampling)
ii. Composition of monitoring teams
iii.Schedule and frequency of monitoring
iv. Costs allocation of monitoring expenses
v. Recording and reporting systems to regulatory agencies and other
stakeholders
3.4 Non-Coverage
3.4.1 Projects that do not meet the definition of Health Sensitive Project
or Health Sensitive Project Location shall submit a Health and Safety
Management Plan (HSMP) to the concerned DOH and DENR Regional
Offices. The pertinent sections of the Philippine National Framework and
Guidelines for Environmental Health Impact Assessment shall be the
basis for formulation of the HSMP.
3.4.2 The HSMP shall include the following components:
a. Project description
b. Listing of health and safety hazards in the workplace and those with
potential health impacts to the community
c. Statement of proposed strategies to prevent and control health and
safety hazards identified
d. Proposal for the proper management, evaluation, monitoring and audit
of the HSMP
3.5 Approval of the EHAR
3.5.1 The DOH shall issue the EHAR upon compliance with the
documents required and after the evaluation of the health impacts. The
EHAR which contains comments, recommendations, and other inputs
shall be submitted by, the DOH to the DENR.
3.5.2 Basis for the non-issuance of the EHAR shall be the following:
a. That the statement in the document submitted is false or misleading;
b. That the documents submitted are incomplete or failed to comply with
the provisions of these rules and regulations;c. That the proponent has failed to demonstrate or has not submitted the
necessary documents stating the health, sanitation and safety components
of the project; and
d. Other compelling reasons that may include adverse negative
consequences that may impact on public health and for which acceptable,
mitigation and control measures have not been fully satisfied by the
proponent.
3.5.3 The EHAR for Health Sensitive Project shall be sighed by the
DOH Reviewers, approved by the Director of Environmental Health
Service, and noted by the Undersecretary and shall be transmitted
directly to the DENR EIA Review Committee.
3.5.4 The EHAR for Health Sensitive Project Location shall be signed
by the DOH-RHO Reviewers and approved by the Regional Health
Director and shall be transmitted directly to the DENR Regional Office.
3.6 Environmental Health Advisory Committee — The Secretary of Health, as
Chairperson of the Interagency Committee on Environmental Health (IACEH), may
at any time refer matters to member agencies or groups of experts who have
authority on such fields in relation to the implementation of the EHIA process. The
Environmental Health Service shall act as the Secretariat to the Advisory
Committee.
3.7 Visitorial Power — The Secretary of Health or his duly authorized
representative shall have visitorial power to ascertain the compliance with the
existing commitments stipulated in the EIS document, standards, conditions and
requirements relative to public health and safety, within the context of the
Multipartite Monitoring Team (MMT) formed for such purpose.
3.8 Coordination with Other Agencies — The Secretary of Health or his duly
authorized representative shall coordinate with the Department of Environment and
Natural Resources and other agencies concerned in the implementation of the EHIA
process. dctai
SECTION 4. SANITARY PERMIT
4.1. No person or entity shall operate any establishment, premises or facility without
a Sanitary Permit issued by the local health officer.
4.2 Any extension or additional construction or alteration in an establishment shall
require a new sanitary permit before it can operate.
4.3. Application or Renewal of Sanitary Permit
4.3.1 The application or renewal of the sanitary permit shall be filed with the city or
municipal health office having jurisdiction over the establishment utilizing the
prescribed EHS Form.
4.3.2 Sanitary permit shall be issued only upon compliance to at least satisfactoryrating utilizing appropriate EHS standard forms for the type of establishment that is
being inspected.
4.3.3 Fees. The fees for the application, renewal and noting of the sanitary permit
shall be paid to the local government unit. The amount of fees shall be set through
city or municipal ordinance.
4.3.4 Noting of Permit. If there is a change in ownership of the establishment,
premises or facility covered by these rules and regulations, the new owner shall
apply to the city or municipal health office within fourteen (14) days to, have such
change noted in the records and permit certificate. The new owner shall pay the
corresponding fee for such noting.
