Ang Kaalaman/search/irr/doc-80705/
IRR of R.A. No. 7942 (August 15, 1995)
Implements
R.A. No. 7942
(NAR) VOL. 6 NO. 3 / JULY - SEPTEMBER 1995
[ DENR ADMINISTRATIVE ORDER NO. 95-936,
August 15, 1995 ]
IMPLEMENTING RULES AND REGULATIONS OF REPUBLIC
ACT NO. 7942, OTHERWISE KNOWN AS THE "PHILIPPINE
MINING ACT OF 1995"
Pursuant to Section 8 of Republic Act (R.A.) No. 7942, otherwise known as the
"Philippine Mining Act of 1995", the following rules and regulations are hereby
promulgated for the guidance and compliance of all concerned.
Chapter I
Introductory Provisions
SECTION 1. Title - The title of this Administrative Order shall be "Implementing
Rules and Regulations of the Philippine Mining Act of 1995".
SECTION 2. Declaration of Policy - All mineral resources in public and private
lands within the territory and exclusive economic zone of the Republic of the
Philippines are owned by the State, it shall be the responsibility of the State to
promote their rational exploration, development, utilization and conservation
through the combined efforts of the government and private sector in order to
enhance national growth in a way that effectively safeguards the environment and
protects the rights of affected communities.
SECTION 3. Objectives - These rules and regulations are promulgated toward the
attainment of the following objectives:
a. To promote the rational exploration, development, utilization and conservation of
mineral resources under full control and supervision of the State;
b. To enhance the contribution of mineral resources to economic recovery and
national development, with due regard to the protection of the environment and the
affected communities as well as the development of local science and technical
resources;
c. To promote equitable access to economically efficient development and fair
sharing of benefits and costs derived from the exploration, development and
utilization of mineral resources; and
d. To enable the Government and the investor to recover their share in the
production, utilization and processing of minerals to attain sustainable development
with due regard to environment, social equity and fair return of investment.
Chapter II
DefinitionsSECTION 4. Definition of Terms - As used in and for purposes of these rules and
regulations, the following terms shall mean:
a. "The Act" refers to R.A. No. 7942 otherwise known as the "Philippine Mining Act
of 1995."
b. "Ancestral Lands" refers to all lands exclusively and actually possessed, occupied
or utilized by indigenous cultural communities by themselves or through their
ancestors in accordance with their customs and traditions since time immemorial,
and as may be defined and delineated by law.
c. "Annual Environmental Protection and Enhancement PROGRAM (AEPEP)"
refers to a yearly environmental management work plan based on the approved
environmental protection and enhancement strategy.
d. "Archipelagic Sea" refers to all waters within the baseline of an archipelago
except internal waters such as roadsteads, lakes and rivers.
e. "Block or Meridional Block" means an area bounded by one-half (1/2) minute of
latitude and one-half (1/2) minute of longitude, containing approximately eighty-one
(81) hectares.
f. "Bureau" means the Mines and Geosciences Bureau under the Department of
Environment and Natural Resources.
g. "Commercial Production" refers to the production of sufficient quantity of
minerals to sustain economic viability of mining operations reckoned from the date
of commercial operation as declared by the contractor or as stated in the feasibility
study, whichever comes first.
h. "Conservation" means the wise use and optimum utilization of mineral resources.
i. "Contiguous Zone" refers to water, sea bottom and substratum measured twenty-
four (24) nautical miles seaward from the baseline of the Philippine Archipelago.
j. "Contract Area" means the land or body of water delineated under a mineral
agreement or FTAA subject to the relinquishment obligations of the contractor and
properly defined by longitude and latitude.
k. "Contractor" means a qualified person acting alone or in consortium who is a
party to a mineral agreement or FTAA.
l. "Co-Production Agreement (CA)" refers to an agreement between the government
and the contractor wherein the government shall provide inputs to the mining
operations other than the mineral resource.
m. "Department" means the Department of Environment and Natural Resources of
the Republic of the Philippines.
n. "Development" means the work undertaken to explore and prepare an orebody or
a mineral deposit for mining, including the construction of necessary infrastructure
and related facilities.o. "Development Stage" as used exclusively for FTAAs means the period to prepare
an explored orebody or mineral deposit for mining including the construction of
necessary infrastructure and related facilities.
p. "Director" means the Director of the Mines and Geosciences Bureau.
q. "Ecological Profile or Eco-Profile" refers to geographic-based instruments for
planners and decision-makers which present A DESCRIPTION OF THE
ENVIRONMENTAL SETTING INCLUDING THE STATE OF
ENVIRONMENTAL QUALITY AND EVALUATION OF THE ASSIMILATIVE
CAPACITY OF AN AREA.
r. "Effluent" means ANY WASTEWATER, PARTIALLY OR COMPLETELY
TREATED OR ANY WASTE LIQUID FLOWING OUT OF MINING MILL
OPERATIONS, WASTEWATER TREATMENT PLANTS OR TAILINGS
DISPOSAL SYSTEM.
s. "Environmental Compliance Certificate (ECC)" refers to the document issued by
the Department certifying that the project under consideration will not bring about
an unacceptable environmental impact and that the proponent has complied with the
requirements of the Environmental Impact Statement System.
t. "Environmental Impact Assessment (EIA)" refers to a process which consists of
identifying and predicting the impact(s) of proposed projects and programs on the
physical, cultural, biological environment and on man's health and well-being,
RECOMMENDING MITIGATING MEASURES TO ADDRESS
ENVIRONMENTAL IMPACTS and interpreting/communicating information about
such impacts in a manner which can be utilized.
u. "Environmental Impact Statement (EIS)" refers to a document which aims to
identify, predict, interpret, and communicate information regarding changes in
environmental quality associated with a proposed project and which examines the
range of alternatives for the objectives of the proposal and their impacts on the
environment.
v. "Environmental Protection and Enhancement Program (EPEP)" refers to the
comprehensive and strategic environmental management plan for the life-of-the-
mining project from which annual environmental work programs are based and
implemented to achieve the environmental management objectives, criteria and
commitments including protection and rehabilitation of the disturbed environment.
w. "Exclusive Economic Zone" refers to the water, sea bottom and subsurface
measured from the baseline of the Philippine Archipelago up to two hundred (200)
nautical miles offshore.
x. "Existing Mining/Quarrying Right" means a valid and subsisting mining claim or
permit or quarry permit or any mining lease contract or agreement covering a
mineralized area granted/issued under pertinent mining laws.
y. "Exploration" means searching or prospecting for mineral resources by geological,
geochemical, geophysical surveys, remote sensing, test pitting, trenching, drilling,
shaft sinking, tunneling or any other means for the purpose of determining theexistence, extent, quality and quantity of mineral resources and the feasibility of
mining them for profit.
z. "Financial or Technical Assistance Agreement (FTAA)" means a contract
involving financial or technical assistance for large scale exploration, development
and utilization of mineral resources.
aa. "Force Majeure" means acts or circumstances beyond the reasonable control of
contractor including, but not limited to, war, rebellion, insurrection, riot, civil
disturbance, blockade, sabotage, embargo, strike, lockout, any dispute with surface
owners and other labor disputes, epidemic earthquake, storm, flood or other adverse
weather conditions, explosion, fire, adverse action by government or by any
instrumentality or subdivision thereof, act of God or of any public enemy, and any
cause not herein describe over which the affected party has no reasonable control.
ab. "Foreign-owned Corporation" means any corporation partnership, association or
cooperative duly registered in accordance with law in which less than fifty per
centum (50%) of the capital is owned by Filipino citizens.
ac. "Government" means the Government of the Republic of the Philippines.
ad. "Gross Output" means the actual market value of minerals or mineral products
from each mine or miners land operated as a separate entity, without any deduction
for mining, processing, refining, transporting, handling marketing or any other
expenses: Provided, That if the minerals or mineral products are sold or consigned
abroad by the Contractor under C.I.F. terms, the actual cost of ocean freight and
insurance shall be deducted: Provided, however That in the case of mineral
concentrates which are not traded in commodity exchanges in the Philippines or
abroad, such as copper concentrates, the actual market value shall be the world price
quotations of the refined mineral products content thereof prevailing in the said
commodity exchanges, after deducting the smelting, refining, treatment, insurance,
transportation and other charges incurred in the process of converting mineral
concentrates into refined metal traded in those commodity exchanges.
ae. "Indigenous Cultural Community" means a group or tribe of indigenous Filipinos
who have continuously lived as communities on communally-bounded and defined
land since time immemorial and have succeeded in preserving, maintaining, and
sharing common bonds of languages, customs, traditions, and other distinctive
cultural traits, and as may be defined and delineated by law.
af. "Joint Venture Agreement (JVA)" refers to an agreement where a joint venture
company is organized by the government and the contractor with both parties having
equity shares. Aside from earnings in equity, the government shall be entitled to a
share in the gross output.
ag. "Lessee" means a person or entity with a valid and existing mining lease
contract.
ah. "Metallic Mineral" means a mineral having a brilliant appearance, quite opaque
to light, usually gives a black or very dark streak and where a metallic
element/component can be extracted/utilized for profit.ai. "Minerals" refers to all naturally occurring inorganic substances in solid, liquid,
gas or any intermediate state excluding energy materials such as coal, petroleum,
natural gas, radioactive materials, and geothermal energy.
aj. "Mineral Land" means any area where mineral resources, as herein defined, are
found.
ak. "Mineral Processing" means the milling, beneficiation, leaching, smelting,
cyanidation, calcination or upgrading of ore(s)/minerals/rocks/mill tailings/mine
waste/other metallurgical by-products or by similar means to convert the same into
marketable products.
al. "Mineral Processing Permit" refers to the permit granted to a qualified person for
milling, beneficiation, leaching, smelting, cyanidation, calcination or upgrading of
ore(s)/minerals/rocks/mill tailings/mine waste/other metallurgical by-products or by
similar means to convert the same into marketable products.
am. "Mineral Products" means materials derived from mineral ores/rocks and
prepared into a marketable state by metallurgical processes which include, but not
limited to milling, beneficiation, cyanidation, leaching, smelting, calcination and
other similar processes.
an. "Mineral Resources" means any concentration of minerals/rocks with potential
economic value.
ao. "Mill Tailings" means, materials whether solid, liquid or both segregated from
the ores during concentration/milling operations which has no present economic
value to the generator of the same.
ap. "Mine Waste" means soil and/or rock materials from surface or underground
mining operations with no present economic value to the generator of the same.
aq. "Mineral Agreement" means a contract between the government and a contractor,
involving Mineral Production-Sharing Agreement, Joint Venture Agreement, or Co-
Production Agreement.
ar. "Mining Area" means a portion of the contract area identified by the contractor
for purposes of development, mining, utilization, and sites for support facilities or in
the immediate vicinity of the mining operations.
as. "Mining Operations" means mining activities involving exploration, feasibility
study, development, utilization and mineral processing.
at. "Mining Right" means any right to explore, develop, or utilize mineral resources.
au. "Mining Right Application" means any application for small-scale mining
permit, exploration permit, quarry permit, sand and gravel permit, guano permit,
gemstone gathering permit, mineral agreement or FTAA.
av. "Net Assets" refers to the property, plant and equipment as reflected in the
audited financial statement of the contractor net of depreciation, as computed for tax
purposes, excluding appraisal increase and construction in progress.aw. "Net Income" means gross income from operations less allowable deductions
which are necessary or related to mining operations.
ax. "Non-Metallic Mineral" refers to mineral usually having a dull luster, generally
light-colored, transmits light, usually gives either colorless or light colored streak
and where a non-metallic element/component can be extracted/utilized for a profit.
ay. "Non governmental Organization (NGO)" includes nonstock, nonprofit
organizations involved in activities dealing with resource and environmental
conservation, management and protection.
az. "Offshore" means the water, sea bottom, and subsurface from the shore or
coastline reckoned from the mean low tide level up to the two hundred (200)
nautical miles Exclusive Economic Zone including the archipelagic sea and
contiguous zone.
ba. "Onshore" means the landward side from the mean low tide elevation, including
submerged lands in lakes, rivers and creeks.
bb. "Ore" means naturally occurring substance or material from which a mineral or
element can be mined and/or processed for profit.
bc. "Ore Transport Permit" refers to the permit that may be granted to a contractor,
accredited dealer, retailer, processor and other mining permit holders to transport
mineral/mineral products.
bd. "Permittee" means the holder of an exploration permit. The permittee referred to
in previous administrative orders shall mean holders of permits subject of such
orders.
be. "Permit Holder" means a holder of any permit issued under these rules and
regulations other than exploration permit.
bi. "Private Land" refers to land belonging to any private person or entity which
includes alienable and disposable land being claimed by a holder, claimant or
occupant who has already acquired a vested right thereto under the law, although the
corresponding certificate or evidence of title or patent has not been actually issued.
bj. "Public Land" refers to land of the public domain which has been classified as
agricultural land, mineral land, forest or timber land subject to management and
disposition or concession under existing laws.
bk. "Qualified Person" means any Filipino citizen, with capacity to contract or a
corporation, partnership, association or cooperative organized or authorized for the
purpose of engaging in mining and with technical and financial capability to
undertake mineral resources development and duly registered in accordance with
law at least sixty per centum (60%) of the capital of which is owned by Filipino
citizens: Provided, That a legally organized foreign-owned corporation shall be
deemed a qualified person for purposes of granting an exploration permit, financial
or technical assistance agreement or mineral processing permit.bl. "Quarrying" means the process of extracting, removing and disposing quarry
resources found on or underneath the surface of public or private land.
bm. "Quarry Permit" means a document granted to a qualified person for the
extraction and utilization of quarry resources on public or private land.
bn. "Quarry Resources" refers to any common rock or other mineral substances as
the Director may declare to be quarry resources such as, but not limited to, andesite,-
basalt, conglomerate, coral sand, diatomaceous earth, diorite, decorative stones,
gabbro, granite, limestone, marble, marl, red burning clays for potteries and bricks,
rhyolite, rock phosphate, sandstone, serpentine, shale, tuff, volcanic cinders, and
volcanic glass: Provided, That such quarry resources do not contain metals or
metallic constituents and/or other valuable minerals in economically workable
quantities: Provided, further, That non-metallic minerals such as kaolin, feldspar,
bull quartz, quartz or silica, sand and pebbles, bentonite, talc, asbestos, barite,
gypsum, bauxite, magnesite, dolomite, mica, precious and semi precious stones, and
other non-metallic minerals that may later be discovered and which the Director
declares the same to be of economically workable quantities, shall not be classified
under the category of "Quarry Resources".
bo. "Regional Director" means the Regional Director of any Mines Regional Office
of the Department of Environment and Natural Resources.
bp. "Regional Office" means any of the Mines Regional Offices of the Department
of Environment and Natural Resources.
bq. "Royalty" means any payment over and above other existing taxes for the
utilization of minerals within a mineral reservation, indigenous cultural community,
or in areas covered by small-scale mining.
br. "Secretary" means the Secretary of the Department of Environment and Natural
Resources.
bs. "Service Contractor" means a person or entity who enters into an agreement to
undertake a specific work related to mining or quarrying operations of a
contractor/permittee/lessee/other mining permit holders.
bt. "Special Allowance" refers to payment to the claimowner or surface right owners
particularly during the transition period from P.D. No. 463 and Executive Order No.
279, Series of 1987.
bu. "State" means the Republic of the Philippines.
bv. "Tailings Disposal System" refers to a combination of methods, equipment and
manpower used in handling, transporting, disposal or impounding mill tailings.
bw. "Waste Dump Area" refers to a designated place where the mine waste are
accumulated or collected.
bx. "Utilization" means the extraction, mineral processing and/or disposition of
minerals.Chapter III
Government Authority
Section 5. Authority of the Department - The Department, thru the Secretary, shall
have the following authority, among others:
a. The Department is the primary government agency responsible for the
conservation, management, development, and proper use of the State's mineral
resources including those in reservations, watershed areas, and lands of the public
domain;
b. The Secretary shall have the authority to enter into mineral agreements on behalf
of the government or recommend FTAA to the President upon the recommendation
of the Director;
c. The Secretary is authorized to promulgate rules and regulations as may be
necessary to implement the intent and provisions of R.A. 7942;
d. The Secretary shall have the authority to enforce applicable related laws such as
Administrative Code, Civil Code, etc.; and
e. The Secretary may delegate such authority and other powers and functions to the
Director.
Section 6. Authority of the Bureau - The Bureau, which is transformed into a line
bureau consistent with Sec. 100 of the Act shall have the following authority, among
others:
a. To have direct charge in the administration and disposition of mineral lands and
mineral resources;
b. To undertake geological, mining, metallurgical, chemical and other researches as
well as geological and mineral exploration surveys;
c. To confiscate surety, performance, and guaranty bonds after notice of compliance;
d. To recommend to the Secretary the granting of mineral agreements or to endorse
to the Secretary, for action by the President, the grant of FTAAs, in favor of duly
qualified persons and shall monitor the compliance by the contractor of the terms
and conditions of the mineral agreements and FTAA. For this purpose, an efficient
and efficacious monitoring system shall be established to ascertain periodically
whether or not the objectives are realized;
e. To deputize, when necessary, any member or unit of the Philippine National
Police and barangay, duly registered and Department accredited Non Governmental
Organization (NGO) or any qualified person to police all mining activities;
f. The Director shall have the authority to enforce applicable related laws such as
Administrative Code, Civil Code, etc.; and
g. The Director may delegate such authority and other powers and functions to the
Regional Director.Chapter IV
Recording System and Mineral Gazette
SECTION 7. Mining Recorder Unit - The Bureau and its Regional and other offices
shall have a Mining Recorder unit in their respective offices to receive, record and
manage all mining documents submitted by concerned individuals or companies
relating to mining rights. However, same unit may be established in Provincial
Governor's/City Mayor's Office.
Documents relating to applications for mineral agreements, FTAAs exploration
permits and small-scale mining permits in mineral reservations shall be registered at
the Bureau.
Documents relating to applications for mineral agreements, FTAAs and exploration
permits outside mineral reservations, and industrial sand and gravel permits covering
more than five (5) hectares shall be registered at the Regional Offices.
Documents relating to applications for quarry permits, sand and gravel permits,
including industrial sand and gravel permits covering five (5) hectares or less, guano
permits, gemstone gathering permits and small-scale mining permits outside mineral
reservations shall be registered at the Provincial Governor's or City Mayor's office
where the applied area is located.