4.3.5 Validity. The sanitary permit shall be valid for one (1) year, ending on the last
day of December of each year, and shall be renewed every first month of the year
thereafter. However for new establishments, the sanitary permit shall also expire at
the end of December of the current year.
4.3.6 Revocation or Suspension. Upon the recommendation of the local health
officer, the sanitary permit shall be suspended or revoked by the local health
authority upon violation of any sanitation rules and regulations.
4.3.7 Posting of Permit. The sanitary permit shall be posted in a conspicuous part of
the establishment and shall be available for inspection by authorized health and
other regulatory personnel.
4.3.8 Record of Permit.
a. Every city or municipality shall keep a record of all establishments that have been
issued sanitary permit and renewal thereof.
b. The record shall in every case show the following:
i. The name and address of the holder of the permit who in every case shall be the
actual occupant of the establishment;
ii. The location of the establishment;
iii.The nature and kind of business for which the permit has been issued;
iv. The date the first permit was issued and the dates of any renewal thereof;
v. Every change of occupation and management of the establishment since the first
permit was issued;
vi. Sanitary conditions under which the permit was issued or any renewal thereof
granted; and
vii.The revocation of the permit.
c. The record shall be available at all reasonable time for inspection by authorizedofficer of the Department of Health or the local government unit.
SECTION 5. SANITARY REQUIREMENTS
5.1 Site Requirements
5.1.1 The establishment, premises and facility shall be located only in areas or
zones designated by existing laws or ordinances for that type of establishment.
5.1.2 Suitable warning devices in workplaces where hazardous substances are
manufactured, handled, stored, transported and disposed shall be installed to alert
the personnel in case of the liberation of dangerous quantities of such substances.
5.2 Water Supply
5.2.1 The water shall be adequate and potable whether from a public or private
water supply system. The quality of drinking water used shall be in accordance with
the Philippine National Standards for Drinking Water.
a. All drinking Water sources shall have a certificate of portability of
drinking water issued by the local health officer.
b. A minimum of forty (40) liters of water per capita per day shall be
maintained.
5.2.2 The source, delivery, operation, examination and protective measures for
drinking water supply shall be in accordance with the provisions of Chapter II —
"Water Supply" of the Code on Sanitation of the Philippines (P.D. 856) and its
implementing rules and regulations.
5.3 Food and Drinks — Dispensing of food and drinks within the establishments
premises, and facilities covered by these rules and regulations shall be in accordance
with the provisions of Chapter III — "Food Establishments" of the Code on
Sanitation of the Philippines (P.D. 856) and its implementing rules and regulations.
5.4 Sewage Collection and Disposal — All sewage discharged from the
establishments shall be disposed in a public sewerage system, or in the absence
thereof, in a manner complying with the provisions of the Chapter XVII — "Sewage
Collection and Disposal, Excreta Disposal and Drainage" of the Code on Sanitation
of the Philippines (P.D. 856) and its implementing rules and regulations.
5.5 Solid Waste Management — Refuse segregation/separation, storage, collection,
transport and disposal shall be in accordance with the provisions of Chapter XVIII
— "Refuse Disposal" of the Code on Sanitation of the Philippines (P.D. 856) and its
implementing rules and regulations.
5.6 Vermin Control
5.6.1 A vermin abatement program shall be maintained in the
establishment by the operator. If they fail, neglect or refuse to maintain a
vermin abatement program, the local health office shall undertake thework at the expense of the operator.
5.6.2 The procedure and frequency of vermin abatement program shall
be determined by the local health officer and approved by the local health
authority.
5.6.3 Proper housekeeping and cleaning of surroundings shall be
maintained at all times by the owner or operator of the establishment,
premises or facility.
5.6.4 Owners or operators of establishments, premises or facilities shall
comply with the pertinent provisions of Chapter XVI — "Vermin
Control" of the Code on Sanitation of the Philippines (P.D. 856) and its
implementing rules and regulations.
5.7 Handwashing Facilities
5.7.1 Wash-hand basins shall be installed in convenient places and as
near as practicable to where the person for whose use they are provided
or in such locations as maybe otherwise prescribed by the local health
office.
5.7.2 If required in writing by the local health officer, additional wash-
hand basins shall be installed as near the toilet facilities as possible. The
installation of such shall be in accordance with the provisions of the
National Plumbing Code of the Philippines.
5.7.3 Wash-hand basins shall be maintained properly. Adequate supply
of water, soap, and hand drying facilities shall be provided to workers
and clients. The basins shall be maintained clean and in good repair at all
times.
5.8 Toilet Facilities
5.8.1 the operator shall provide adequate and clean toilet facilities for
male, female and differently-abled workers and clients.
5.8.2 The toilets shall be easily accessible to the workers and clients.
5.8.3 Toilet rooms shall be completely enclosed, properly lighted and
provided with adequate ventilation.
5.8.4 The number of water closets, urinals wash-hand basins and
showers shall depend on the general category of establishment. For
industrial establishments, the pertinent provisions of Chapter VII —
"Industrial Hygiene" of the Code on Sanitation of the Philippines (P.D.
856) and its implementing rules and regulations shall be complied. For
other types of establishments, pertinent provisions of other chapters of
P.D. 856 and existing standards of the DOH shall be complied.
5.9 Lighting and Ventilation — The general illumination and ventilation
requirements of specific implementing rules and regulations of P.D. 856 is herebyadopted and made as integral part of these implementing rules and regulations.
5.10 Sound and Vibration
5.10.1 Sound-absorbing materials shall be installed in all areas where
sound is produced to decrease reverberation.
5.10.2 Anti-vibration mountings shall be utilized for sound or vibration
producing equipment
5.10.3.Total enclosure of the establishment or facility or area where
sound and vibration are produced shall be required to prevent the escape
of noise that may disturb the neighboring communities.
5.10.4 Employees working in areas where sound level exceeds 75 dB
shall be provided with hearing protection equipment.
5.11. Change Rooms
5.11.1 Establishments, premises or facilities shall be provided with
change rooms for workers in accordance with specific implementing
rules and regulations of P.D. 856.
5.11.2 Change rooms shall be provided for each gender and shall be
located adjacent to the bathrooms.
5.11.3 Change rooms shall be provided with individual lockers, chairs
and lounges.
SECTION 6. REQUIREMENTS FOR PERSONNEL
6.1. No worker shall be allowed to work in the establishment, premises
or facility without an up-to-date health certificate issued by the city or
municipal health officer of the locality where the establishment is
situated.
6.2 Health Certificates (EHS Form 102-A & B) shall be issued after the
personnel has undergone physical and medical examinations and
immunizations. All certificates are non-transferable and shall be renewed
at least once a year.
6.3 The worker shall wear the health certificate while at work.
6.4. No worker suffering from communicable disease shall be allowed to
work in the establishment.
6.5. Workers shall wear clean working garments and shall observe good
personal hygiene and practices while working. Smoking and drinking
alcoholic beverages are not allowed while at work. The use of prohibited
drugs is likewise prohibited.
6.6. Workers shall be required to wear personal protective equipmentwhile working in areas exposed to pollutants and other hazards.
6.7 Workers shall be trained on procedures to prevent and control the
liberation of hazardous substances, eliminate pollution, and evacuate
from the affected area in orderly manner.
SECTION 7. SPECIFIC PROVISIONS
7.1 Pesticide and Fertilizer Establishments
7.1.1 No pesticide and fertilizer establishment shall operate without
securing appropriate clearances from concerned agencies as required
under P.D. 856, P.D. 1151, P.D. 1586, P.D. 1144, R.A. 6969 and other
relevant laws and regulations.
7.1.2 Every employer shall provide the workers with personal protective
equipment (PPE), protective shields and barriers whenever necessary.
7.1.3 All PPE shall be of the approved design and construction
appropriate for the exposure or the work to be performed.
7.1.4 Agricultural chemicals shall be handled and used only by trained
personnel.
7.1.5 Pesticides used in public health shall be handled only by accredited
urban pest control applicators.