The functions of the Mining Recorder Unit shall include the following:
a. Pre-processing of applications particularly the documentary provisions of the
implementing rules and regulations of the Act;
b. Computation of fees to be paid by the applicant;
c. Recording of mining documents;
d. Providing information and advice on the status of applications;
e. Inputting data relating to applications, contracts, and permits into the mining
rights management system;
f. Organizing and maintaining record holdings on mining rights applications in
accordance with standard records management practices;
g. Issuing certifications and copies of mining documents;
h. Follow-up compliance of requirements needed in the processing of mining rights
applications; and
i. Projection/verification of area applied for either through the mining rights
management system or control maps of the unit if free from mining conflict.
SECTION 8. Mining Register - A mining register is a hardbound logbook, arranged
in rows and columns, for chronologically recording a set of documents received by
the Mining Recorder.
The following shall have their own mining register:a. Applications for mining rights:
1. Exploration permits;
2. Mineral agreements;
3. FTAAs;
4. Quarry, sand and gravel, guano, gemstone gathering permits; and
5. Small-scale mining permits
b. Mining rights involving:
1. Exploration permits;
2. Mineral agreements;
3. FTAAs;
4. Quarry, sand and gravel, guano, gemstone gathering permits; and
5. Small-scale mining permits
c. Miscellaneous Documents:
1. Powers of Attorney;
2. Deeds of Assignment/Transfer/Conversion;
3. Operating Agreements;
4. Protests or Adverse Claims; and
5. All other instruments concerning or affecting mining rights.
All applications for mining rights shall be recorded in their corresponding mining
register with the following information, among others:
a. Application number;
b. Date and time of filing;
c. Applicant's/Proponent's name;
d. Location;
e. Area applied for in blocks/hectares;
f. Official receipt number; and
g. Amount paid.
For approved mining rights, the contract or permit number and the contractor's or
permit holder's name should be recorded in lieu of application number and
applicant's/proponent's name, respectively.
All miscellaneous documents shall be recorded in their respective mining registers
containing the following information:
a. Date and time of filing;
b. Document or application number;
c. Entity involved;
d. Document title;
e. Page number;
f. Book number;
g. Year series;
h. Amount paid; and
i. Official receipt number.
SECTION 9. Administrative Fees Relating To Mining Registration - Before any of
the documents enumerated in Section 7 can be registered, payment of the required
fees in accordance with the rates specified in Annex 4-A* shall be made. The
amount, receipt number and time of payment shall be recorded in the appropriate
mining register.SECTION 10. Registration And Filing Procedures - Upon compliance with the
documentary requirements and payment of required fees, all documents subject for,
registration shall be recorded immediately in the appropriate mining register in black
ink by the Mining Recorder.
Copies of applications for mining rights and their supporting documents shall be
compiled with and bound in durable folders/boxes arranged chronologically and
each page of the document consecutively numbered starting from the bottom page of
the earliest document, herein referred to as a marked page. A document inventory
report indicating the contents of the folder/box beginning from the marked page
number 1 shall be maintained at all times. The document inventory report shall
contain the following:
a. Document control number;
b. Marked page number(s) of the document; and
c. Brief description of the document.
The document control number is a unique number recorded in the general receiving
and releasing logbook of the Bureau or Regional Office. The Regional Office shall
submit to the Bureau an annual document inventory report which shall serve as a
guide for easy retrieval and reconstruction of file in case of loss.
For miscellaneous documents, their physical files shall be compiled according to
type (that is, Special Power of Attorney, Deed of Transfer, etc.); numbered
consecutively in the order of time and date of receipt; and bound in a book form
beginning with Book 1, and where practicable, each book to contain two hundred-
fifty (250) documents. An inventory report of each book shall also be maintained
and provided to the Bureau annually. Original copies should be kept as restricted
files inaccessible to unauthorized persons. Photocopies or extra duplicate copies,
bound in book form, will be kept in shelves as working copies for public use.
Duplicate copies of miscellaneous documents shall be sent to the Bureau within
thirty (30) days from date of registration for archiving purposes: Provided, That a
certified photocopy issued and signed by the Mining Recorder could serve the
purpose in the absence of a duplicate copy.
SECTION 11. Mining Document Archive - A national mining document archive shall
be established at the Bureau and maintained by its Mining Recorder. Original or
duplicate copies of applications/contracts/permits and relevant documents sent by
Regional Offices shall be filed in this archive to produce a replica of the regional
records. Copies of these documents sent by Regional Offices shall contain the
control numbers and the marked page numbers written on the original document to
guide the filing of the records.
A microfilm or digital copy of each relevant record, if available, may replace the
paper records in the archive. The Bureau shall plan and acquire an efficient and
appropriate technology for archiving these documents.
SECTION 12. Mineral Rights Management System - In order to facilitate the
mechanical processing and recording of applications/contracts/permits and provide a
systematic basis for the management of data relating to
applications/contracts/permits, a computer-based mining rights management systemshall be established and maintained by the Bureau and its Regional Offices which
may be updated and improved as the need arises. This system should not only guide
and expedite the mechanical processing of applications but should also be capable of
building-up a national database and producing reports and maps that may be
required by the Bureau and its Regional Offices or requested by its clients, and
finking or interfacing with other mining industry-related systems which the Bureau
may later acquire or develop.
A set of standards covering procedures, programming, data codes, data definitions,
training, operating system/platform and related matters shall be established by the
Bureau to guide the operation and development of the system. A system
documentation and a user's manual shall be produced and maintained for each new
version.
A guideline on the operation and establishment of the responsibility of the Bureau
and its Regional Offices on the implementation of the system is given in Annex 4-
B*, which may also be updated as the need arises.
SECTION 13. Mineral Resources Database System - A mineral resources database
shall also be established at the Bureau AND OTHER BUREAUS/OFFICES OF
THE DENR to record all exploration and related data from its own projects and
those submitted by mining rights holders to serve as repository of such information
for national and regional policy and planning studies, monitoring and research
purposes. This database should be designed to be accessed by the mining rights
management system provided for in the previous section and other mining industry-
related systems to be established or acquired by the Bureau.
SECTION 14. Mineral Gazette Publication - To provide an official medium for
releasing information on mining policy issuances of the government, mining rules
and regulations, current listing of mining rights and their locations on the map, other
official acts affecting mining, and other information relevant to mineral resources
development, a mineral gazette of nationwide circulation shall be organized and
established by the Bureau. This gazette shall be published at least annually and be
made available to libraries of the Department, the Bureau, its Regional and District
Offices, U.P. LAW CENTER, the National Library, APPROPRIATE
INFORMATION OFFICERS OF PROVINCIAL GOVERNMENTS AND
MUNICIPAL OFFICES and such other places as may be determined by the
Director: Provided, That such gazette shall also be made available for subscription to
the public at a reasonable price.
SECTION 16. Recording System And Publication Fund - The Director and Regional
Directors shall ensure that adequate budget shall be allocated every year from their
regular appropriations to effect and sustain the physical filing and recording setup,
the publication of the mineral gazette and the development, operation and
maintenance of mining rights management system, the mineral resources database
system and other mining industry-related system which the Bureau may establish or
acquire.
Funds to be allocated for the mining rights management system shall include
adequate capital outlay for the purchase of the required softwares, hardwares and
support equipment and their subsequent upgrades. Funds shall also be provided for
transportation and travel expenses needed in troubleshooting, in-house training,repairs and upgrading of hardwares and related equipment, cost of supplies and
materials, cost of external training, subscription services, and cost of communication
services for data exchange and system coordination.
Chapter V
Scope of Application
SECTION 16. Areas Open to Mining Applications -The following areas are open to
mining applications:
a. Public or private lands not covered by valid and existing mining rights
and applications;
b. Lands covered by expired/abandoned/cancelled mining/quarrying
rights;
c. Mineral reservations; and
d. Timber or forestlands as defined in existing laws.
SECTION 17. Areas Closed to Mining Applications - Mining applications shall not
be allowed:
a. In military and other government reservations, except upon prior written clearance
by the government agency having jurisdiction over such reservations;
b. Near or under public or private, buildings, cemeteries, archaeological and historic
sites, bridges, highways, waterways, railroads, reservoirs, dams, or other
infrastructure projects, public or private works including plantations or valuable
crops, except upon written consent of the government agency or private entity
concerned in relevant sites subject to technical evaluation and validation by the
Bureau;
c. In areas covered by valid and existing mining rights;
d. In areas covered by existing mining applications;
e. In areas expressly prohibited by law;
f. In areas covered by small-scale mining under R.A. No. 7076/PD No. 1899 unless
with prior consent of the small-scale miners, in which case a royalty payment upon
the utilization of minerals shall be agreed upon by the parties, said royalty forming a
trust fund for the socio-economic development of the community concerned;
g. In old growth or virgin forests, proclaimed watershed forest reserves, wilderness
areas, mangrove forests, mossy forests, national parks, provincial/municipal forest,
parks, greenbelts, game refuge, bird sanctuaries, AND AREAS PROCLAIMED AS
TOURIST ZONES as defined by law and in areas expressly prohibited under the
National Integrated Protected Areas System (NIPAS) under R.A. No. 7586,
Department Administrative Order No. 25, Series of 1992 and other laws; and
h. Areas which the Secretary may include based, inter alia, on proper assessments of
their environmental impacts and implications on sustainable land uses.SECTION 18. Ancestral Lands - In areas covered by ancestral lands AND
DOMAINS that are related to EXISTING CIVIL RESERVATIONS AND
EXISTING CERTIFICATES OF ANCESTRAL domain CLAIMS OR which may be
covered by CERTIFICATES OF ANCESTRAL LAND DOMAINS or such similar
arrangements UNDER and pursuant to relevant FUTURE LEGISLATION, mining
applications may be allowed but shall not be granted without prior consent of the
concerned indigenous cultural community.
In the event that an ancestral land is opened for mining operations, the parties
concerned shall agree on the royalty payment for the indigenous cultural community.
A representative(s) from the Bureau and Office of Cultural Communities concerned
may be requested to act as mediator between the indigenous cultural community
concerned and the contractor/permittee in the negotiation for the royalty payment.
Said royalty shall form part of a trust fund for the socio-economic well-being of the
indigenous cultural community.
Chapter VI
Mineral Reservations and Other Government Reservations
SECTION 19. Establishment, Disestablishment or Modification of Boundary of a
Mineral Reservation - IN ALL CASES, THE DIRECTOR SHALL CONDUCT
PUBLIC HEARINGS ALLOWING ALL AFFECTED SECTORS AND
COMMUNITIES, INTERESTED NON-GOVERNMENTAL AND PEOPLE'S
ORGANIZATIONS AS WELL AS LOCAL GOVERNMENT UNITS TO AIR
THEIR VIEWS REGARDING THE ESTABLISHMENT, DISESTABLISHMENT
OR MODIFICATION OF ANY MINERAL RESERVATION. THE PUBLIC
SHALL BE NOTIFIED BY PUBLICATION IN A NEWSPAPER OF GENERAL
CIRCULATION IN THE PROVINCE AS WELL AS BY POSTING IN ALL
AFFECTED MUNICIPALITIES AND BARANGAYS AT LEAST THIRTY (30)
DAYS BEFORE THE PUBLIC HEARINGS.
THE RECOMMENDATION OF THE DIRECTOR SHALL BE IN WRITING
STATING THEREIN:
1. THE GROUNDS FOR THE ESTABLISHMENT,
DISESTABLISHMENT OR MODIFICATION OF ANY SPECIFIC
MINERAL RESERVATION, AND;
2. THIS SHALL LIKEWISE BE PUBLISHED AFTER SUBMISSION
WITH THE SECRETARY.
NO RECOMMENDATION OF THE DIRECTOR SHALL BE ACTED UPON BY
THE SECRETARY UNLESS THIS SECTION HAS BEEN STRICTLY
COMPLIED WITH.
Upon the recommendation of the Director, thru the Secretary, the President may,
subject to valid and existing rights, set aside and establish an area as a mineral
reservation when the national interest so requires, such as when there is a need to
preserve strategic raw materials for industries critical to national development or
certain minerals for scientific, cultural or ecological value. The Secretary, shall cause
the periodic review of existing mineral reservations by detailed geological, mineral
and ecological evaluation for the purpose of determining whether their continuedexistence is consistent with the national interest, and upon his/her recommendation,
the President may, by proclamation, alter or modify the boundaries thereof or revert
the same to the public domain without prejudice to prior existing rights: Provided,
however, That the Secretary, upon receipt of recommendation of the Director, shall
cause the publication of the establishment, disestablishment or modification of
boundary of a mineral reservation once a week for two (2) consecutive weeks in a
newspaper of general circulation AS WELL AS IN A NEWSPAPER OF POPULAR
LOCAL CIRCULATION COVERING THE AREA IN QUESTION AND
announcement thereof in a LOCAL POPULAR RADIO PROGRAM: Provided,
further, That prior to the approval by the President of the same, any opposition filed
within THIRTY (30) days from the last date of publication shall be resolved by the
Office of the President.
All submerged lands, within the archipelagic sea, contiguous zone and Exclusive
Economic Zone of the Philippines, are considered mineral reservations.
In the proclamation of such mineral reservations, all valid and existing
mining/quarrying rights shall be respected.
SECTION 20. Other Government Reservations - For reserved lands other than
mineral reservations, the Department may directly undertake exploration,
development and utilization of mineral resources. In the event that the Department
cannot undertake such activities, they may be undertaken by a qualified person:
Provided, That the right to develop and utilize the minerals found therein shall be
awarded by the President under such terms and conditions as recommended by the
Director and approved by the Secretary: Provided, further, That such right shall be
granted only after exploration activities reveal the presence of economically
potential deposits: Provided, finally, That the party who undertook the exploration of
said reservation shall be given priority.
SECTION 21. Mining Operations Within Mineral And Other Government
Reservations - Mining operations in existing mineral and other government
reservations and such other reservations as may hereafter be established shall be
undertaken by the Department or through a qualified person under any of the
following modes:
a. Exploration permit;
b. Mineral agreement;
c. Financial or technical assistance agreement;
d. Small scale mining; and
e. Quarry permit
Application for Exploration Permit/Mineral Agreement/FTAA/Quarry Permit within
mineral and other government reservations shall be governed by Chapters VII, VIII,
IX, XII of these rules and regulations.
Mining operations in government reservations other than mineral reservations shall
be first undertaken thru an exploration permit, subject to limitations prescribed
herein, before the same is open for mineral agreement/FTAA application or other
mining rights application.SECTION 22. Small-Scale Mining Operations Within Mineral Reservations - For
small-scale mining operations inside mineral reservations, the pertinent rules and
regulations provided for in MRDB A.O. No. 3, Series of 1984 and MRDB AO No 3-
A, Series of 1986, as amended (Annex 6-A* and Annex 6-B*) shall govern. Small-
scale mining cooperative covered by R.A. No. 7076 shall be given preferential right
to apply for a small-scale mining agreement for a maximum aggregate area of
twenty-five per centum (25%) of such mineral reservation subject to valid and
existing mining/quarrying rights.
SECTION 23. Payment of Royalty of Minerals/Mineral Products Extracted from
Mineral Reservations - The Contractors and holders of mining rights shall pay to the
Bureau a royalty which shall not be less than five per centum (5%) of the market
value of the gross output of the minerals/mineral products extracted or produced
from the mineral reservation exclusive of all other taxes. A ten per centum (10%)
share of all royalties, administrative fees, clearance fees, exploration fees, and other
related fees to be derived by the Government from the development and utilization
of the mineral resources within mineral reservations shall accrue to the Bureau as
trust fund and shall be deposited in a government depository bank to be allotted for
special projects and other administrative expenses related to the exploration,
development AND ENVIRONMENTAL MANAGEMENT of minerals in other
government reservations.
CHAPTER VII
EXPLORATION PERMIT
SECTION 24. General Provisions - Exploration activities may be directly
undertaken by the Bureau or in behalf of the contractor subject to reimbursement of
all expenditures. In the event that the Bureau can not undertake such exploration
activities, it may be undertaken by a qualified person in specified areas within
government and non-government reservations.
SECTION 25. Application for Exploration Permit - Any qualified person may apply
for an exploration permit (MGB Form No. 7-1) with the Regional Office concerned,
except offshore exploration permit applications which shall be filed with the Bureau,
through payment of the required fees (Annex 4-A) and submission of five (5) sets of
the following:
a. Clearance from the concerned government agency if the applied area
falls within government reservation;
b. Location map/sketch plan using NAMRIA topographic map in a scale
of 1:50,000 showing the geographic coordinates and boundaries of the
areas to be explored;
c. Work Program and Financial Plan prepared by a licensed geologist or
mining engineer for exploration covering the two-year period and the
subject area of the permit;
d. Environmental Work Program (EWP) to include an assessment of the
potential environmental effect of the proposed activities and mitigating
measures as provided for in Section 184 (c) hereof;e. Proof of technical capability including but not limited to list of
technical personnel and their bio-data;
f. Proof of financial capability to undertake the two (2) year work
program such as the following:
1. In case of individual - statement of assets and liabilities duly sworn to in
accordance with existing laws and income tax return for the preceding year of the
applicant; or
2. In case of corporation, association, cooperatives or partnership its Financial
Statement and Annual Report of the preceding year.
g. Articles of Incorporation or Partnership, by-laws, duly certified by the
Securities and Exchange Commission (SEC), in case of a corporation,
association, cooperative or partnership.
h. OTHER SUPPORTING PAPERS AS THE BUREAU MAY
REQUIRE OR THE PROPONENT MAY SUBMIT.
For offshore exploration permit applications the following additional requirements
shall be submitted:
a. The name, port of registry, tonnage, type and class of survey vessel(s)/platform:
Provided, That if a foreign vessel is to be used, the expected date of first entry or
appearance and final departure of the survey vessel shall be provided and all the
necessary clearances obtained;
b. A certification from the Coast and Geodetic Survey Department of the National
Mapping and Resources Information Authority (NAMRIA) that the proposed
exploration work was duly registered to provide update in the publication of "Notice
to Mariners" together with a list of safety measures to be regularly undertaken to
ensure the safety of navigation at sea and prevent accident;
c. An undertaking that the exploration work shall be carried out in a way that it shall
accommodate other marine activities such as fishing, aquaculture, transportation,
etc.; and
d. An agreement to:
1. Properly identity all installations, vessels and other crafts involved in
exploration recognizable to all vessels within reasonable distance;
2. Notify the Bureau 30 days prior to the intention to remove all scientific
installations or equipment and apparatus; and
3. Allow the Bureau's authorized personnel, Philippine Coast Guard and other
authorized persons during reasonable hours to board the vessel(s) while within
the Philippine Exclusive Economic Zone.
SECTION 26. Renewal of Exploration Permit - Within sixty (60) days before the
expiration of an exploration permit, the permittee may submit to, the Director, copy
furnished the Regional Director concerned, an application to renew the exploration
permit coupled with two (2) sets of the following:a. Justification of renewal;
b. Comprehensive and validated technical report on the outcome of the two-year
exploration works, including their environmental effects prepared by a licensed
geologist or mining engineer;
c. Audited report of expenditures incurred during the exploration period; and
d. Work Program and Financial Plan prepared by a licensed geologist or mining
engineer.
The Secretary may grant the renewal after field verification by the Bureau/concerned
Regional Office of the foregoing requirements.
SECTION 27. Maximum Areas for Exploration Permit - The maximum area that a
qualified person may apply or hold at any one time shall be:
a. Onshore in any one province -
1. For individuals - twenty (20) blocks or approximately 1,620 hectares; and
2. For partnerships, corporations, cooperatives or associations - two hundred
(200) blocks or approximately 16,200 hectares.
b. Onshore in the entire Philippines -
1. For individuals - forty (40) blocks or approximately 3,240 hectares; and
2. For partnerships, corporations, cooperatives or associations - four hundred
(400) blocks or approximately 32,400 hectares.
c. Offshore, in the entire Philippines - The maximum area that a qualified person
may apply or hold at any one time for offshore areas beyond five hundred meters
(500 m) from the mean low tide level shall be:
1. For individuals - one hundred (100) blocks or approximately 8,100 hectares; or
2. For partnerships, corporations, cooperatives, or associations - one thousand
(1,000) blocks or approximately 81,000 hectares.
SECTION 28. Posting of an Exploration Permit Application - Exploration permit
applicant shall, upon filing of the application, cause the posting of A SUMMARY
OF its exploration permit application for at least THIRTY (30) days in the bulletin
boards of affected provinces and municipalities; copy furnished the barangays IN A
LANGUAGE GENERALLY UNDERSTOOD IN THE LOCALITY AS WELL AS
publish the same IN A NEWSPAPER OF GENERAL CIRCULATION IN THE
AREA AFFECTED ONCE A WEEK FOR TWO (2) CONSECUTIVE WEEKS. The
summary of application must contain, among others, the name and complete address
of the applicant, duration of the permit, NATURE AND extent of THE
EXPLORATION, to be undertaken, area location, geographical coordinates of the
proposed permit area and location map/sketch plan with index map relative to the
nearest municipalities AND INFORMATION THAT ANY PARTY OPPOSING THE
EXPLORATION SHOULD FILE A WRITTEN COMPLAINT WITH THE PANEL
OF ARBITRATORS THROUGH THE DIRECTOR OR THE REGIONAL OFFICECONCERNED: Provided, That any such opposition/adverse claim shall be filed
within FORTY-FIVE (45) days from the last date of posting/publication.
No exploration permit shall be issued unless the posting/publication requirement
under this Section has been complied with AND ALL ISSUES RAISED BY ANY
PARTY OPPOSING THE EXPLORATION IS DEALT WITH IN WRITING BY
THE DIRECTOR.
SECTION 29. Registration of an Exploration Permit - Upon review and finding that
all the terms and conditions are in order and that the subject area has been cleared
from any conflict, the Director, in case of areas within mineral reservations or the
concerned Regional Director, in case of areas outside mineral reservations, shall
within thirty (30) days from such finding, approve and issue the exploration permit
and shall cause the registration of the same to the Bureau/concerned Regional Office
after payment of the required fees (Annex 4-A). In case of renewal, the Secretary,
within thirty (30) days from the recommendation of the Director, shall issue the
exploration permit (MGB Form No. 7-2).
SECTION 30. Terms and Conditions of an Exploration Permit - An exploration
permit shall contain the following terms and conditions:
a. The right to explore shall be subject to valid, prior and existing rights of any
party(ies) within the subject area. In case of offshore exploration it shall be in
accordance with the United Nations Convention on the Law of the Sea (UNCLOS);
b. The right to explore shall be for the exclusive use and benefit of the permittee or
his duly authorized representative and shall under no circumstances be used by the
permittee for purposes other than exploration;
c. The right to explore shall be for a period not exceeding two (2) years from date of
issuance, renewable for a term of two years each but in no case shall the total exceed
six (6) years: Provided, That the permittee has complied with the terms and
conditions of the permit and shall not have been guilty of any violations of the Act
and these rules and regulations;
d. The permittee shall submit to the Bureau/concerned Regional Office within thirty
(30) days after the end of each semester a report under oath of the work done
including the results of the survey, laboratory reports, geological reports/maps, EWP
IMPLEMENTATION and expenditures showing discrepancies/deviations with
approved exploration plans and programs and proposed expenditures or budget
subject to semi-annual inspection and verification by the Bureau/concerned Regional
Office at the expense of the permittee;
e. That the permittee shall annually relinquish at least 20% of the remaining permit
area during the first two years of exploration and at least 10% of the remaining
permit area thereafter. A separate report of relinquishment shall be submitted with a
detailed geologic report of the relinquished area accompanied by maps at a scale of
1:50,000 and results of analyses, and corresponding expenditures, among others;
f. The Secretary or his duly authorized representative shall annually review the
performance of the permittee;g. The permittee shall submit a final report upon the expiration of the permit or
conversion into mineral agreement or FTAA in a form and substance comparable to
published reports of respected international organizations and shall incorporate ail
the findings in the permit area, including locations of samples, assays, chemical
analyses and assessment of the mineral potential. Such report shall include complete
detailed expenditures incurred during the exploration;
h. In case of diamond drilling, the permittee shall, upon request of the
Director/Regional Director, submit to the Regional Office a quarter of the core
samples which shall be deposited in the Regional Office Core Library for
safekeeping and reference;
i. In case that the permittee applies for a Mineral Agreement or FTAA over the
permit area, the exploration period covered by the exploration permit shall be
included as part of the exploration period of the mineral agreement or FTAA; and
j. Other terms and conditions which the Bureau may deem appropriate.
SECTION 31. Rights and Obligations of a Permittee - A permittee shall have the
following rights and obligations:
a. An exploration permit shall grant to the permittee, his/her heirs or successors-in-
interest, the right to enter, occupy and explore the area.
b. In cases where private or other parties including surface owners, indigenous
cultural community and legitimate small-scale miners are affected, the permittee
shall first discuss or negotiate with the said party(ies) the extent, necessity and
manner of his/her entry, occupation and exploration. In case of disagreement, a
Panel of Arbitrators shall resolve the conflict or disagreement;
c. The permittee shall undertake an exploration work on the area as specified in its
permit based on an approved work program and financial plan: Provided, That any
significant change/negative variance of at least 20% in the exploration work
program and corresponding expenditures shall be subject to approval of the
Director/concerned Regional Director;
d. Any expenditure in excess of the yearly budget of the approved work and
financial program may be carried forward and credited to the succeeding years
covering the duration of the permit; and
e. For offshore exploration, the activities shall be carried out in such away that they
will not adversely affect the safety of navigation at sea, will not CAUSE UNDUE
ENVIRONMENTAL DAMAGE, and will ensure accommodation with other marine
activities such as fishing, aquaculture, transportation, etc.
SECTION 32. Transfer or Assignment - An exploration permit may be transferred or
assigned to another qualified person(s) subject to the approval of the Secretary upon
recommendation of the Director.
SECTION 33. Renunciation of Areas Covered by Exploration Permit - The permittee
may, at any time, renounce the whole or any portion of the total area covered by the
permit by filing a notice of renunciation with the Bureau/concerned Regional Office.SECTION 34.Cancellation of an Exploration Permit - The Director/concerned
Regional Director, may, at any time, cancel the Exploration Permit for failure of the
permittee to comply with any of the requirements, and violations of the terms and
conditions under which the permit is issued. In case of renewals, the Secretary, upon
the recommendation of the Director, shall cause the cancellation of exploration
permits.
Upon cancellation of the permit covering areas within government reservations, the
same, shall automatically revert to its original status.
SECTION 35. Effect of Renunciation, Relinquishment or Cancellation of
Exploration Permit - The foregoing provisions notwithstanding, renunciation,
relinquishment or cancellation shall not release the permittee .from any and all
obligations at the time of renunciation, relinquishment or cancellation from the
public or private party(ies).
SECTION 36. Declaration of Mining Project Feasibility - If results of exploration
reveal the presence of mineral deposits economically and technically feasible for
mining operations, the permittee may, within the term of the exploration permit, file
a declaration of mining project feasibility accompanied by a THREE - (3) year work
program for development. The approval of the declaration of mining project
feasibility shall grant the permittee the of mining project feasibility shall grant the
permittee the exclusive right to a mineral agreement or FTAA over the permit area:
Provided, however, That failure of the permittee to exercise such exclusive right
within a period of ONE (1) year, shall mean the automatic cancellation of the
declaration of mining project feasibility.
The application for mineral agreement or FTAA of a permittee shall be accompanied
by the following:
a. Project Feasibility Study (MGB Form No. 7-2);
b. Complete Geologic Report of the area;
c. Approved Survey Plan;
d. Environmental Compliance Certificate; and
e. Proof of award of the area by the President, for areas within
government reservations other than mineral reservation.
THE APPROVAL OF THE DECLARATION OF MINING PROJECT
FEASIBILITY SHALL ENTITLE THE HOLDER TO AN EXCLUSIVE RIGHT
TO A MINERAL PRODUCTION SHARING AGREEMENT OR OTHER
MINERAL AGREEMENT OR FINANCIAL OR TECHNICAL ASSISTANCE
AGREEMENT.
The processing of the application for a Mineral Agreement or FTAA shall be in
accordance with Chapters VIII and IX of these implementing rules and regulations.
CHAPTER VIII
MINERAL AGREEMENTS
SECTION 37. Kinds of Mineral Agreements and Nature Thereof - There are three (3)
kinds of mineral agreements, namely:a. Mineral production - sharing agreement - an agreement wherein the Government
grants the Contractor the exclusive right to conduct mining operations within, but
not title over, the contract area and shares in the production whether in kind or in
value as owner of the minerals therein. The Contractor shall provide the necessary
financing, technology, management and personnel;
b. Co-production agreement - an agreement between the Government and the
Contractor wherein the Government shall provide inputs to the mining operations
other than the mineral resources; and
c. Joint Venture Agreement - an agreement where a joint venture company is
organized by the Government and the Contractor with both parties having equity
shares. Aside from earnings in equity, the Government shall be entitled to a share in
the gross output.
SECTION 38. Eligibility - THE FOLLOWING CONDITIONS SHALL GOVERN
THE ELIGIBILITY OF APPLICANTS FOR A MINERAL AGREEMENT:
a. ANY QUALIFIED PERSON MAY BE ELIGIBLE TO APPLY FOR A
MINERAL AGREEMENT, PROVIDED THAT THE SAME PERSON/S SHOULD
POSSESS SATISFACTORY ENVIRONMENTAL MANAGEMENT TRACK
RECORD AS DETERMINED BY THE BUREAU IN CONSULTATION WITH
THE ENVIRONMENTAL MANAGEMENT (EMB) AS WELL AS SOCIO-
CULTURAL RELATIONS TRACK RECORD AS DETERMINED BY THE
SPECIAL CONCERNS OFFICE (SCO) OF THE DEPARTMENT. The detailed
guidelines for the determination of such track records shall be specified by the
Secretary.
b. THE APPLICANT CAN COMMIT THE NECESSARY FINANCIAL
RESOURCES AND STAFF WHO ARE REGULAR EMPLOYEES, QUALIFIED
TO CONDUCT ENVIRONMENTAL ASSESSMENT, and to FORMULATE AND
IMPLEMENT PROGRAMS FOR MEETING EXISTING ENVIRONMENTAL
PROGRAMS AND ENVIRONMENTAL REHABILITATION AND FURTHER,
such staff shall include sufficiently QUALIFIED personnel TO COMMUNICATE
AND RELATE EFFECTIVELY WITH COMMUNITIES AND SECTORS
DIRECTLY AFFECTED INCLUDING SPECIFIC INDIGENOUS CULTURAL
COMMUNITIES, IF INVOLVED.
THE DEPARTMENT, THROUGH THE SECRETARY, MAY PROVIDE FOR
SUCH OTHER REQUIREMENTS AS MAY BE NECESSARY GIVEN THE
PECULIAR CIRCUMSTANCES OF EACH APPLICANT.
IF A SIGNIFICANT PORTION OF THE OPERATIONS OF AN APPLICANT IS
BASED IN A FOREIGN COUNTRY OR COUNTRIES, THE DEPARTMENT
SHALL VERIFY THE RELEVANT REQUIREMENTS THROUGH THE
PHILIPPINE EMBASSY OR CONSULATE BASED IN SUCH COUNTRY OR
COUNTRIES.
The following qualified persons may directly apply for a mineral agreement:
a. In case of individual - must be of legal age, with capacity to contract,
and a citizen of the Philippines; orb. In case of a corporation, partnership, association, or cooperative -
must be organized and duly registered in accordance with law to engage
in mining and at least sixty per centum (60%) of the capital of which is
owned by the citizens of the Philippines.
SECTION 39. Maximum Areas Allowed - The maximum area that a qualified person
may apply or hold at any time under a mineral agreement shall be as follows:
a. Onshore, in any one province -
1. For individuals, ten (10) blocks or approximately eight hundred ten (810)
hectares; and
2. For partnerships, cooperatives, associations, or corporations, one hundred (100)
blocks or approximately eight thousand one hundred (8,100) hectares.
b. Onshore, in the entire Philippines -
1. For individuals, twenty (20) blocks or approximately one thousand six hundred
twenty (1,620) hectares; and
2. For partnerships, cooperatives, associations or corporations, two hundred (200)
blocks or approximately sixteen thousand two hundred (16,200) hectares
c. Offshore, in the entire Philippines -
1. For individuals, fifty (50) blocks or approximately four thousand fifty (4,050)
hectares;
2. For partnerships, cooperatives, associations, or corporations, five hundred (500)
blocks or approximately forty thousand five hundred (40,500) hectares; and
3. For the exclusive economic zone, a larger area to be determined by the Secretary
upon recommendation by the Director.
The maximum areas mentioned above that a contractor may apply or hold under a
mineral agreement shall not include mining/quarry areas under operating agreements
between the contractor and a claimowner/lessee/permittee/licensee entered into
under Presidential Decree No. 463.
SECTION 40. Acceptance of Mineral Agreement Applications - Five (5) sets of
Mineral Agreement application (MGB Form No. 8-1) shall be filed by the
applicant/proponent either personally or thru his/her duly authorized representative
to the Bureau for mineral reservation areas or to the concerned Regional Office for
areas outside mineral reservations: Provided, That any application that transcends
into mineral reservation or two (2) or more regions shall be filed with the
Bureau/concerned Regional Office which has the biggest area covered by the
application, copy furnished the other concerned office(s) by the proponent:
Provided, further, That a mineral agreement application shall be accepted only upon
payment of the required fees to the Bureau for areas within mineral reservations or
to the concerned Regional Office for areas outside mineral reservations (Annex 4-A): Provided, finally, That any application with incomplete mandatory requirements
shall not be accepted.
SECTION 41. Mandatory Requirements for Mineral Agreement Application - The
applicant/proponent shall submit at least two (2) sets of the following mandatory
requirements applicable to the type of agreement being entered into:
a. For Individuals -
1. Proof of sufficiency of capital and/or credit lines to undertake the work
program;
2. Program and Financial Plan duly prepared and signed by licensed Geologist,
Mining Engineer and/or Metallurgical Engineer;
3. Location plan/sketch map of the applied area IN RELATION TO MAJOR
ENVIRONMENTAL FEATURES AND OTHER PROJECTS using NAMRIA
topographic map in a scale of 1:50,000 duly prepared, signed and sealed by a
deputized Geodetic Engineer;
4. Environmental Work Program during exploration (MGB Form No. 19-2) or
Environmental Compliance Certificate prior to development/construction
and/or utilization;
5. Technical Competence of Applicant/Proponent - Proof of technical competence
shall be submitted by the applicant/proponent showing among others, the
names and bio-data of the technical men to undertake the operation pursuant to
submitted work program and track record in mining operations; and
6. In case the applicant/proponent has been in the mining industry for any length
of time he/she should possess a satisfactory environmental management track
record as determined by the Bureau in consultation with AND DULY
CERTIFIED BY the Environmental Management Bureau OR THE
REGIONAL ENVIRONMENTAL MANAGEMENT AND PROTECTED
AREAS SECTOR OFFICE of the Department.
7. COMMITMENT TO CONDUCT AN ENVIRONMENTAL IMPACT
ASSESSMENT AND SECURE AN ENVIRONMENTAL COMPLIANCE
CERTIFICATE PRIOR TO DEVELOPMENT/CONSTRUCTION AND/OR
UTILIZATION.
b. For Corporations, Partnerships, Associations or Cooperatives -
1. Certified photocopy of Certificate of Registration issued by the Securities and
Exchange Commission or the concerned authorized government agency;
2. Certified photocopies of the Articles of Incorporation/Partnership/Association
and By-Laws;
3. Proof of financial capability such as credit lines, bank guarantees and similar
negotiable instruments equivalent to the two (2)-year work program;
4. Work Program and Financial Plan duly prepared and signed by licensed
Geologist, Mining Engineer and/or Metallurgical Engineer;
5. Location plan/sketch map of the applied area IN RELATION TO MAJOR
ENVIRONMENTAL FEATURES AND OTHER PROJECTS using NAMRIA
topographic map in a scale of 1:50,000 duly prepared, signed and sealed by a
deputized Geodetic Engineer;
6. Environmental Work Program during exploration (MGB Form No. 19-2) or
ECC prior to development, construction and/or utilization;7. Environmental Management Track Record - In case the applicant/proponent
has been in the mining industry for any length of time; he/she should possess a
satisfactory environmental management track record as determined by the
Bureau in consultation with AND DULY CERTIFIED BY the Environmental
Management Bureau OR THE REGIONAL ENVIRONMENTAL
MANAGEMENT AND PROTECTED AREAS SECTOR OFFICE of the
Department; and
8. Technical Competence of Applicant/Proponent - Proof of technical competence
shall be submitted by the applicant/proponent showing, among others, the
names and bio-data of the technical men to undertake the operation pursuant to
submitted work program and track record in mining operations.
c. For holders of valid and existing mining lease contracts, operating agreements,
quarry permits/licenses or unperfected mining/quarry claims -
The following shall be submitted in two (2) sets in addition to the aforesaid
requirements, whenever applicable, to wit:
1. Certification from the concerned Regional Office that the mining/quarry
claims are valid and subsisting; and
2. Appropriate environmental report on the restoration; rehabilitation of mined-
out and/or mine waste/tailings covered-areas and anti-pollution measures
undertaken during the mining operations, if any.