7.1.6 The pertinent provisions of Chapter XVI — "Vermin Control" of
the Code on Sanitation of the Philippines (P.D. 856) and its implementing
rules and regulations shall be enforced.
7.2 Steel and Metal Industries
7.2.1 Steel and metal plants shall be located only in areas designated by
local zoning laws and ordinances.
7.2.2 Waste water and other discharges coming from steel and metal
plants shall be treated prior to its final disposal and shall conform to the
DENR standards for effluents.
7.2.3 Air emissions coming from steel and metal plants shall conform to
the DENR standards.
7.2.4 The workers shall wear personal protective equipment while at
work.
7.2.5 The local health office shall monitor the environmental health
effects to the communities within the impact zone as well as the
occupational health of all workers working thereat.
7.3 Electric and Electronic Industries7.3.1 High-tension transmission lines shall never pass overhead or
underground of residential areas.
7.3.2 Manufacturers of electrical or electronic products and other
products emitting radiation that may adversely affect the health and
safety of the people shall be required to secure clearance from the DOH
before selling their products.
7.3.3 The provisions of P.D 480 and the rules and regulations of the
Radiation Health Service of the Department of Health shall be applied
and enforced.
7.4 Transport Industries
7.4.1 All drivers, conductors and inspectors of public utility vehicles
shall be required to secure an up-to-date health certificate from the local
health office.
7.4.2 Emissions of all and motor transport vehicles shall conform to the
maximum allowable emission standard set forth under P.D. 1181
"Abatement, Control and Prevention of Vehicular Pollution" and its
implementing rules and regulations.
7.4.3 Land motor transport vehicles, particularly the public utility
vehicles and tricycles, shall not produce noise above 70 dB from source
such as engine, muffler or radio/stereo.
7.4.4 Blowing of horns shall be prohibited while passing public
buildings like courthouses, places of worships, schools, hospitals, offices
and other institutions. Local government units shall promulgate local
ordinances to this effect.
7.4.5 No residential area shall be established along the path of sonic
booms from airplanes/aircraft.
7.4.6 No airport shall be established in a place designated by zoning
laws and ordinances as residential areas.
7.5 Construction Industries
7.5.1 No vertical, horizontal or underground construction activities shall
be allowed to discharge or emit pollutants (water, air, soil, noise, odor)
that may adversely affect the health of the workers and the community.
Workers shall be protected from the effect of the activities by the proper
use of applicable PPE.
7.5.2 Harmful dust, gases and fumes present in an excavation shall be
rendered harmless by the installation of ventilators or other control and
mitigating measures to free the area from contaminants. Internal
combustion engine shall be operated in an excavation only whenprovision has been made to ensure that exhaust gases and fumes are
rendered harmless or discharged to a point away from the excavation.
7.5.3 Explosives, when used incidental to the construction works, shall
not cause or produce pollutants that may adversely affect the health and
safety of the nearby communities or the workers in the construction site.
7.5.4 Vertical construction works shall be well shielded or screened to
prevent the dissipation of dusts that are hazardous to workers and the
people outside the construction site.
7.5.5 Land development projects like golf courses, memorial parks,
subdivisions, industrial estates, sewerage and water supply projects and
construction requiring boring such as in geothermal development and
mining, shall ensure that the underground and surface water sources are
protected from pollution.
7.6 Health Care Facilities
7.6.1 The handling, storage, collection, transport and disposal of solid
and liquid wastes, particularly infectious, pathologic and hazardous
wastes, from health care facilities such as hospitals, clinics, laboratories
and other similar establishments, shall conform to the pertinent
provisions of Chapter XVII — "Sewerage Collection and Disposal,
Excreta Disposal and Drainage" and Chapter XVIII — "Refuse Disposal"
of the Code on Sanitation of the Philippines (P.D. 856) and their
implementing rules and regulations.
7.6.2 The owner or operator of the establishment shall provide personnel
of health care facilities handling biomedical wastes with appropriate
PPE.