3. ENVIRONMENTAL COMPLIANCE CERTIFICATE FOR ANY NEW
PHASE outside of the originally approved operation under THE MINING
PROJECT INCLUDING CONTINUATION OF DEVELOPMENT,
CONSTRUCTION AND UTILIZATION OF ITS FORMER PROJECT.
SECTION 42. Area Clearance - Within fifteen (15) working days from receipt of the
mineral agreement application, the concerned Regional Office(s) for areas outside
mineral reservation, or the Bureau for areas within mineral reservation, shall check
in the control maps if the area is free/open for mining purposes. The Regional Office
shall forward a copy of the location plan/sketch map of the applied area to the
DENR sector(s) affected by the mineral agreement application for area
clearance/comments, copy furnished the proponent who shall secure the necessary
clearance. Failure of the concerned sector(s) to submit area clearance/comments on
the proposed contract area within thirty (30) working days from receipt of the notice
shall mean that the concerned sector(s) do(es) not object to the opening of the
area(s) for mining purposes. Likewise, the concerned Office(s) which has
jurisdiction over the lesser area(s) of the application shall follow the same
procedure.
If the proposed contract area is open for mining purposes, the Bureau/concerned
Regional Offices shall give written notice to the applicant/proponent to pay the
corresponding clearance fee (Annex 4-A): Provided, That if a portion of the area
applied for is not open for mining purposes, the concerned Regional Office shall,
within fifteen (15) working days from receipt of said written notice, work out for the
exclusion of the same from the coverage of mineral agreement application.
SECTION 43. Publication/Posting of Mineral Agreement Application - The
concerned Regional Director in case of areas outside mineral reservation or the
Director in case of areas within mineral reservation shall cause the publication of themineral agreement application once a week for two (2) consecutive weeks in two (2)
newspapers, one of general circulation published in Metro Manila and another
published in the municipality or province where the contract area is situated, if there
be such newspaper, otherwise in the newspaper published in the nearest municipality
or province at the expense of the applicant/proponent within fifteen (15) working
days from receipt of notice for area clearance INCLUDING ANNOUNCEMENT IN
a LOCAL RADIO PROGRAM within the same period. The notice of publication of
mineral agreement application must contain, among others, the name and complete
address of the applicant/proponent, duration of the agreement, extent of operation to
be undertaken, area location, geographical coordinates of the proposed contract area
and location map/sketch plan with index map relative to MAJOR
ENVIRONMENTAL FEATURES AND PROJECTS AND TO the nearest
municipalities.
The Director or concerned Regional Director shall also cause the posting of the
application on the bulletin boards of the Bureau, concerned Regional Office(s) and
in the concerned province(s), municipality(ies), copy furnished the barangays where
the proposed contract area is located once a week for two (2) consecutive weeks IN
A LANGUAGE GENERALLY UNDERSTOOD IN THE LOCALITY. After
FORTY-five (45) days from the last date of publication/posting and no adverse
claim, protest or opposition was filed within said forty-five (45) days, the concerned
offices shall issue a certification that publication/posting has been made and that no
adverse claim, protest or opposition of whatever nature has been filed. On the other
hand, if there be any adverse claim, protest or opposition, the same shall be filed
within forty-five (45) days from the last date of publication/posting, with the
Regional Office concerned OR THROUGH THE DEPARTMENT'S COMMUNITY
ENVIRONMENT AND NATURAL RESOURCES OFFICERS (CENRO) OR
PROVINCIAL ENVIRONMENT AND NATURAL RESOURCES OFFICERS
(PENRO) TO BE FILED AT THE REGIONAL OFFICE for resolution by the Panel
of Arbitrators. However, previously published valid and subsisting mining claims are
exempted from the publication/posting required under this Section.
No mineral agreement shall be approved unless the requirements under this section
are fully complied with and any opposition/adverse claim IS DEALT WITH IN
WRITING BY THE DIRECTOR AND resolved by the Panel of Arbitrators.
SECTION 44. Evaluation of Mineral Agreement Application - Within fifteen (15)
days from the compliance of the publication/posting requirements and resolution of
adverse claim, protest or opposition, if any, the concerned Regional Director shall
evaluate and forward the mineral agreement application to the Bureau for further
review, evaluation and recommendation within fifteen (15) days from receipt of
forwarded documents. Thereafter, the Director shall endorse the same to the
Secretary for consideration and action of the same within fifteen (15) days from
receipt thereof.
However, incase of mineral agreement application within mineral reservations, the
same shall be evaluated and recommended by the Director to the Secretary for
consideration and action.
The concerned Regional Office shall regularly provide the Bureau a list,
CONSOLIDATED MAP, and status report of all mineral agreement applications
filed in its region.SECTION 45. Registration of Mineral Agreement - Upon approval of the mineral
agreement by the Secretary the same shall be forwarded through the Bureau for
numbering. The Bureau shall notify the Contractor to cause the registration of its
mineral agreement to the Bureau for mineral reservation areas or to the concerned
Regional Office for areas outside mineral reservation within fifteen (15) working
days from receipt of written notice. Registration of mineral agreement is effected
only upon payment of the required fees (Annex 4-A). The Bureau/Regional Office
shall officially release the mineral agreement to the Contractor after registration.
Failure of the Contractor to cause the registration of its mineral agreement within the
prescribed period shall be a sufficient ground for cancellation of the mineral
agreement.
SECTION 46. Terms and Conditions of a Mineral Agreement - The following terms
and conditions shall be incorporated in the mineral agreement:
a. All the necessary management, technology and financial services to be furnished
by the contractor;
b. The use of local goods and services to the maximum extent practicable, must be
given preference;
c. A condition that the contractor shall not acquire title to the contract area;
d. The stipulated share in revenues and manner of payment thereof;
A period of exploration not exceeding two (2) years from date of issuance of
agreement, renewable for a term of two (2) years each UNLESS AN
EXPLORATION PERMIT HAS BEEN GRANTED but in no case shall the total
exceed six (6) years;
f. A period not exceeding 25 years from date of execution, subject to renewal for
another period not exceeding twenty-five (25) years under the same terms and
conditions subject to changes mutually agreed upon by the parties and provided,
further, that such terms and conditions are not inconsistent with law and do not
prejudice the principle of sustainable development;
g. Obligatory relinquishment of portions of the contract area after the exploration
period which are not needed for development and utilization;
h. The contractor shall undertake an exploration work on the area as specified in its
agreement permit based on an approved work program and financial plan: Provided,
That any significant change/negative variance of at least 20% in the exploration
work program and corresponding expenditures shall be subject to approval of the
Director;
i. Provision on consultation and arbitration with respect to interpretation and
implementation of the agreement;
j. Employment and training of Filipino personnel;
k. Industrial safety and anti-pollution measures;l. Restoration and/or protection of the environment;
m. Transfer of technology to the government or local mining company;
n. A stipulation that all data and information gathered by the contractor shall be
furnished to the Bureau subject to verification and that all books of accounts and
records shall be open to inspection;
o. Commitment to RESPECT LOCAL CUSTOMS, VALUES AND TRADITIONS
AND SUPPORT LOCAL community development AND HUMAN RIGHTS; and
p. Such other terms and conditions as the Secretary may deem to be in the best
interest of the Government.
SECTION 47. Rights and Obligations of the Contractor - The Contractor shall have
the following rights and obligations:
a. Exclusively conduct mining operations within the contract area with full rights of
ingress and egress and the right to occupy the same;
b. Construct and operate any facilities specified in the mineral agreement or
approved work program;
c. Determine the exploration, mining and treatment process to be utilized in the
mining operations;
d. Extract, remove, use and dispose of any tailings as authorized by an approved
work program: Provided, That there will be no commercial disposition of the same;
and
e. Secure all permits necessary or desirable for the purposes of mining operations.
SECTION 48. Temporary Exploration Permit - Upon recommendation for approval
of the Mineral Agreement by the Secretary, the Director may, upon request of the
applicant, issue a temporary exploration permit subject to the applicable provisions
of Chapter VII of these implementing rules and regulations.
SECTION 49. Conversion of a Mineral Agreement into Any Mode of Mineral
Agreement or FTAA - A contractor may file for the conversion of its mineral
agreement into any mode of mineral agreement or financial FTAA at any time
during the term of the agreement subject to the approval of the Secretary. As such,
the Contractor shall notify the Secretary in writing of its intention to convert the
mineral agreement into any mode of mineral agreement or FTAA after payment of a
conversion fee (Annex 4-A) to the Bureau/concerned Regional Office. All revisions
into the mineral agreement, required by the conversion to any mode of mineral
agreement or FTAA, shall be submitted to the Secretary within sixty (60) days from
the filing of the applicant's intention to convert into any mode of mineral agreement
or FTAA: Provided, That the mineral agreement or FTAA shall only be for the
remaining period of the original agreement.
Upon compliance with all the requirements for such conversion by the Contractor,
the Secretary shall execute and approve, the mineral agreement and a copy thereofshall be submitted to the President. The approved mineral agreement or FTAA shall
then be registered with the concerned regional Office/Bureau within five (5) days
from approval of the same.
In case of conversion into FTAA, it shall be executed and approved by the President
and a copy thereof shall be submitted to Congress.
SECTION 50. Assignment/Transfer - A Contractor may file an application for the
assignment/transfer of its agreement, in whole or in part, to a qualified person(s)
upon payment of an application fee (Annex 4-A) to the Bureau/concerned Regional
Office. Any assignment or transfer of rights and obligations under any mineral
agreement shall be subject to the prior approval of the Secretary upon
recommendation of the Director: Provided, That any assignment or transfer of a
mineral agreement shall not be approved unless the assignor/transferor or contractor
has complied with all the relevant terms and conditions of the agreement and the
provisions of the Act and these implementing rules and regulations at the time of
assignment/transfer: Provided, further, That any assignment or transfer shall be
deemed automatically approved if not acted upon by the Secretary within thirty (30)
working days from official receipt thereof, unless patently unconstitutional or illegal
including such assignment or transfer being violative of concerned laws, rules and
regulations: Provided, finally, That THE TRANSFEREE SHALL COMPLY WITH
ALL ELIGIBILITY REQUIREMENTS AS SET FORTH IN SECTION 38,
CHAPTER VIII OF THESE IMPLEMENTING RULES AND REGULATIONS.
If circumstances warrant, the Secretary, motu propio or upon the recommendation of
the Director, may impose additional conditions prior to the approval of the
assignment/transfer.
SECTION 51. Withdrawal/Termination of Mineral Agreements - The contractor may,
by giving due notice at any time during the term of the agreement, apply for the
cancellation/termination of the mineral agreement due to causes which, in the
opinion of the contractor, make continued mining operations ho longer feasible or
viable. The Secretary shall consider the notice and issue his/her decision within a
period of thirty (30) working days: Provided, That the contractor has met all its
financial, fiscal, ENVIRONMENTAL and legal obligations at the time of
withdrawal/termination.
CHAPTER IX
FINANCIALOR TECHNICAL ASSISTANCE AGREEMENT (FTAA)
SECTION 52. Eligibility of Applicant for Financial or Technical Assistance
Agreement - Any qualified person with eligibility TO APPLY FOR A MINERAL
AGREEMENT, may enter into FTAA with the President thru the Secretary for large-
scale exploration, development and utilization of mineral resources as enumerated in
the succeeding section: PROVIDED, HOWEVER, THAT THE APPLICANT
SATISFIES ALL THE ELIGIBILITY REQUIREMENTS PRESCRIBED IN
SECTION 38, CHAPTER VIII OF THESE IMPLEMENTING RULES AND
REGULATIONS.
SECTION 53. Minerals Subject to FTAA - The following minerals may be subject to
FTAA:a. Gold;
b. Copper;
c. Nickel;
d. Chromite;
e. Lead and zinc;
f. Associated minerals of each of the above; and
g. Other strategic minerals as may be determined by the Bureau.
SECTION 54. Maximum FTAA Contract Area - The maximum FTAA contract area
for the exploration, development and utilization of mineral resources that may be
applied for or granted per qualified person in the entire Philippines shall be:
a. 1,000 meridional blocks onshore or approximately 81,000 has.;
b. 4,000 meridional blocks offshore or approximately 324,000 has.; or
c. Combinations of 1,000 meridional blocks onshore and 4,000 meridional blocks
offshore.
PROVIDED THAT, NO FURTHER AREA EXPANSION SHALL BE ALLOWED
DURING THE DURATION OF THE ORIGINAL AGREEMENT AND/OR
RENEWAL THEREOF.
The aforesaid FTAA contract area shall be subjected to a relinquishment of at least
twenty-five per centum (25%) of the contract area after two years of exploration and
at least ten per centum (10%) annual relinquishment of the remaining contract area
during the extension of the exploration period. Provided, That the contractor will
have the option to declare the percentage of the mining area that it would retain after
its relinquishment obligations subject to technical evaluation and approval by the
Secretary upon the recommendation of the Director. A separate report of
relinquishment shall be submitted with a detailed geologic report of the relinquished
area accompanied by maps in a scale of 1:50,000, and results of analyses and
corresponding expenditures, among others.
The minimum exploration expenditure for the relinquished area shall be based on
the approved exploration work program and financial plan.
SECTION 55. Mandatory Requirements - Upon payment of the required fees (Annex
4-A), a FTAA applicant shall file eight (8) sets of FTAA proposal with the concerned
Regional Office in case of areas outside mineral reservation or with the Bureau in
case of areas within mineral reservation to be accompanied by the following:
a. Upon filing of the proposal -
1. Articles of Incorporation, by-laws and SEC registration papers;
2. Latest Annual Audited Financial Statement and Annual Report, if any;
3. History of the company's mining operations for the previous years including
the names and curriculum vitae of technical staff;
4. Certified copies, if any, of exploration permits/contracts, operating contracts,
mining agreements, leases, permits, assignments, transfers or similar
agreements it has entered into with any focal or foreign juridical and natural
persons;5. Environmental Work Program covering the exploration period as provided for
in Section 186(c) hereof;
6. Location map/sketch plan indicating the positions of the proposed contract
area IN RELATION TO OTHER ENVIRONMENTAL FEATURES AND
MAJOR PROJECTS, duly prepared, signed and sealed by a deputized geodetic
engineer;
7. Proof of financial capability such as credit lines, bank guarantees and similar
negotiable instruments equivalent to the .amount of expenditures for the
approved two (2) year work program; and
8. Work Program and Financial Plan prepared by a licensed Geologist, Mining
Engineer and/or Metallurgical Engineer.
b. Before the approval of the FTAA - the proponent shall post a financial guarantee
bond upon notification by the Secretary.
c. Prior to construction, development and/or utilization -
1. Feasibility Study;
2. Approved survey plan of the mining area; and
3. Environmental Compliance Certificate.
SECTION 56. Area Clearance - A FTAA application shall be filed with the
concerned Regional Office in areas outside mineral reservation or to the Bureau in
areas within mineral reservation. Upon receipt of the application, the subject
contract area shall be closed to mining right applications for minerals mentioned in
Section 53 hereof, and quarry permit applications: Provided, That the
applied/contract area may be open to mining right applications for other minerals
subject to written consent of the FTAA applicant/contractor and verification of the
Bureau/concerned Regional Office: Provided, further, That if consent is
unreasonably withheld, the case shall be resolved by the Panel of Arbitrators.
The other applicant, however, can operate the area applied for pending resolution of
the case only after the posting of the bond to be determined by the
Director/concerned Regional Director.
Any FTAA proposal that transcends into mineral reservation or two or more regions
shall be filed with the Bureau/concerned Regional Office which covers the biggest
area, copy furnished the other region(s) by the proponent.
If the proposed contract area is open for mining purposes, the Bureau/concerned
Regional Office shall give written notice to the applicant/proponent to pay the
corresponding clearance fee (Annex 4-A).
The Bureau/concerned Regional Office thru the initiative of the proponent/applicant
shall check in the control maps if the area is open for mining location and
simultaneously furnish the affected DENR sector(s) for area
clearance(s)/comment(s) within thirty (30) days from receipt of the same. The
Bureau/Regional Office shall furnish the negotiating panel members a copy of the
FTAA proposal within five (5) days from the date of area clearance.
Likewise, the concerned Regional Office shall regularly provide the Bureau a list
and status report of FTAA proposals filed in its region.SECTION 57. Publication/Posting of FTAA - Within five (5) days from area
clearance, the concerned Regional Director in case of areas outside mineral
reservation or the Director in case of areas within government reservation shall
cause the publication of the FTAA application once a week FOR TWO (2)
CONSECUTIVE WEEKS in two (2) newspapers, one of general circulation
published in Metro Manila and another, published in the AFFECTED BARANGAY,
municipality or province IN A LANGUAGE GENERALLY UNDERSTOOD IN
THE LOCALITY where the contract area is situated, if there be such newspaper,
otherwise, in the newspaper published in the nearest municipality or province
INCLUDING announcement in A LOCAL RADIO PROGRAM
ANNOUNCEMENT. EXPENSES INCURRED IN COMPLIANCE WITH THE
PUBLICATION AND POSTING REQUIREMENTS SHALL BE CHARGED TO
THE APPLICANT.
The notice of publication for FTAA application must contain, among others, the
name and complete address of the applicant/proponent, proposed duration of, the
agreement, extent of operations to be undertaken, area location, geographical
coordinates of the proposed contract area, location map/sketch plan with index map
relative to MAJOR ENVIRONMENTAL FEATURES AND PROJECTS AND TO
the nearest municipalities AND INFORMATION THAT ANY PARTY OPPOSING
THE EXPLORATION SHOULD FILE A WRITTEN COMPLAINT WITH THE
DIRECTOR OR THE concerned REGIONAL DIRECTOR.
The Bureau/concerned Regional Director shall also, cause the posting of the
application on the bulletin boards of the Bureau, concerned Regional Office(s) and
in the affected province(s), and municipality(ies) where the proposed contract area is
located copy furnished the barangays, for two (2) consecutive weeks IN A
LANGUAGE GENERALLY UNDERSTOOD IN THE LOCALITY. After FORTY
FIVE (45) days from the last date of publication/ posting, the concerned offices shall
issue a certification that publication/posting has been made and that no adverse
claim, protest or opposition of whatever nature has been filed. On the other hand, if
there be any adverse claim, protest or opposition, the same shall be filed, within
forty-five (45) days from the last date of publication/posting, with the Regional
Office concerned OR THROUGH CENROS AND PENROS FOR FILING IN THE
REGIONAL OFFICE for resolution by the Panel of Arbitrators. However,
previously published valid and subsisting mining claims are exempted from the
publication/posting required under this Section.
No FTAA shall be approved unless the requirements in this section are fully
complied with and all issues raised by any party opposing the FTAA IS DEALT
WITH IN WRITING BY THE DIRECTOR AND resolved by the Panel of
Arbitrators.
SECTION 58. Evaluation of FTAA Application - All initial evaluations by the
members of the Negotiating Panel shall be submitted within fifteen (15) working
days from receipt of the proposal to the Bureau for its consolidation. The
consolidated initial evaluations shall be forwarded to the members of the
Negotiating Panel for further evaluation within fifteen (15) working days from
receipt thereof.
In evaluating the FTAA proposal, the Panel shall take into consideration the real
contributions to the Economic growth and general welfare of the country that will berealized, as well as the development of local scientific and technical resources.
SECTION 59. Negotiation of FTAA - The Negotiating Panel shall be composed of
the following:
a. The Secretary - Chairman
b. The Director - Vice Chairman
c. Representative from Board of
Investments, Department of Trade and
Industry - Member
d. Representative from the
Department's Field Operations - Member
e. Representative from the
Department's Legal Service - Member
f. Representative from the
Department's Environment Service - Member
g. Representative(s) from the
concerned Regional Office(s) - Member/s
The Panel upon being satisfied of the terms and conditions of the proposed FTAA
and with the applicant's compliance with all the requirements, shall recommend its
execution and approval to the President. Should the Panel, however, find some of the
terms and conditions unacceptable, it shall calendar the proposed FTAA for
negotiation and shall make the corresponding notification to the proponent. If after
the negotiation, the terms and conditions acceptable to the Panel have been
incorporated in the proposed FTAA, a resolution to that effect shall be made within
fifteen (15) working days and signed, at least, by the majority of the panel.
Thereafter, the Panel, shall forthwith recommend, to the President, for his
consideration and approval. The President shall notify Congress of the approved
FTAA within thirty (30) days from the date of FTAA approval.
SECTION 60. Registration - Upon approval of the FTAA by the President, the same
shall be forwarded, to the Bureau/concerned Regional Office, thru the Department,
for registration. The Bureau/Regional Office shall notify the Contractor to cause the
registration of the FTAA within fifteen (15) days from receipt of the written notice
Registration shall be effected only upon payment of the required fees (Annex 4-A).
The Bureau/Regional Office shall officially issue the FTAA to the contractor after
registration of the same. Failure to register the FTAA within the prescribed period
shall be a ground for cancellation of the agreement.
SECTION 61. Duration of FTAA - The FTAA shall have a term not exceeding twenty
five (25) years to start from the execution thereof and renewable for another period
not exceeding twenty five (25) years under such terms and conditions as may beprovided for by law. The activities of each phase of mining operations must be
completed within the following periods:
a. Exploration - period specified in FTAA of up to 2 years from date of FTAA
execution, extendible for another two (2) years;
b. Feasibility Study - up to 2 years from declaration of mining project feasibility;
and
c. Development, Construction and/or Utilization - remaining years of FTAA.
SECTION 62. Terms and Conditions - The following terms, conditions and
warranties shall be incorporated in the FTAA, to wit:
a. A firm commitment, in the form of a sworn statement during the existence of the
FTAA, that the contractor shall comply with a minimum expenditure obligation of at
least US four (4) million dollars during, the exploration and feasibility study periods
and at least US twenty-five (25) million dollars for infrastructure and development
or their equivalent in Philippine currency in case of Filipino qualified applicant, that
will be invested in the contract/mining area. In the event that the expenditure
commitment for exploration and feasibility study can not be met, the contractor shall
convert the FTAA into an MPSA in accordance with Section 65 hereof or withdraw
in accordance with Section 69 hereof;
b. A financial guarantee bond, letters of credit, certificate of bank deposits, and other
forms of negotiable instruments shall be posted in favor of the Government before
the approval of FTAA by the President, which shall be in any foreign currency
negotiable with the Bangko Sentral ng Pilipinas for foreign contractor or their
equivalent in Philippine Currency in case of Filipino qualified applicant for an
amount equivalent to the expenditure obligations of the applicant for any year;
c. Submission of proof of technical competence, such as, but not limited to, its track
record in mineral resource exploration, development and utilization, details of
technology to be employed in the proposed operation AS WELL AS
ENVIRONMENTAL MANAGEMENT and details of technical personnel to
undertake the mining operations, ENVIRONMENTAL PROTECTION AND
REHABILITATION;
d. Representations and warranties that the applicant has all the qualifications and
none of the disqualifications for entering into FTAA;
e. A stipulation that a contractor shall not acquire any title or interest in the FTAA
contract/mining area;
f. Representations and warranties that the contractor has or has access to all the
financing, managerial and technical expertise and, if circumstances demand, the
technology required to promptly and effectively carry out the objectives of the
agreement with the understanding to timely deploy these resources under its
supervision pursuant to the periodic work programs and related budgets, when
proper, providing an exploration period up to two (2) years, extendible for another
two (2) years but subject to annual review by the Secretary, in accordance with these
implementing rules and regulations;g. A stipulation that the contractor shall relinquish at least 25% percent of the
original contract area at the end of the exploration period and at least 10% percent of
the then remaining contract area at the end of each year by which the exploration
period is extended. After the exploration period and prior to or upon approval of
declaration of mining project feasibility, the contractor shall finally relinquish to the
Government any portion of the contract area which shall not be necessary for mining
operations and not covered by any declaration of mining feasibility with
corresponding submission of geologic report, and geologic and other pertinent maps
in the scale 1:50,000;
h. Representations and warranties that, except for payments for dispositions for its
equity, foreign investments in local enterprises which are qualified for repatriation,
and local supplier's credits and such other generally accepted and permissible
financial schemes for raising funds for valid business purposes, the contractor shall
not raise any form of financing from domestic sources of funds, whether in
Philippine or foreign currency, for conducting its mining operations for and in the
contract/mining area;
i. The mining operations shall be conducted in accordance with the provisions of the
Act and these implementing rules and regulations;
j. The contractor shall perform its activities within the periods expressed in the
FTAA plans and work programs, save as may be excused by force majeure;
k. Preferential use of goods and services produced and offered in the Philippines of
comparative quality. In particular, the contractor shall give preference to Filipino
construction enterprises and use buildings which can be constructed by using
materials and skills available in the Philippines, employ Filipino sub-contractors for
road construction and transportation, and purchase Philippine household equipment,
furniture and food;
l. A stipulation that the contractor is obligated to give preference to Filipinos in all
types of mining employment for which they are qualified and that the technology
shall be transferred to the same;
m. Requiring the proponent to effectively use appropriate anti-pollution technology
and facilities to protect the environment and to restore or rehabilitate mined-out
areas and other areas affected by mine waste/mill tailings and other forms of
pollution or destruction in compliance with the requirements of the Environmental
Compliance Certificate AND P.D. 984. THIS SHOULD BE UNDERTAKEN IN
COORDINATION WITH THE ENVIRONMENTAL MANAGEMENT BUREAU
OR THE DEPARTMENT'S REGIONAL OFFICE;
n. The contractor shall furnish the Government records of geologic, accounting and
other relevant data for its mining operations, and that book of accounts and records
shall be open for inspection by the Government;
o. Requiring the proponent to dispose of the minerals and by-products produced
under the FTAA at the highest market price and more advantageous terms and
conditions as provided for in these implementing rules and regulations;p. Provide for consultation and arbitration with respect to the interpretation and
implementation of the terms and conditions of the agreement;
q. Pay taxes, royalties, shares or obligations in accordance with existing laws, rules
and regulations;
r. A stipulation that alien employees shall be limited to technologies and executives
requiring highly specialized training and long experience and whose employment
shall be subject to the required approval under existing laws, rules and regulations
on the matter;
s. In every case where foreign technologies and executives are employed, an
effective program of training of understudies shall be undertaken;
t. Conform to laws and regulations regarding, among others, labor, safety,
demarcation of the contract/mining area and non-interference with the rights of other
mining contractors/operators/permit holder;
u. Recognize and respect the rights, customs and traditions of indigenous cultural
communities over their ancestral lands;
v. Contribute to national development by helping develop the host and neighboring
communities of the mining area, local geoscience and mining technology, and
mitigating environmental effects of mining operations;
w. A stipulation that the FTAA shall be cancelled for failure to comply with the
terms and conditions of the agreement;
x. The contractor shall undertake an exploration work on the area as specified in its
agreement permit based on an approved work program and financial plan: Provided,
That any significant change/negative variance of at least 20% in the exploration
work program and corresponding expenditures shall be subject to approval of the
Director; and
y. Such other terms and conditions not inconsistent with the Constitution, the Act
and with these implementing rules and regulations, as well as those which the
Secretary may deem to be for the interest of the State and the welfare of the Filipino
people.
SECTION 63. Rights and Obligations of a Contractor - The following are the rights
and obligations of the Contractor:
a. Exclusively conduct mining operations within the contract area with full rights of
ingress and egress and the right to occupy the same;
b. Construct and operate any facilities specified in the FTAA or approved work
program;
c. Determine the exploration, mining and treatment process to be utilized in the
mining operations;
d. Extract, remove, use and dispose of any tailings as authorized by an approved
work program: Provided, That there will be no commercial disposition of the same;and
e. Secure all permits necessary or desirable for the purposes of mining operations.
SECTION 64. Temporary Exploration Permit - Upon request of an FTAA applicant,
a temporary exploration permit may be issued by the Secretary while awaiting the
approval of the FTAA by the President. The temporary exploration permit shall be
governed by the applicable provisions of Section 48 of Chapter VIII of these
implementing rules and regulations.
SECTION 65. Conversion of FTAA into a Mineral Agreement - The Contractor may
file for the conversion of its FTAA into a mineral agreement at any time during the
term of the agreement, if the economic viability of the ores in the contract area is
found to be inadequate to justify large scale mining operations. As such, the
contractor shall notify the Secretary in writing of its intention to convert the FTAA
into mineral agreement under, terms and conditions of mineral agreement after
payment of a conversion fee (Annex 4-A*) to the Bureau/concerned Regional
Office. All revisions to the FTAA required by its conversion into a mineral
agreement, shall be submitted to the Secretary within six (6) months from the filing
of the applicant's intention to convert into mineral agreement. Provided, That the
mineral agreement shall only be for the remaining period of the FTAA.
In the case of a foreign contractor, it shall be given a period of one (1) year within
which to satisfy the sixty per centum (60%) Filipino equity, subject to an extension
of another one (1) year as may be approved by the Secretary taking into
consideration the economic and other relevant factors. Upon compliance with this
requirement by the contractor, the Secretary shall execute and approve the mineral
agreement and a copy thereof shall be submitted to the President. The approved
mineral agreement shall then be registered by the Contractor with the
Bureau/concerned Regional Office. Failure of the Contractor to meet the 60% equity
requirement within the prescribed period shall cause the forfeiture of the contractor's
right to such conversion.
SECTION 66. Filing of Application for Assignment/Transfer of FTAA - A FTAA
contractor may file, an application for the approval of ah assignment/transfer of its
FTAA, in whole or in part, with the President, upon payment of an application fee
(Annex 4-A) to the Bureau/concerned Regional Office. No application shall be
accepted for filing unless accompanied by a deed of assignment sought to be
approved.
SECTION 67. Approval of Assignment/Transfer of FTAA - Any assignment/transfer
of FTAA shall not be approved unless the assignor/transferor has complied with the
relevant terms and conditions of the Act and these implementing rules and regulation
at the time of assignment/transfer of FTAA, and the assignee/transferee is a qualified
person. If circumstances warrant, the Secretary, upon recommendation of the
Director, may impose additional conditions for the approval of assignment/transfer
of FTAA.
SECTION 68. Area Relinquishment - Where the contractor originally derived its
rights to the contract area from then claimowners or mining rights owners, such part
of the contract area relinquished pursuant to the provision of Section 54 hereof, shall
revert to the Government. Said claimowners or mining right owner shall havepreferential rights over the area: Provided, That within thirty (30) days from
notification of relinquishment by contractor, the former shall signify its intention to
enter into a mineral agreement with the Secretary. Provided, further, That all
documents necessary for mineral agreement application shall be submitted, within
sixty (60) days from receipt of such intention.
SECTION 69. Withdrawal from Financial or Technical Assistance Agreement - The
contractor shall manifest in writing to the Secretary its intention to withdraw from
the agreement, if in its judgment the mining project is no longer economically
feasible, even after it has exerted reasonable diligence to remedy the cause(s) or
situation(s.) The Secretary may accept the contractor's withdrawal from the FTAA.
Upon compliance or satisfaction of all the contractor's financial, fiscal,
ENVIRONMENTAL and legal obligations at the time of withdrawal, the Secretary
shall send an acceptance notice of withdrawal to the contractor; cause the opening of
the subject area to other purposes or land use; and release the contractor's financial
guaranty/performance bond.
SECTION 70. Cancellation/Revocation of FTAA - A FTAA may be cancelled under
any of the grounds provided for under Chapter XXIX of these implementing rules
and regulations.
CHAPTER X
SURVEY OF CONTRACT/MINING AREAS
SECTION 71. Identification of Meridional Blocks - A system for identifying
meridional blocks other than geographic coordinates shall be established by the
Bureau. The boundaries of contract/mining area shall coincide with the full one
minute or one-half minute of latitude and longitude based on the NAMRIA map. In
cases where such boundaries are not attainable due to geographic features,
ENVIRONMENTAL CONSIDERATIONS, existence of adjoining valid mining
rights or concessions, other areas closed to mining locations, settlement of conflicts
and other justifiable considerations that render it impractical to conform with such
requirements, the boundaries shall be defined by specific technical description.
SECTION 72. Filing of Application for Survey - A permittee/contractor shall file an
application for order of survey of the perimeter boundary of the contract/mining area
simultaneous with the submission of the Declaration of the Mining Project
Feasibility and to be accompanied by the following:
a. One (1) set of certified true copy of approved Exploration Permit/FTAA/Mineral
Agreement;
b. Pertinent documents such as deed of assignment and power of attorney duly
registered with the Bureau/concerned Regional Office;
c. A notarized survey service contract executed by and between the
permittee/contractor and the deputized geodetic engineer, except when the deputized
geodetic engineer is employed by the applicant and/or company interested in the
survey: Provided, That proof of employment of the deputized geodetic engineer is
submitted;d. Affidavit of the deputized geodetic engineer representing that he/she can execute
the survey of the area and to submit the complete survey returns thereof within the
period prescribed by these implementing rules and regulations;
*
e. A surety bond (Annex 4-A ) for order of survey, which shall be forfeited for
failure of the deputized geodetic engineer to execute and/or comply with his/her
obligations; and
*
f. Proof of payment of the required fees (Annex 4-A ).
However, any Contractor or applicant whose MPSA/FTAA agreement/application
was granted/filed in accordance with the implementing rules and regulations of E.O.
No. 279, may avail the provision of this Section.
SECTION 73. Issuance of Order of Survey - Upon verification of the application for
Order of Survey (MGB Form No. 10-1) and compliance with the requirements in the
preceding section, the Director/concerned Regional Director shall issue the order of
survey in the prescribed form (MGB Form No. 10-2).
SECTION 74. Who May Execute Mineral Land Surveys - Mineral land surveys shall
be executed by geodetic engineers of the Bureau/Regional Offices, deputized
geodetic engineers in private practice and company-employed deputized geodetic
engineers.
SECTION 75. Execution of Mineral Land Surveys - Corners of the contract or
mining area shall be defined by monuments placed at intervals of about four hundred
fifty (450) meters apart. When the boundary lines of the permit/contract area
traverses mountain or rolling terrain, the intermediate monuments between corners
shall be established on ridges, whenever practicable, in which cases, all consecutive
corners shall be intervisible.
The corner monuments of a permit/contract or mining area shall be as follows:
a. 20 cm. x 20 cm. x 50 cm. concrete rectangular monuments set 40 cm. in the
ground for principal corners which fall on points with exact minutes or half minute
of latitude and longitude; and
b. 15 cm. in diameter x 50 cm. long set 40 cm. in the ground for other corners of the
permit/contract or mining area.
Such corners of the permit/contract or mining area shall be identified by concrete
monuments or cement patches on boulders centered with a hole, spike, pipe or nail
and marked with the corresponding corner numbers and survey numbers. The
latitude and longitude of the principal corners shall also be indicated on the sides of
the concrete monuments when they coincide with the full one (1) minute and/or one-
half (1/2) minute of latitude and longitude.
When the permit/contract or mining area adjoins submerged land, a witness corner
monument along the boundary leading to the shoreline shall be set on the ground to
witness the boundary point-corner of the mining rights at the mean low tide level of
the sea or lake. Concrete monuments, galvanized iron pipes, fixed rocks, boulders orstakes and other monuments shall be set to define the corners of the mining rights
along the shoreline at mean low tide level.
All area computations, plans and maps of permit/contract or mining areas to be
submitted to the Bureau/Regional Office for verification and approval shall be
prepared using the Philippine Plane Coordinate System (Annex 10-A*).
Should any discrepancy of datum plane between or among tie points arise, proper
investigation shall be conducted by the Bureau/concerned Regional Office and a
report thereon shall be submitted to form part of the survey returns for further
investigation and record purposes.