7.7 Shops and Cottage Industries
7.7.1 Shops and other cottage industries using chemicals or other
materials that may produce pollution like water, air, soil, odor, noise shall
conform to specific provisions and implementing rules and regulations of
P.D. 856 and other relevant laws.
7.7.2 The escape and inhalation of fumes, gases or dusts shall be
prevented by the provision of local, natural or mechanical, or general
ventilation systems. The air shall be discharged to clear areas where it
can be easily diluted and shall not affect the neighborhood and the people
living in the community. The discharged air shall conform to the DENR
standards for air emissions.
7.7.3 The discharge of wastewater shall conform to the DENR standards
for effluents.
7.7.4 Shops and other cottage industries shall conform to the pertinent
provisions of Chapter VII — "Industrial Hygiene" and Chapter XIX —"Nuisances and Offensive Trade and Occupation" of the Code on the
Sanitation of the Philippines (P.D. 856) and their implementing rules and
regulations.
7.8 Sanitary Landfills and Other Garbage Disposal Areas — Sanitary landfills
and other garbage disposal areas shall conform to the provisions of Chapter XVIII
— "Refuse Disposal" of the Code on Sanitation of the Philippines (P.D. 856) and its
implementing rules and regulations.
7.9 Firecrackers, Explosives and Ammunition Industries
7.9.1 Firecrackers, ammunition and explosive plants/shops shall be
allowed only in areas designated by the local zoning ordinance for that
type of industry.
7.9.2 The owner or operator of such establishment shall institute
appropriate health, sanitation and safety measures to prevent, mitigate
and control adverse impact to public health and safety.
7.10 Ricemills and Lumberyards
7.10.1 Rice husks from rice mills (stationary or mobile) shall not be
stored and disposed in a manner that will create pollution. Storage and
disposal of rice husks shall conform to the provisions of Chapter XVIII
— "Refuse Disposal" of the Code on Sanitation of the Philippines (P.D.
856.) and its implementing rules and regulations.
7.10.2. Saw dusts and wood shavings from lumberyards shall not be
stored and disposed in a manner that will create pollution.
7.10.3 The owner or operator of ricemills and lumber yards shall
institute appropriate preventive, mitigation and control measures for the
protection of public health and safety.
7.11 Biomass Fuel
7.11.1 Wood, crop residues, animal dung, and other forms of biomass
shall not be used in establishments for cooking and/or heating fuels
unless the establishment has a satisfactory ventilation system.
Unprocessed solid fuels, like wood or coal shall not be used in
establishments even if they satisfy the ventilation requirement.
7.11.2 Open fire cooking, roasting and barbecuing in streets and other
crowded areas shall not be permitted.
7.12 Other Establishments, Premises and Facilities — Cement plants, car
assembling plants, battery plants, mining and quarrying plants, food manufacturing
and processing plants, abattoirs, funeral parlors and embalming establishments,
industrial and commercial complex, recreation facilities, and other similar
establishment, premises or facility that may create pollution shall conform to the
pertinent provisions of P.D. 856 and other applicable laws.SECTION 8. EVALUATION OF ESTABLISHMENTS
8.1 Responsible Officer — It shall be the duty of the city/municipal health officer
to cause the inspection and evaluation of every establishment, premises or facility
covered herein at least every three (3) months and to cause as many additional
inspections and re-inspections and evaluation as deemed necessary for the
enforcement of the provisions of these rules and regulations. Inspection of the
establishment shall be conducted within seven (7) working days after payment of the
inspection fee to the city/municipal treasurer concerned.
8.2 Sanitation Inspection Fee — The fees payable on every inspection shall be of
such amount prescribed by local ordinance.
8.3 Mission Order
8.3.1 The city/municipal health officer or the chief of the sanitation
division/section/unit of the local health office, as the case may be, shall
issue a mission order (EHS Form No. 112) for every sanitation inspection
that will be conducted by the sanitary engineer/sanitation inspector.
8.3.2 The mission order must contain the date, mission order number
and series, the name of the inspector and I.D. number, the business
names, addresses, categories of establishments to be inspected and the
scheduled dates of inspections. This must be shown to the
owner/operator of the establishment before any inspection is conducted.
The immediate supervisor of the inspector shall monitor the enforcement
of the mission order.
8.3.3 Sanitary inspection conducted without a mission order is
prohibited.
8.3.4 The owner/operator of the establishment shall report to the local
health officer or chief of sanitation division/section/unit any unauthorized
inspection that was executed.
8.4 Uniform of the Sanitation Inspector and Aids to Inspection
8.4.1 The sanitation inspector shall wear the prescribed uniform of the
office with the proper identification card while conducting the inspection.
8.4.2 He/She shall likewise bring all the equipment and supplies needed
in the inspection such as the inspection forms, clipboard, thermometer,
flashlight, measuring tape, camera, light meter, water pressure gauge,
residual chlorine and pH comparator kits, blacklight, copy of the
sanitation laws, regulations, standards and other reference materials
needed in the inspection.
8.5 Frequency of Inspections — Inspection of establishments, premises or facilities
covered herein shall be conducted at least once every three (3) months.
8.6 Recording of Inspection8.6.1 The sanitary engineer/sanitation inspector shall keep a record of all
inspections or evaluation reports in an inspection form (EHS Form No. 103-B).
8.6.2 The sanitary engineer/sanitation inspector shall furnish the original copy of
such report to the operator/owner of the establishment.
8.6.3 Demerits entered in the appropriate column of the inspection form shall
indicate that the item does not conform to the requirements of these rules and
regulations.
a. The inspection form has twenty (20) items. Non-complying items are indicated
with an (X). Every such item is weighted with a demerit of 5. The rating of the
establishment is therefore 100 less (number of demerits x 5). The result is expressed
as a percentage (%) rating.
8.6.4 Sanitation Standard
a. The percentage rating has an equivalent sanitation standard as follows:
Percentage Rating Sanitation Standard Color Code
90%-100% EXCELLENT Luminous Green
70 %-89 % VERY SATISFACTORY Luminous Yellow
50 %-69% SATISFACTORY Luminous Red
b. Establishment, premises or facility with percentage rating below 50%
shall be recommended for suspension of operation until compliance.
c. The Sanitation Standard Rating Sticker (SSRS) (EHS Form No. 104-
A/C) shall be posted in a conspicuous part of the establishment,
preferably at the door, for guidance of the general public. It shall, be
updated once every three (3) months, unless revoked earlier.
8.6.5 The average sanitation standard of every establishment shall be evaluated by
the local health officer/chief of the sanitation division/section/unit every end of the
year to determine its improvement/maintenance of rating.
8.7 Report of Inspection
8.7.1 The sanitary engineer/sanitation inspector who conducted the
inspection shall complete the sanitary inspection report, and whenever an
inspection form issued indicates non-complying items, he shall notify the
owner/operator of the corrections to be made and indicate a reasonable
period for its compliance.
a. The recommended corrective measures shall be specific in nature for
the easy understanding of the owner/operator of the establishment.
b. Reasonable period for compliance or grace period shall be inclusive of
Saturdays, Sundays and holidays.8.7.2 The sanitary engineer/sanitation inspector who conducted the
inspection shall likewise prepare a sanitary order (EHS Form No. 107)
for approval by the city or municipal health officer or chief of the
sanitation division/section/unit, as the case may be.
8.7.3 Within 48 hours after the inspection or evaluation, the original
copy of the inspection report (EHS Form No. 103-B) and the sanitary
order shall be furnished and acknowledged by the holder of the sanitary
permit or the owner/operator of the establishment. The inspection report
shall be personally delivered, or shall be sent through the postal service,
registered with return card.
8.8 Re-inspection
8.8.1 If upon re-inspection of the establishment after the deadline, the
sanitary engineer/sanitation inspector finds that the correction has not
been effected, he shall report to the health officer who shall recommend
to the local health authority the revocation of the sanitary permit.
8.8.2 A copy of the inspection form and any notice served shall, in all
cases be filed and kept by the local health office and be available for
inspection by authorized officials.