Survey plans of permit/contract or mining areas recorded under these implementing
rules and regulations shall be drawn to scale in drawing ink on the prescribed form
(MGB Form No. 10-3).
The execution of mineral lands surveys shall be in accordance with these
implementing rules and regulations, as supplemented by the applicable provisions of
the Revised Manual of Lands Surveys of the Philippines pursuant to Lands
Administrative Order No. 4, dated July 3, 1980: Provided, That PRS-92 may be used
in the execution of mineral land surveys during the transition period (1993-2000)
pursuant to the provisions of DAO No. 22, Series of 1994: Provided, further, That
reference points enumerated in Annex 10-C can still be used if standardized and
converted into PRS-92 subject to implementing guidelines that may hereinafter be
issued.
SECTION 76. Submission of Survey Returns - Survey returns shall be submitted to
the Director/concerned Regional Director within one (1) year from receipt of the
order of survey, and shall consist of the following:
a. Duly notarized field notes with cover (MGB Form No. 10-4) accomplished,
signed and sealed by a deputized geodetic engineer;
b. Azimuth computations from astronomical observations (MGB Form No. 10-5),
topographic survey computations (MGB Form No.10-6), traverse computations
(MGB Form No. 10-7), area computations (MGB Form No. 10-8), coordinate
conversion - geographic to grid (MGB Form No. 10-9) and coordinate conversion -
grid to geographic (MGB Form No. 10-10) and other reference computations, all in
sets of original and duplicate, properly accomplished and signed by a deputized
geodetic engineer;
c. Microfilm plan(s) in appropriate scale duly accomplished with the corresponding
working sheet thereof;
d. Descriptive and field investigation report on the permit/contract or mining area in
quintuplicate, duly signed by the deputized geodetic engineer and authorized
assistant, if any, and duly notarized; and
e. A certification under oath by the Barangay Chairman that the survey was actually
undertaken in the locality.Incomplete survey returns, however, shall not be accepted for verification and
approval purposes.
Except for reasons of force majeure, failure to submit the survey returns within the
prescribed period shall cause the cancellation of the permit/mineral
agreement/FTAA. If the survey returns are filed through the mail, the date appearing
on the postmark shall be considered as the date of filing. However, the contractor
and/or concerned deputized geodetic engineer shall notify the Director/concerned
Regional Director by telegram/fax message not later than the deadline for the filing
of the survey returns that he/she has filed the same through the mail.
Corners and/or location monuments of verified survey returns of mining right areas,
inspite of the nullity, cancellation, rejection or abandonment of the mining rights
over the surveyed area, shall be preserved as reference marks and the geographic
position thereof shall be kept for use in future mineral land surveys, unless otherwise
said survey is found to be erroneous by later approved mineral land surveys.
SECTION 77. Withdrawal of Survey Order - If the Director/concerned Regional
Director finds that the deputized geodetic engineer has violated any of the terms and
conditions of the survey order or the survey service, contract, or has failed to
execute the survey and submit the survey returns within the prescribed period, the
Director/concerned Regional Director shall withdraw the existing authority over the
subject area, forfeit the corresponding bond and shall not issue any new survey order
in favor of the said deputized geodetic engineer without prejudice to any criminal,
professional, or other liabilities arising out from such failure, violation or
misrepresentation.
SECTION 78. Withdrawal of Defective Survey Returns - The deputized geodetic
engineer or his/her duly authorized representative may withdraw documents within
thirty (30) days upon receipt of notice from the Bureau/concerned Regional Office
for correction of errors, discrepancies and/or, deficiencies of the submitted survey
returns. A period of ninety (90) days from the date of withdrawal of the said survey
returns is given to the deputized geodetic engineer or his/her duly authorized
representative to re-submit the same without any extension save for reason of force
majeure. Failure of the deputized geodetic engineer to re-submit the withdrawn
survey returns within the prescribed period shall cause the revocation of the survey
order and confiscation of his surety bond and non-issuance and the rejection of new
survey order over the subject area.
SECTION 79. Field Verification and Approval of Survey Plan - Upon submission of
the corrected survey returns the Director/concerned Regional Director shall cause
the immediate field verification of the subject area. Thereafter, the survey plan shall
be submitted to the Director/concerned Regional Director for approval of the same
within fifteen (15) days from receipt thereof.
SECTION 80. Non-Transferability of Survey Order - Survey order is non-
transferable except in cases of death, physical incapacity of the deputized geodetic
engineer, or any other causes which render it impracticable to execute the survey,
subject to the approval of the Director/concerned Regional Director. Provided,
however, That the execution of the survey shall be completed within the remaining
period covered by the original survey order.CHAPTER XI
Drilling of Areas by the Bureau
SECTION 81. General Provision - In line with the policy of the Government to
hasten the exploration, development and utilization of the mineral resources of the
country, the Bureau may conduct exploration in open areas other than mineral
reservations upon its own initiative or upon request by claimant/contractor/permittee
in areas covered by existing and valid mining claims/contract/permit: Provided, That
whatever expenses that may be incurred thereof shall be taken from the
appropriation of the Bureau or from the requesting party, as the case may be.
SECTION 82. Priority Areas - The Director shall determine whether the area is
included in the priority list of areas and contains critical minerals included in the
mineral development program of the government.
If it is ascertained that the area should be explored, a contract between the
contractor/claimant/permittee and the Director shall be executed to include, among
others, a statement that Bureau shall conduct the necessary geological studies on the
area, and if warranted, undertake diamond drilling, testpitting, trenching or auger
drilling operations thereon.
In case the drilling reveals substantial ore reserves to warrant commercial mining
operations, the contractor/claimant/permittee as well as his/her successor(s) or
assignee(s) shall then take all steps required to secure any mode of mineral
agreement.
SECTION 83. Reimbursement - Upon completion of exploration activities by the
Bureau in open areas other than mineral reservation, it shall render a certified report
on the total expenses incurred thereon. Any interested party who wish to apply for
mineral right shall reimburse to the Bureau the certified amount plus an interest of
12% of the expenses.
SECTION 84. Lease of Drilling Equipment - The Director may lease the drilling
equipment of the Bureau to permittees, lessees, contractors and holders of other
permits desiring to conduct exploration and development work on the area applied
for.
Drilling equipment maybe leased upon application made with the Director, by any
qualified person as defined in these implementing rules and regulations.
SECTION 85. Preferential Right to Lease - In case there are two or more
applications, the Director shall grant the lease agreement to the first applicant who
has satisfactorily complied with all the requirements.
SECTION 86. Terms and Conditions of the Drilling Lease Agreement - The terms
and conditions of the lease agreement are the following:
A. THE LESSEE SHALL HAVE AN APPROVED EXPLORATION
PERMIT;
B. The drilling equipment shall be used exclusively for exploration
purposes in the areas specified in the agreement;C. The drilling equipment shall not be subleased to any person,
partnership or corporation;
D. The lessee shall satisfactorily comply with all the requirements
imposed by the Director;
E. The lease shall be for a minimum period of three (3) months from the
date specified in the lease agreement;
F. The lease agreement maybe renewed by the Director when the
evaluation of the drilling results justifies the continuation of the drilling
program: Provided, That the lessee has not violated any terms and
conditions of the original lease agreement;
G. The Director or his/her duly authorized representative shall see to it
that the drill machine pump and accessories are properly used and
maintained;
H. The Director or his/her duly authorized representative may conduct an
inspection of the drilling operation at any time during the term of the
lease at the expense of the lessee;
I. The lessee shall pay the daily rental plus a surcharge of 100% per day
for failure to return the leased equipment as stipulated in the agreement;
J. The lessee has not violated any terms and conditions of previous lease
agreement; and
K. The violation of any terms and conditions of the lease agreement shall
be a ground for cancellation of the same.
SECTION 87. Rights and Obligations of the Lessee - The following are the rights
and obligations of the lessee:
a. The lessee shall maintain and keep the equipment in good working condition
during the term of the lease until it is returned to the Bureau;
b. The lessee shall replace and/or repair all parts rendered unusable thru breakage,
loss or abnormal wear during the term of the lease. All parts missing at the time the
equipment is returned shall be replaced within one (1) month from the time such
equipment are returned. For this purpose, the lessee shall make the required cash
deposit. If the lessee returns the equipment in bad condition and fails to restore them
into running condition or fails to replace the missing parts or accessories within the
allowable time, the lessor shall use the cash deposit and/or forfeit the bond without
prior notice to the lessee to put the equipment back into running condition or replace
any missing accessories. The lessee SHALL be required to deposit additional cash to
defray the abovementioned expenses if the original cash deposit for the purpose is
insufficient;
c. Transportation of the drilling equipment and all its accessories from the Bureau
and return shall be for the lessee's account;d. The lessee shall submit monthly to the Director all the information, data and
footage obtained thru drilling which shall be treated as confidential. Such
information, however, shall be made available to the public after a period of two (2)
years;
*
e. The lessee shall pay the required monthly rental fee (Annex 11-A );
f. To guarantee the faithful compliance with the terms and conditions of the lease
agreement, and to answer for any loss and/or damage of the equipment during the
term of the lease, the lessee shall file with the Bureau the required surety bond
issued by a company accredited by the Insurance Commission, which may either be
in cash or with a surety satisfactory to the Director;
g. The lessee shall pay in advance an amount corresponding to two (2) months
rentals and per diem including transportation expenses of one (1) driller upon the
signing of the contract of lease agreement. The rentals and per diems for succeeding
months shall be due and payable at the beginning of the first day of every month;
h. Rentals not paid within thirty (30) days after they become due and payable shall
bear a surcharge of five per centum (5%) per month until fully paid. Rentals shall
continue to be charged for returned equipment not in running condition and for
accessories lost or missing until repaired and replaced respectively; and
i. Balance of rentals and per diems paid and/or deposits made after termination of
the lease shall be applied to pending obligations of the lessee with the lessor. Excess
rentals or deposits shall be refunded to the lessee.
SECTION 88. Receipts from Rentals - All rental fees of drilling equipment shall
accrue to the Drilling Fund which shall be used for the purchase of supplies,
materials and spare parts needed in the repair of said drilling equipment subject to
the provisions of Commonwealth Act No. 246, as amended.
Chapter XII
Quarry Operations
SECTION 89. Extraction/Utilization of Quarry and Sand and Gravel Resources -
Quarry and sand and gravel resources maybe extracted/utilized in a privately-owned
lands and/or public lands: Provided, That prior to the granting of quarry and sand
and gravel permits ail applicants shall furnish a copy each of the quarry and sand
and gravel applications to the owner(s) of the private lands and the Offices of
Provincial Governor/City Mayor, Municipal Mayor, Barangay Chairman and
Regional Office concerned and for posting at their respective bulletin boards or other
conspicuous place for a period of fifteen (15) days, AND THIRTY (30) DAYS FOR
LARGE SCALE ONES: Provided, further, that in large scale quarry operations
involving cement raw materials, marble, granite, and sand and gravel, a qualified
person and the Government may enter into a mineral agreement as defined herein.
SECTION 90. Quarry Permit - Quarry permit application maybe filed with and
processed by the Provincial/City Mining Regulatory Board and the corresponding
quarry permit may be granted by the Provincial Governor/City Mayor to a qualified
person for the extraction and utilization of quarry resources covering an area of not
more than 5 hectares for a term of 5 years, renewable for one or more terms but notto exceed 25 years: Provided, That application for renewal shall be filed before the
expiry date of the permit, and the permittee has complied with all the requirements
and shall not have been guilty of any violation of the Act and these implementing
rules and regulations: Provided, further, That no quarry permit shall be issued or
granted on any area covered by a Mineral Agreement or FTAA.
SECTION 91. Commercial Sand and Gravel Permit - Commercial Sand and Gravel
Permit application may be filed with and processed by the Provincial/City Mining
Regulatory Board and the corresponding permit may be granted by the Provincial
Governor/City Mayor to a qualified person for the removal of sand and gravel and
other loose or unconsolidated materials which are used in their natural state without
undergoing processing covering an area of not more than five (5) hectares and in
such quantities as may be specified in the permit. Provided, That only one (1) permit
shall be granted by the concerned Provincial Governor/City Mayor to a person in a
municipality at any one time for a period of one (1) year, renewable for like period
under such terms and conditions as provided herein.
SECTION 92. Industrial Sand and Gravel Permit - Industrial Sand and Gravel
Permit application (MGB Form No. 12-1) maybe filed with and processed by the
Regional Office and the corresponding permit (MGB Form No. 12-2) maybe granted
by the Regional Director to a qualified person for the removal of sand and grave and
other loose or unconsolidated materials that necessitate the use of mechanical
processing covering an area of more than five (5) hectares but not to exceed 20
hectares at any one time for a term of five (5) years, renewable for like periods but
not to exceed a total of twenty-five (25) years. However, for areas covering five (5)
hectares or less, an Industrial Sand and Gravel Permit may be filed at and processed
by the Provincial/City Mining Regulatory Board and the corresponding permit may
be granted by the Provincial/City Mayor to a qualified person.
SECTION 93. Exclusive Sand and Gravel Permit - Exclusive Sand and Gravel
Permit application may be filed with and processed by the Provincial/City Mining
Regulatory Board and the corresponding permit may be granted by the Provincial
Governor/City Mayor to a qualified person to extract/utilize sand and gravel and
other loose or unconsolidated materials from public land for his/her own use
covering an area of not more than one (1) hectare for a non-renewable period not
exceeding sixty (60) days and a maximum volume of 50 cubic meters: Provided,
That there will be no commercial disposition thereof.
SECTION 94. Government Gratuitous Permit - Government Gratuitous Permit
application maybe filed with and processed by the Provincial/City Mining
Regulatory Board and the corresponding permit may be granted by the Provincial
Governor/City Mayor to any government entity/instrumentality in need of quarry,
sand and gravel or loose/unconsolidated materials in the construction of building(s)
and/or infrastructure for public use or other purposes covering an area of not more
than two (2) hectares for a period coterminous with the construction stage of the
project in public/private land(s).
SECTION 95. Private Gratuitous Permit - Private Gratuitous Permit application may
be filed with and processed by the Provincial/City Mining Regulatory Board and the
corresponding permit may be granted by the Provincial Governor/City Mayor to the
land owner applying to extract sand and gravel, quarry, or loose/unconsolidated
materials from his/her land, provided there is adequate proof of ownership and thatthe materials will be for personal use. The permit shall be for a non-renewable
period of sixty (60) days.
SECTION 96. Who May Apply for a Quarry or Sand and Gravel Permit -
a. In case of individual, he/she should be of legal age and a citizen of the
Philippines; or
b. In case of a corporation, cooperative, association or partnership it should be
organized under the laws of the Philippines and duly registered with the government
agency concerned and at least sixty per centum (60%) of the capital of which is
owned and held by citizens of the Philippines. A certified copy of its duly registered
articles of incorporation or partnership shall be submitted in support of the
application.
SECTION 97. Application for Quarry or Sand and Gravel Permit - Application for
quarry or sand and gravel permit shall be filed with the concerned Provincial/City
Mining Regulatory Board or to the Regional Office concerned in case of application
for industrial sand and gravel permit covering more than five (5) hectares using the
prescribed form (MGB Form No. 12-3) upon payment of filing fees: Provided, That
all applications shall be cleared by the concerned Regional Office concerned.
SECTION 98. Provincial/City Mining Regulatory Board - The Provincial/City
Mining Regulatory Board shall, among others, accept, process and evaluate
applications and determine administrative charges and fees for quarry, sand and
gravel, guano, gemstone gathering and small-scale mining permits duly filed with
the Board. It shall be chaired by the Regional Director concerned or his/her duly
authorized representative with the following members:
a. Governor/City Mayor or his/her representative;
b. Small-scale mining representative;
c Large scale mining representative; and
d. DENR-duly accredited ENVIRONMENTAL Non government
organization representative.
The concerned Regional Office shall provide the technical secretariat to
Provincial/City Mining Regulatory Board.
For purposes of these implementing rules and regulations, city refers to an
independent component city as classified under the Local Government Code.
SECTION 99. Documents to Accompany Applications for Quarry and Commercial
and Industrial Sand and Gravel Permits - Applications for quarry and commercial
and industrial sand and gravel permit shall be accomplished by the following
documents:
a. Clearance from the government agencies concerned that may be affected by the
quarry or sand and gravel permit or written permission from the landowner(s) and
surface owner(s) of the area applied for;
b. Survey plan of the area;c. Articles of Incorporation/Partnership & By-Laws, if applicable;
d. Audited Financial Statement for Corporation/Partnership or Income Tax Return
immediately preceding three (3) years for individuals or credit lines;
e. Work Program;
f. Commitment to secure Environmental Compliance Certificate (ECC) prior to the
extraction FOR SMALL QUARRY AND COMMERCIAL SAND AND GRAVEL
PERMITS WHILE LARGE QUARRY AND COMMERCIAL SAND AND
GRAVEL PERMITS AND ALL INDUSTRIAL SAND AND GRAVEL PERMITS
SHALL BE REQUIRED TO SECURE AN ECC;
g. Other documents that may be required by the approving authority.
SECTION 100. Processing and Approval of Application for Quarry or
Commercial/Industrial Sand and Gravel Permit - After the application for a quarry
or commercial/industrial sand and gravel permit shall have been processed and
evaluated and the requirements therefor fully complied with, the Regional Director
or Provincial Governor/City Mayor concerned shall issue the quarry or
commercial/industrial sand and gravel permit on the prescribed form (MGB Form
No. 12-4).