8.9 Service of Notice
8.9.1 Whenever an inspection or evaluation form indicates non-
complying items, the city/municipal health officer shall serve to the
owner/operator of the establishment a sanitary order requiring him,
within the grace period stated in the order, to take such remedial action as
may be specified therein.
8.9.2 In the event of non-compliance with the terms of the first sanitary
order by the owner/operator, the city/municipal health officer may serve
a second notice:
a. Second Sanitary Order
i. If the owner/operator of the establishment needs additional time to
comply with the first sanitary order, he shall request the city/municipal
health officer in writing, prior to the expiration of the sanitary order, for
an extension of the grace period. The city/municipal health officer, upon
the recommendation of the sanitary engineer/sanitation inspector who
conducted the inspection, will act on such request.
ii.Notice of Hearing (EHS Form No. 118). The city/municipal health
officer shall call the owner/operator of the establishment to show cause,
at a time and place stated in the notice, why the permit issued to the
establishment shall not be revoked.
8.10 Revocation of Permit8.10.1 After prior notice and hearing as provided above, the
city/municipal health officer, if satisfied that the terms of the two notices
have not been complied with or that failure to comply therewith is not
excusable, shall recommend to the local health authority the revocation
of the said permit, or;
8.10.2 After the second sanitary order on an extended grace period, a re-
inspection was conducted and still the owner/operator of the
establishment fails to comply with such order as reported by the sanitary
engineer/sanitation inspector, the city/municipal health officer shall
recommend to the local health authority the revocation of the sanitary
permit without delay and shall inform other related agencies of the
city/municipality of such revocation.
8.10.3 Lifting of suspension of permit may be recommended by the local
health officer to the local health authority whenever the owner/operator
of the establishment complies with the notices.
8.10.4 The owner/operator of the establishment may file a motion for
reconsideration to the local health authority if he is not satisfied with the
action of the city/municipal health officer.
8.10.5 The local health authority may file court proceedings against any
establishment continuously operating after the revocation of its permit.
8.11 Summary Suspension of Permits — Whenever the city/municipal health
officer finds unsanitary or unhealthy conditions in the operation of an establishment
which in his judgment constitute a substantial hazard to public health, the local
health officer may recommend to the local health authority the immediate
suspension of the sanitary permit. Any person to whom such order is issued may file
a written petition and shall be afforded a hearing within 48 hours.
8.12 Appeals — The person or panel conducting the hearing may confirm, modify
or reverse the decision appealed from which decision shall be final.
8.13 Power of Entry — Any sanitary engineer/sanitation inspector or duly
authorized officer of the Department of Health or of the provincial, municipal or city
health office, upon presentation of proper credentials may at all reasonable times
enter into any establishment, premises or facility used for any of the purposes
referred to in these rules and regulations for the purpose of inspection or any other
action necessary for administration of these rules and regulations.
8.13.1 Sanitary inspections shall be conducted by officials in accordance
with Section 8.3 of these rules and regulations.
8.13.2 Sanitary inspections shall be done preferably during the time
while the establishment is in operation.
8.14 Hearings — The local health authority may conduct hearings regarding erring
establishments to include appeals from establishments. The decision of the local
health authority shall be deemed final and executory.SECTION 9. RESPONSIBILITY OF THE OPERATOR — The operator shall:
9.1 Secure sanitary permit from the local health office before operating the
establishment, premises or facility.
9.2 Post the Sanitation Standard Rating Sticker (SSRS) in a conspicuous part of the
establishment.
9.3.Renew the sanitary permit as prescribed.
9.4 Prevent the escape of pollutants from the establishment, premises or facility by
installing pollution control devices.
9.5 Employ only workers with up-to-date health certificate.
9.6 Assist the local health office in the evaluation and inspection of the
establishment, premises or facility.
9.7 Submit regular reports to the local health authority the local health officer.
9.8 For proposed development projects for projects for expansion classified under
health sensitive projects and health sensitive project location, secure the necessary
clearances/permits from appropriate national government agencies.
9.9 Comply with the provisions of these implementing rules and regulations.
SECTION 10. RESPONSIBILITY OF THE REGIONAL HEALTH DIRECTOR. —
The regional director shall:
10.1 Assign technical staff or reviewers who shall assess/evaluate the Initial Health
Examination (IHE) component of the IEE for projects classified under health
sensitive project location.
10.2 Approve or deny the issuance of Environmental Health Clearance (EHC) for
projects in health sensitive location.
10.3 Coordinate with the DENR Regional Office and other additional information
from the project proponent to the DENR Regional Office.
10.4 Coordinate with the DENR Regional Office and other regional offices of
national government agencies in relation to the implementation of the EHIA process
and its integration with the EIS System at the regional level.
10.5 Review and approve the Health and Safety Management Plan submitted for
projects not covered by the EHIA process.
SECTION 11. RESPONSIBILITY OF THE LOCAL HEALTH AUTHORITY — The
local health authority shall:
11.1. Initiate and enforce local zoning ordinance.11.2. Certify the passing of an ordinance consistent to these rules and regulations
and to strengthen its enforcement.
11.3. Suspend or stop the operation of establishments violating the provisions of
these implementing rules and regulations.
11.4. Provide necessary supplies, materials and equipment and other logistic support
to the local health office for use in the conduct of evaluation, inspection and
monitoring of establishments covered by these implementing rules and regulations.
11.5. Enforce the provision of these implementing rules and regulations.
SECTION 12. RESPONSIBILITY OF THE LOCAL HEALTH OFFICER — The local
health officer shall:
12.1. Inspect or cause the inspection and evaluation of establishments, premises and
facilities to ascertain their compliance to these implementing rules and regulations.
12.2 Act on complaints against establishments, premises and facilities emitting or
discharging pollutants and institute necessary measures to prevent the spread of
diseases from such pollutants.
12.3. Monitor accidents and sickness of workers in establishments, premises and
facilities.
12.4. Issue the sanitary permit for establishments and the health certificates of
workers.
12.5. Require the posting of the sanitary permit in a conspicuous piece of the
establishment.
12.6. Implement the posting of the SSRS for the guidance of the general public.
12.7. Recommend to the local health authority the temporary or permanent closure
of establishments violating the provisions of these implementing rules and
regulations.
12.8. Assist the DOH in the implementation of EHIA process.
12.9. Enforce the provisions of these implementing rules and regulations.
SECTION 13. PENAL PROVISIONS
13.1. Any person who shall violate, disobey, refuse, omit or neglect to comply with
any of the provisions of these rules and regulations shall be guilty of misdemeanor
and upon conviction shall be punished by imprisonment for a period not exceeding
six, (6) months or by a fine not exceeding P 1,000.00 or both depending on the
discretion of the court.
13.2 Any person who shall interfere with or hinder, or oppose any officer, agent ormember of the Department of Health or of the bureaus and offices under it,
provincial, city or municipal health officers, sanitary engineers and sanitation
inspectors in the performance of his duty as provided for under these rules and
regulations, or shall tear down, mutilate, deface or alter any placard or notice affixed
to the premises in the enforcement of these rules and regulations shall be guilty of
misdemeanor and punishable upon conviction by imprisonment for a period not
exceeding six (6) months or by a fine not exceeding P 1,000.00 or both depending
on the discretion of the court.
SECTION 14. SEPARABILITY CLAUSE — In the event that any rule, section,
paragraph, sentence, clause or word of these implementing rules and regulations is
declared invalid for any reason, the other provisions thereof shall not be affected
thereby.
SECTION 15. REPEALING CLAUSE — All rules and regulations that are
inconsistent with the provisions of these implementing rules and regulations are
hereby repealed or amended accordingly.
SECTION 16. EFFECTIVITY — These rules and regulations shall take effect after
fifteen (15) days from the date of publication in the official gazette or a newspaper
of general circulation.
Adopted: April 16, 1998
(SGD.) CARMENCITA NORIEGA-REODICA, MD, MPH, CESO II
Secretary of Health
Source: Supreme Court E-Library
This page was dynamically generated
by the E-Library Content Management System (E-LibCMS)