SECTION 101. Conditions and Limitations of Quarry or Commercial/Industrial
Sand and Gravel Permits - Permits for quarry and sand and gravel operations shall
be issued subject, among others, to the following terms and conditions:
a. The permit shall be for the exclusive use of the permit holder and shall not be
transferred or assigned without prior written approval by the concerned Regional
Director/Provincial Governor/City Mayor;
b. The statements made in the application or those made later in support thereof shall
be considered as conditions and essential parts of the permit and any
misrepresentation contained therein shall be a cause for the suspension or revocation
of the permit;
c. No extraction or removal of materials shall be allowed within a distance of one (1)
kilometer from the boundaries of reservoirs established for public water supply,
archaeological and historical sites and of any public or private works or structures,
unless the prior clearance of the agency or owner concerned is obtained. No
extraction or removal of materials shall likewise be allowed in offshore areas within
five hundred (500) meters distance from the coast and two hundred (200) meters
from the mean low tide level along the beach;
d. The removal or taking of materials under the permit shall be confined within the
area specified therein, the boundaries of which, according to the application, are
established on the ground with prominent marks;
e. The permit holder shall assume full responsibility and be liable for damages to
private and/or public property(ies) that may be occasioned by his/her extraction or
operation under the permit;f. Unless otherwise renewed or amended, the permit shall ipso facto terminate after
the whole quantity and kind of materials specified therein have been removed or
taken;
g. The permit holder shall file with the Office of the concerned Regional Director or
Provincial Governor/City Mayor a sworn statement of the quantity of materials
removed or extracted under the permit;
h. The permit shall be made available at all times for the inspection and examination
by the representative(s) of the concerned Regional Director/Provincial
Governor/City Mayor;
i. An ECC shall be secured prior to [the start of] APPLICATION FOR quarry
operations; and
j. The permit may be suspended or revoked at any time by the Secretary, Director or
Provincial Governor or City Mayor, as the case may be, when in his/her opinion,
public interest so requires or upon failure of the permit holder to comply with the
other terms and conditions stated in the permit.
SECTION 102. Surety Bond - To answer for and guarantee payment for whatever
actual damages that may be incurred by the quarry or sand and gravel operations, a
surety bond (Annex 4-A) shall be posted by the applicants except for those applying
for Gratuitous and Exclusive Sand and Gravel Permits.
SECTION 103. Conditions and Limitations of Government Gratuitous Permit - A
government gratuitous permit may be issued under the following conditions:
a. The period of the grant shall be coterminous with the term of the construction
stage of the project but not to exceed one (1) year;
b. The applicant shall submit a project proposal stating where the materials to be
taken shall be used and the estimated volume needed;
c. The government office concerned shall, whenever practicable, use and utilize its
own vehicle(s) and equipment in extracting, hauling and transporting the materials:
Provided, however, That the permit holder may enter into a contract with a private
person/entity for the purpose of hauling and transporting such materials;
d. The materials authorized to be removed shall be strictly for infrastructure project
and in no case shall the same be disposed of commercially, otherwise, persons
responsible thereof shall be liable for prosecution under appropriate laws;
e. The permit holder shall submit to the Regional Director or Mineral District
Officer concerned a monthly report copy furnished the Director and Provincial/City
Treasurer concerned; and
f. The quarry operators shall be managed in a technically and environmentally
responsible manner to achieve a safe, non-polluting and self-sustaining post
disturbance land form.SECTION 104. Records of Removed or Disposed Quarry or Sand and Gravel
Resources - The permit holder shall keep books of accounts wherein there shall be
entered everyday the quantity of quarry or sand and gravel resources removed or
extracted from the area as well as the quantity disposed of or sold during the day,
their selling prices, the names and addresses of the persons or parties to whom the
same were sold or disposed of.
All books of accounts and records required to be kept in the preceding paragraph
shall be opened at all times for the inspection of the representatives of the Regional
Director or the Provincial Governor/City Mayor concerned. The refusal of the permit
holder to allow the authorities concerned to inspect the same without justifiable
reason shall be sufficient ground for the cancellation of the permit.
SECTION 105. Quarry Fee and Taxes to be Paid - All permit holders except for
gratuitous permits under this Chapter shall pay the required quarry fees (Annex 4-A)
to the city/municipal treasurer concerned. Likewise, an excise tax in mineral
products as provided for in Republic Act No. 7729 amending Section 151 (a) of the
National Internal Revenue Code shall be paid upon removal thereof to the
Government thru the concerned agent or representative of the Bureau of Internal
Revenue.
Section 106. Cancellation/Revocation of Quarry or Sand and Gravel Permit - The
quarry or sand and gravel permit may be cancelled or revoked by the Regional
Director or Provincial/City Mayor concerned based on the following grounds:
a. Violation of any of the terms and conditions of the permit;
b. Failure to pay the excise tax for two (2) consecutive years;
c. If quarry operations endangers the life and health of the laborers/miners;
d. If the commodity stipulated in the permit has been exhausted before the expiry
date thereof; and
e. When public welfare, peace and order conditions so require and for environmental
protection or ecological reasons.
SECTION 107. Guano Permit - A guano permit application may be filed with and
processed by the Provincial/City Mining Regulatory Board and the corresponding
permit may be granted by the Provincial Governor/City Mayor to extract and utilize
loose unconsolidated guano and other organic fertilizer deposits in specific caves
and/or confined sites SUCH AS SITES IDENTIFIED AS NOT PART OF THE
INTEGRATED PROTECTED AREAS SYSTEM (IPAS) excluding phosphatic
rocks.
SECTION 108. Kinds of Guano Permit -
a. Gratuitous permit - a permit to extract or remove guano issued to individual for
his/her personal use and or to any government agency in need of the material within
a specified period and quantity; andb. Commercial permit - a permit to extract or remove guano issued to person for sale
or commercial disposition thereof within a specified period and quantity.
SECTION 109. Who May be Issued or Granted a Guano Permit - Permits maybe
issued or granted to applicants who have complied with the requirements provided
herein and who possess the following qualifications:
a. In case of an individual, the applicant shall be of legal age and has established
domicile in the municipality where the area applied for is located; or
b. ln case of a corporation, partnership, cooperative or Association, it should be
organized under the laws of the Philippines majority of its incorporators, partners or
members have established domicile in the municipality where the area applied for is
located, and is duly registered with the government agency concerned at least sixty
per centum (60%) of the capital of which is owned and held by citizens of the
Philippines.
SECTION 110. Application For Guano Permit - Application for guano permit shall
be filed with the Provincial/City Mining Regulatory Board concerned after payment
of filing and processing fees. The application shall be accompanied by the
following:
a. Location map/sketch plan of the caves and/or confined sites;
b. Certification of Barangay Chairman stating that the applicant has established
domicile in the area applied for; and
c. Verification and clearance by the Regional Office and other agencies concerned.
SECTION 111. Quantity of Guano Allowed - A gratuitous permit holder shall be
allowed to extract and remove not more than Two Thousand kilogram (2,000 kg.) of
guano and a commercial permit holder shall be allowed such quantity as may be
specified in the permit.
SECTION 112. Maximum Area - The maximum area which a qualified person may
hold at any one time shall not be more than five (5) hectares.
SECTION 113. Issuance of Guano Permit - Upon processing and evaluation of the
application by the Provincial/City Mining Regulatory Board, the Provincial
Governor/City Mayor shall issue the corresponding permit covering areas within its
jurisdiction for a term of one (1) year or upon the extraction of the quantity specified
in the permit. Provided, That only one guano permit shall be issued for the same
cave or area.
SECTION 114. Specific Conditions Under Which a Guano Permit is Issued - Permit
for the extraction and utilization of guano resources shall be issued subject, among
others, to the following terms and conditions:
a. The guano permit shall be for the exclusive use of the permit holder;
b. Removal or taking of guano shall be confined within the cave or area specified in
the permit, the location of which shall be indicated in a location map;c. Permit holder shall file quarterly with the Provincial Governor/City Mayor a
sworn statement of the quantity of guano removed and the amount of fees paid
therefor;
d. The applicant shall state in his/her application more or less the quantity of guano
available in the cave/area applied for;
e. The permit holder shall immediately stop digging and extracting guano the
moment man-made articles or artifacts are found. He/she shall notify the Director of
the National Museum of such findings, in which case, the digging shall be under the
supervision of the National Museum until said artifacts are recovered;
f. No explosives shall be used in extracting guano; and
g. The holder of the permit shall not violate any terms and conditions of the permit.
SECTION 115. Fee - The quarry fee (Annex 4-a) shall be paid by the permit holder
to the concerned City/Municipal Treasurer.
SECTION 116. Gemstone Gathering Permit - Gemstone gathering permit may be
granted by the Provincial Governor/City Mayor to a qualified person for the
extraction and utilization of loose stones useful as gemstones.
SECTION 117. Who May be Issued a Gemstone Gathering Permit - Permits may be
issued or granted to applicants who possess the following qualifications:
a. In case of an individual, the applicant shall be of legal age and citizen of the
Philippines; or
b. In case of a corporation, partnership or Association, it should be organized under
the laws of the Philippines and duly registered with the Securities and Exchange
Commission, at least sixty per centum (60%) of the capital of which is owned and
held by citizens of the Philippines.
SECTION 118. Application of Gemstone Gathering Permit - Application for
gemstone gathering permit shall be filed with and processed by the concerned
Provincial/City Mining Regulatory Board upon submission of location plan/sketch
map and payment of filing and processing fees to the concerned City/Municipal
Treasurer.
SECTION 119. Processing and Issuance of Permit - Upon processing and evaluation
of the application by the Provincial/City Mining Regulatory Board, the Provincial
Governor/City Mayor concerned shall issue the corresponding gemstone gathering
permit covering areas within their respective jurisdiction.
SECTION 120. Terms and Conditions of the Permit - The permit shall be governed
by the following:
a. Gemstone gathering shall be allowed in rivers and other locations except in areas
which are expressedly prohibited by law;
b. The removal/gathering of gemstone shall be conducted manually without the aid
of any tools or mechanized equipment;c. The permit holder shall assume full responsibility and be liable for damages to
rights or properties that may be occasioned by its gemstone gathering activities
under the permit;
d. Prior to the transport and/or disposition of gemstone gathered/removed from the
allowed area, the permit holder shall pay the Government, through the concerned
agent or representative of Bureau of Internal Revenue the excise tax due thereon, as
provided for under Republic Act 7729 amending Section 151 (a) of the National
Internal Revenue Code;
e. The permit holder shall submit to the Provincial Governor/City Mayor and to the
Regional Director copies of sworn reports stating the quantity of gemstone removed
or gathered by the permittee, the amount of fees paid, the quantity/volume of
gemstone sold or disposed of during the period covered by the report, their selling
prices, the names and addresses of the persons to whom the same were sold, and the
quantity/volume of materials left in stock;
f. The permit shall be for the exclusive use and benefit of the permit holder, his/her
heir(s) and successor(s) in-interest and the same shall not be transferred unless with
the approval of the Provincial Governor/City Mayor.
g. The permit holder shall not violate any of the terms and conditions of the permit.
SECTION 121. Duration of the Permit - The permit shall be for a term not exceeding
one (1) year from the date of issuance renewable for one or more terms: Provided,
That the application for renewal shall be filed before the expiry date of the permit
and the permit holder has complied with the terms and conditions of the original
permit and shall have not been guilty of any violation of the Act and these
implementing rules and regulations.
SECTION 122. Suspension/Revocation of the Permit - The permit may be suspended
or revoked at any time by the Provincial Governor/City Mayor OR THE
REGIONAL DIRECTOR when in his opinion, public interest so requires or for
ecological reasons or upon failure of the permit holder to comply with the terms and
conditions stipulated under the permit or any misrepresentation on the statement
made in the application or those made later in support thereof.
CHAPTER XIII
SMALL SCALE MINING
SECTION 123. General Provisions - Small-scale mining applications shall be filed
with, processed and evaluated by the Provincial/City Mining Regulatory Board
concerned and the corresponding permits to be issued by the Provincial/City Mayor
concerned except small scale mining applications within the mineral reservations
which shall be filed, processed and evaluated by the Bureau and the corresponding
permit to be issued by the Director.
The guidelines and provisions specified in MRD 41 (Annex 13-A*), DAO No. 28
(Annex 13-B*) and MRDB 3 and 3A, (Annexes 6-A & 6-B*) which are the
implementing rules and regulations of P. D. 1899 and the guidelines and provisions
of DAO No. 34 (Annex 13-C*) which are the implementing rules and regulations of
R. A. No. 7076, insofar as they are not inconsistent with the provisions of theseimplementing rules and regulations, shall continue to govern small-scale mining
operations.
CHAPTER XIV
GRANTING OF MINERAL PROCESSING PERMITS
SECTION 124. Mineral Processing Permit - No person shall engage in the
processing of minerals without first securing a mineral processing permit (MGB
Form No. 14-1) from the Secretary or his/her duly authorized representative.
Mineral processing permit shall be for a period of five (5) years renewable for like
periods but not to exceed a total term of twenty-five (25) years.
In the case of mineral ores and minerals produced by the small-scale miners, the
processing thereof as well as licensing of their custom mills, or processing plants
shall, notwithstanding the provisions of Section 123 above, continue to be governed
by the provisions of R. A. No. 7076 and its implementing rules and regulations
under DAO No. 34, Series of 1992 (Annex 13-C*).
In the case of Contractors, holders of sand and gravel industrial permits and quarry
permits, the approved Work Program for the production period is sufficient
requirement for them to process their minerals in lieu of mineral processing permits.
Those who are presently engaged in the said activity shall secure a mineral
processing permit within six (6) months from the effectivity of these implementing
rules and regulations.
SECTION 125. Qualifications - Any qualified persons, with eligibility TO APPLY
FOR A MINERAL AGREEMENT, may apply for and be granted a mineral
processing permit.
SECTION 126. Application - An application (MGB Form No. 14-2) for a mineral
processing permit by a qualified person shall be filed with the concerned Regional
Office upon payment of an application fee (Annex 4-A) and to be accompanied by
the following:
a. Latest Annual Audited Financial Statements and/or bank certification, if any;
b. Feasibility Study including work plans, plant site, mill and plant layout/design,
anti-pollution devices/measures as well as the plant capacity;
c. Articles of Incorporation, partnership, By-Laws and SEC registration papers;
d. Environmental Compliance Certificate;
e. INTERIM IMPORTATION PERMIT/CERTIFICATION FROM EMB ON THE
USE OF CHEMICALS (E.G. CYANIDE, MERCURY) IN COMPLIANCE TO RA
6969.
f. Brief history of company's activities for the last five (5) years, if any;
g. Supply Contract/Agreement with mining rights holders;h. Proof of technical competence, such as but not limited to, its track record in
environmental protection and mineral processing, details of technology to be
employed in the proposed operation; and details of technical personnel to undertake
the operation; and
i. Sworn statement that the applicant shall:
1. Give preference to goods and services produced and offered in the Philippines
of comparative quality. In particular, the applicant shall give preference to
Filipino construction enterprises and use buildings which can be constructed
by using materials and skills available in the Philippines, employ Filipino
subcontractors for road construction and transportation, and purchase
Philippine household equipment, furniture and food;
2. Give preference to Filipinos in all types of employment for which they are
qualified and that the technology shall be transferred to the same; and
3. Not raise any form of financing from domestic source of funds, whether in
Philippine or foreign currency, for conducting its mineral processing except for
payments for dispositions for its equity, foreign investments in local
enterprises which are qualified for repatriation, and local supplier's credits and
such other generally accepted and permissible financial schemes for raising
funds for valid business purposes in case of foreign-owned/controlled
corporation; and
j. Other requirements as the Secretary may require.
SECTION 127. Approval of the Permit - Within five (5) working days from receipt
of application by the Regional Office, it shall initially evaluate and then forward the
same to the Bureau for final review and evaluation by the latter within fifteen (15)
days from receipt thereof of the forwarded documents. Thereafter, the Director shall
indorse the same to the Secretary who in turn shall act within FIFTEEN (15) days
upon receipt thereof.
SECTION 128. Renewal - The application for renewal of a mineral processing
permit shall be filed thirty (30) days before the expiration of the permit. Any renewal
shall be approved by the Secretary upon recommendation of the Director: Provided,
That the applicant has complied with all the terms and conditions of the permit as
well as existing rules and regulations.
A Temporary Permit to Operate (TPO), which shall be valid for thirty (30) days,
shall be issued by the Director while awaiting the approval of the renewal: Provided,
That succeeding TPOs of same duration shall be issued until the renewal is granted.
SECTION 129. Compliance with Health and Environmental Laws - All applicable
laws, rules and regulations governing health, sanitation, pollution control, zoning,
labor and mine safety as well as those for the protection and enhancement of the
environment shall be observed.
SECTION 130. Monitoring and Submission of Reports - The holders of mineral
processing permits shall submit production and activity reports prescribed in
Chapter XXXI of these implementing rules and regulations. The Director/concerned
Regional Director or his/her duly authorized representative may conduct an on-sitevalidation of the reports submitted: Provided, That the permit holders shall be
charged verification and inspection fees thereon.
CHAPTER XV
TRANSPORT OF MINERALS/MINERAL PRODUCTS AND CONFISCATION,
SEIZURE, AND DISPOSITION OF ILLEGALLY-SOURCED
MINERALS/MINERAL PRODUCTS
SECTION 131. Scope - Illegally-sourced minerals/mineral products are those which
are mined, extracted, removed, and/or disposed of without authority or permit under
existing mining laws, rules, and regulations.
SECTION 132. Documents Required in the Transport of Minerals/Mineral Products
- The transport of all minerals/mineral products by permit holders, contractors,
accredited traders, retailers, processors and other mining rights holders must be
accompanied by an Ore Transport Permit (MGB Form No. 15-1) issued by the
Regional Director or his/her duly authorized representative.
In case of mineral ores or minerals being transported from the small-scale mining
areas to the custom mills or processing plants, the Provincial/City Mining
Regulatory Board (PMRB) concerned shall formulate its own policies to govern
such transport of ores produced by small-scale miners.
For ore samples not exceeding two (2) metric tons to be used exclusively for assay
and pilot test purposes, a certification regarding the same to be issued by the
concerned Regional Director or his/her duly authorized representative is required.
SECTION 133. Basis of Arrests and Confiscation - Absence of any of the foregoing
documents shall be considered prima facie evidence of illegal mining and this shall
cause the seizure of the minerals/mineral products and the tools and equipment
including conveyance used in the commission of the offense in favor of the
government pursuant to P.D. No. 1281 subject to further investigation If it is found
that the minerals/mineral products seized have been mined, extracted or removed
without any permit or authority under existing mining laws, rules and regulations,
final confiscation can be effected to be followed by the filing of the complaint for
theft of minerals. The Bureau officers which include the Regional Director, District
Officer and other Bureau personnel duly authorized by the Director shall have
authority to arrest offenders and seize/confiscate illegally-sourced minerals/mineral
products and the tools, equipment and conveyance used in the commission of
offense.
SECTION 134. Execution of Sworn Statements - Immediately after seizure of the
minerals/mineral products together with the tools, conveyance/s and equipment used
in the commission of the offense, the apprehending Bureau officer shall execute
his/her sworn statement/affidavit surrounding the facts of the case in the form hereto
attached as MGB Form No. 15-2. He/she shall also take affidavits or statements of
witnesses, if any, in the form hereto attached as MGB Form No. 15-3.
SECTION 135. Assessment and Issuance of Seizure Receipt - The kind, volume or
quantity of the seized minerals/mineral products shall be determined immediately
and the assessment thereof shall be based on the gross volume or weight without
benefit of deduction for natural defects, after which the corresponding seizurereceipt shall be issued by the signing Bureau officer, duly acknowledged by the
apprehended person/s or party/ies. In case the apprehended person/s or party/ies
refuse to acknowledge, the local government authority may attest as to the veracity
of the seizure receipt.
SECTION 136. Custody of the Seized Minerals/Mineral Products, Tools,
Conveyance, and Equipment - This shall be made in accordance with the following
procedures:
a. In case of apprehension by the Bureau field officer, the mineral products, tools,
equipment and conveyance/s used shall be deposited with the nearest
Regional/District office, as the case may be and wherever it is most convenient, for
safekeeping. If the transfer of the seized products to the aforecited offices is not
immediately feasible, the same shall be placed under the custody of any licensed
mine operator or the nearest local public official such as the Barangay Captain,
Municipal/City Mayor, Provincial Governor or the Philippine National Police
(PNP), at the discretion of the confiscating officer taking into account the safety of
the confiscated items. The apprehending officer is authorized to seek assistance from
licensed mine operators to provide transportation facilities for the transfer of the
confiscated items from the place of apprehension to the place of custody. In any
event, the custody shall be duly acknowledged and received by the official taking
custody thereof: Provided, however, That in the case of seizure/confiscation by the
Bureau the case shall be referred to the Regional/District Office concerned for
further investigation and disposition;
b. In case of apprehension by the PNP, Economic Intelligence and Investigation
Bureau (EIIB), Coast Guard, and other government law enforcement agencies, the
apprehending agency shall notify the nearest Regional Office and turn over the
seized items to the Regional/District Office as the case may be for proper
investigation and disposition; and
c. For confiscated gold and other precious metals, the Regional Office/District
Office as the case may be, shall first determine if they conform with the Bangko
Sentral ng Pilipinas (BSP) specifications or requirements for acceptance. If the
confiscated gold satisfies the minimum weight requirements but it does not conform
with the physical requirements, the said metal shall be delivered by accountable
officer escorted by security officers to the nearest Bureau/Regional Office
Metallurgy Laboratory for processing. In cases, where the weight requirement is not
satisfied, the Chief Cashier/Accountant of the Regional Office/District Office
concerned shall store the confiscated metal in a safe deposit box of the nearest
reputable banking institution duly accredited by the DENR Regional Office. Once
the inventory of metals reaches the minimum BSP weight specifications, the Chief
Cashier/Accountant shall turn over the confiscated gold to the Metallurgy Office.
The latter shall turn over immediately after processing into saleable form the metals
to the Chief Cashier/Accountant. In each turn-over, accountability is transferred
through Memorandum Receipts.
SECTION 137. Filing of Complaint - The Regional Office/District Office, as the
case may be shall file the complaint with the proper court for violation of Sec. 103
of the Act (Theft of Minerals).
The following documents should be attached to the complaint:a. Sworn statement of the apprehending/arresting officer (MGB Form No. 15-2);
b. Affidavits of witnesses, if any (MGB Form No. 15-3);
c. Copy of the seizure receipt; and
d. Photographs showing the minerals/mineral products seized including the tools,
equipment and conveyances used in the commission of the offense.
SECTION 138. Referral of Complaint - Immediately after the complaint is filed, the
District Office shall transmit copy of the complaint and all supporting documents to
the Regional Office for proper handling and disposition, copy furnished the
Department Undersecretary Secretary for Legal Affairs.
SECTION 139. Disposition of Confiscated Minerals/Mineral Products - The
disposition of confiscated minerals/mineral products shall be handled in accordance
with the following procedures:
a. The District Officer/Regional Director, as the case may be, or his/her duly
authorized representative(s) shall expeditiously sell at public auction and/or dispose
in accordance with existing laws and regulations all confiscated minerals/mineral
products except the following:
1. Those subject of judicial proceedings where ownership of the minerals is al
issue until proper authority is obtained for their disposition from the court
where the case is pending;
2. Those earmarked for donation to other government agencies; and
3. Those determined by the Department for its own needs.
b. For confiscated gold and precious metals, there shall be no bidding as the same
shall be sold directly to the BSP. The sale shall be made as follows:
1. If confiscated metals conform with existing BSP specifications, District
Office/Regional Office concerned shall prepare a letter of intent or advice to
sell confiscated precious metals addressed to the nearest BSP Buying Station
Director/Administrator; and
2. The Accountable Officer escorted by Security officers shall finally deliver said
metals together with the letter/advice to the BSP Buying Station and receive
payment therefor.
c. Confiscated minerals/mineral products except gold and other precious metals shall
be disposed of through a Committee on Bids and Awards on Confiscated Mineral
Products (CBACMP) which, in all cases, shall be composed of the Regional
Director/District Officer responsible for or having custody over the confiscated
minerals or his/her duly authorized representative as Chairman and Local
Government and accredited non governmental organization (NGOs) representatives
and COA representative as members.
In cases of confiscated minerals/mineral products that are the subject of court cases,
especially those that easily deteriorate like pumice and clay, representations with the
proper court shall be made for the immediate disposition thereof through public
auction. The proceeds of the sale shall be deposited as the court directs and the sameshall be awarded by the latter based on the final court decision. The procedures in
handling the sale of confiscated minerals/mineral products through public auction
*
are indicated in Annex 15-A .
SECTION 140. Remittance of Proceeds of Sale - The proceeds of sale of confiscated
minerals/mineral products, after deducting all administrative costs related to the
confiscation of the minerals/mineral products and their disposition shall be remitted
by the Chairman of the CBACMP to the Department either in the form of Cashier's
or Manager's check immediately upon receipt of the full payment of the bidded
mineral products.
SECTION 141. Reporting -
a. Individual Cases/Report Confiscation/seizure/impounding shall be reported
immediately by the apprehending officer to the District Office/Regional Office
within twenty-four (24) hours who shall sent a report to the next higher officer. A
detailed report by the apprehending officer must be submitted within three (3) days
from the date of seizure indicating actions taken thereon. If the confiscation/seizure
is made with personnel from the Regional Office, the same procedure shall be
followed by a report of the Regional Director concerned to the Director.
b. Monthly Report
1. A monthly confiscation report shall be submitted by the District
Officer/Regional Director together with the status of the confiscated
minerals/mineral products; and
2. The Director shall consolidate the monthly confiscation reports of all the
Regional Offices and in turn forward the same to Secretary.
c. Quarterly Report
The Director shall submit to the Secretary a quarterly report of confiscated
minerals/mineral products.
CHAPTER XVI
ACCREDITATION OF PROCESSORS, TRADERS, DEALERS AND RETAILERS
IN THE TRADING OF MINERALS/MINERAL PRODUCTS AND BY ‐
PRODUCTS
SECTION 142. General Provisions - No person shall engage in the trading of
minerals/mineral products and by-products either locally or internationally, unless
registered with the Department of Trade and Industry and accredited by the
Department, with a copy of said registration and accreditation submitted to the
Bureau.
The traders, dealers and retailers of minerals/mineral products/by-products who are
not contractors/permit holders/other mining right holders are henceforth required to
be accredited by the Department.
Contractors/permit holders are considered to be registered and accredited for the
purpose of trading minerals/mineral products and by-products during the effectivity
of their permits or mining rights.SECTION 143. Scope - This chapter shall include all minerals and ores including
construction materials such as raw sand, gravel, wash out pebbles and filling
materials, semiprocessed mineral products such as but not limited to rock, concrete
aggregates, unpolished decorative stone (such as marble, granite, or limestone), tiles
and slabs, metallic ore concentrates/tailings, smelter slags, cathodes, ingots, billets,
blooms, unrefined precious metals/bars/bullion and agricultural/industrial lime.
Exempted are finished/manufactured minerals and metal products such as cement,
transit mixed concrete, ceramics, polished decorative stone tiles, refined or alloyed
metal sheets, wires, bars, beams, plates, refined precious metal bars, jewelry or
ornaments and other mineral products in their final form or stage ready for
consumption by end-users.
SECTION 144. Requirements for Accreditation - The following shall be submitted
by the applicants:
a. Duly accomplished application form as prescribed in MGB Form No. 16-1;
b. Copy of the permit/contract of the suppliers/sources of minerals/mineral
products/by-products or copy of Certificate of Accreditation in case the source of
materials is a trader, dealer or retailer;
c. DTI Registration; and
d. Proof of legal source or supply as supported by any of the following documents;
1. Supply contract/agreement with a permit holder/contractor/accredited dealer
producing the specified minerals/mineral products/by-products;
2. Affidavit executed by a permit holder/contractor/accredited dealer to the effect
that he/she is willing or currently selling and will continue to sell or supply the
applicant with the minerals/mineral products/by products specified in the
application;
3. Delivery or Purchase Receipts issued by a permit holder, contractor or
previously accredited dealer/trader; and
4. Ore Transport Permit (OTP) of Bill of Lading which dearly indicates that the
applicant is the consignee of a permittee or a duly accredited
dealer/trader/shipper.
SECTION 145. Procedure for Accreditation - The following procedures shall be
observed on the issuance of the Certificate of Accreditation:
a. Power to issue Certificate of Accreditation - The Regional Director/District
Officer who exercises territorial jurisdiction over applicant's business operation shall
issue the Certificate;
b. Standard Operating Procedure for Processing of Applications;
1. The Regional Office/District Office receives application upon payment of the
required fees;
2. The Regional Office/District Office evaluates application and validates
supporting documents; and
3. The Regional Director/District Officer, within fifteen (15) days, issues
certificates or rejects application based on merits or demerits, respectively;c. The Regional Director/District Officer shall regularly submit lists of accredited
processors, traders, dealers and retailers of minerals/mineral products and by-
products to the Director.
SECTION 146. Fees - Each applicant shall pay an application and filing fee (Annex
4-A) to the concerned Regional Office/District Office.
SECTION 147. Effectivity of the Certificate of Accreditation - The Certificate of
Accreditation shall be effective for a period of two (2) years from its issuance
renewable for like periods.
SECTION 148. Confiscation, Apprehension and Disposition of Seized Mineral
Products - Shipments of minerals/mineral products and by-products by non-
accredited traders and other illegal sources shall be apprehended, confiscated and
disposed of in accordance with the provisions of Chapter XV of these implementing
rules and regulations.
CHAPTER XVII
DEVELOPMENT OF MINING COMMUNITIES, SCIENCES AND MINING
TECHNOLOGY
SECTION 149. Development of Community and Mining Technology and
Geosciences -
a. A Contractor shall assist in the development of its mining community to promote
the general welfare of its inhabitants (Indigenous Cultural Community and Non-
Indigenous Cultural Community) living in the host and neighboring communities;
b. The contractor shall assist in developing mining technology and geoscience as
well as the corresponding national pool of manpower talents;
c. The contractor shall incorporate in the mine feasibility study the planned
expenditures necessary to implement paragraphs (a) and (b) of this section.
SECTION 150. Credited Activities or Expenditures - The following activities or
expenditures shall be considered in enhancing the development of mining and
neighboring communities:
a. Establishment and maintenance of community schools, hospitals, churches and
recreational facilities which will be open to the general public whether or not they
are mine employees;
b. Construction and maintenance of community access roads, bridges, pier and
wharves;
c. Establishment and maintenance of communication, waterworks, sewerage and
electric power systems which are accessible to members of the community;
d. Development and maintenance of community housing projects which are not for
exclusive use of mine employees;
e. Establishment of training facilities for manpower development not for the
exclusive use of mine employees; andf. Establishment of livelihood industries for the dependents of the mine employees
as well as for other members of the community.
In addressing the future mine development, the contractors may involve the
concerned communities, local/national government or concerned private institutions
in the preconstruction and social planning stage.
The following activities or expenditures shall be considered towards the
development of mining, geosciences and processing technology and the
corresponding national pool of manpower talents:
a. Advanced studies conducted in the mine area such as but not limited to
institutional and manpower development and basic and applied researches;
b. Advanced studies related to mining which are conducted by qualified researchers,
as construed in the practices at the Department of Science and Technology, who are
not employees of the mine and which shall be published in referred technical
journals or monographs accessible to the local scientific community, including the
cost of publication;
c. Expenditures for scholars, fellows and trainees on mining, geoscience and
processing technology and related subjects such as community development and
planning, mineral and environmental economics;
d. Expenditures on equipment and capital outlay as assistance for developing
research and educational institutions which serve as a venue for developing mining,
geoscience and processing technology and the corresponding national pool of
manpower talents; and
e. Other activities that the Director may consider upon proper recommendation by
the concerned professional organizations and/or research institutions, where
appropriate.
SECTION 151. Development of Host and Neighboring Communities - The
Contractor shall perform the following:
a. Coordinate with proper authorities in providing development plans for the host
and neighboring communities;
b. Help create self-sustaining income generating activities, such as but not limited to,
reforestation and production of goods and services needed by the mine and the
community. Where traditional self-sustaining income generating activities are
identified to be present within the host and/or neighboring communities, the
contractor shall work with such communities towards the preservation and/or
enhancement of such activities; and
c. Give preference to Filipino citizens, who have established domicile in the host and
neighboring communities, in the hiring of personnel for its mining operations. If
necessary skills and expertise are currently not available, the contractor must
immediately prepare and undertake a training and recruitment program at its
expense.SECTION 152. Development of Mining Technology and Geosciences - The
contractor shall, among others, perform the following:
a. In the course of its operations, produce geological, geophysical, geochemical and
other types of maps and reports that are appropriate in scale and which in format and
substance are consistent with the internationally accepted standards and practices.
Such maps shall be made available to the scientific community in the most
convenient and cost effective forms, subject to the condition that the contractor may
delay release of the said information for a reasonable period of time which shall not
exceed three (3) years;
b. Systematically keep the data generated from the contract/mining area such as
cores, assays and other related information, including economic and financial, and
may make them accessible to students, researchers and other persons responsible for
developing mining, geoscience and processing technology subject to the condition
that the contractor may delay release of data to the science and technology
community within a reasonable period of time which shall not exceed three (3)
years; and
c. Replicates of the data, maps and reports cited in paragraphs (a) and (b) and furnish
the Bureau for archiving and systematic safekeeping which shall be made available
to the science and technology community for conducting research and for
undertaking other activities which contribute to the development of mining,
geoscience and processing technology and the corresponding national pool of
manpower talent: Provided, however, That the release of data, maps and the like
shall be similarly constrained in accordance with paragraphs (a) and (b) above.
SECTION 153. Use of Indigenous Goods, Services and Technologies - To the
maximum extent compatible with efficient mining operations, the contractor shall
give preference to products, services, technologies produced and offered in the
Philippines of comparable quality. In particular, the contractor shall give preference
to Filipino construction enterprises and use building which can be constructed by
using materials and skills available in the Philippines, employ Filipino
subcontractors for road construction, and transportation and purchase of Philippine
household equipment, furniture and food.
SECTION 154. Donations/Transfer of Facilities - The contractor shall within one (1)
year from the abandonment, cancellation or termination of the agreement, remove all
improvements deemed no longer socially usable after consultation with concerned
Local government unit(s)/communitie(s), on the mining premises found on public
land(s). Otherwise, all the social infrastructure and facilities shall be turned over or
donated tax-free to the proper government authorities, national or local, to ensure
that said infrastructure and facilities are continuously maintained and utilized by the
host and neighboring communities.
SECTION 155. Hiring of Foreigners for Technical and Specialized Work During
Mining Operations - A contractor or a mineral processing permit holder will be
allowed to hire foreigner(s) for technical and specialized work during its mining
operations if Filipino citizens with necessary skills and expertise are not available.
The foreigner will be required to seek working permits/visa from the government
agency concerned and the contractor must notify the Director of the specific nature
of the work and the credentials of such foreigner certifying his/her expertise andmust obtain the approval of the Director for such employment: Provided, That in no
case shall each employment exceed five (5) years or the payback period of the
project as stated in the approved original feasibility study, which ever is longer.
SECTION 156. Requirements for Foreigners Employed as Mine Manager, Vice
President for Operations or in an Equivalent Managerial Position In-Charge of the
Mining Operations - Foreigner employed as specified above shall:
a. Present evidence of his/her qualifications and work experience related to his/her
position; or
b. Pass the appropriate government licensure examination of the Philippines; or
c. In special case, may be permitted to work by the Director for a period not
exceeding one (1) year: Provided, however, That if reciprocal privileges are
extended to Filipino nationals in the country of domicile, the Director may grant
waivers or exemptions; and
d. Secure working permits/visa from other agency(ies) concerned.
CHAPTER XVIII
MINE SAFETY AND HEALTH
SECTION 157. Responsibilities of a Contractor/Permittee/Lessee/Permit Holder
and Service Contractor - All contractors, permittees, lessees, permit holders and
service contractors shall strictly comply with all the rules and regulations embodied
under Mines Administrative Order No. MRD 51, Series of 1991, otherwise known as
the "Mine Safety Rules and Regulations."
For new technologies/equipment in mining and milling operations which are not
covered under the provisions of MRD 51, Series of 1991, the Bureau shall come up
with appropriate rules and regulations to govern the same after due consultation with
all parties concerned.
SECTION 158. Accreditation of Service Contractors - No service contractor shall
henceforth be hired by the contractor/permittee/lessee/permit holder to undertake
mining/quarrying operations unless they are duly accredited by the Bureau.
The following are the requirements for accreditation:
a. Proof of financial and technical capabilities to undertake safe mining/quarrying
operations and related activities showing among others, the names and bio-data of
technical men to undertake said activities; and
b. Mine safety track record.
SECTION 159. Submission of Safety and Health Program - The Director shall
require a contractor/permittee/lessee/permit holder/service contractor to submit a
safety and health program covering its area of operation within fifteen (15) days
before the start of every calendar year and thereafter, copy furnished the Regional
Office, with the following terms and conditions:
a. The safety and health program shall include, but not limited to, the following:1. Standard Operating procedures for mining and milling operation;
2. Management and employee training;
3. Good housekeeping;
4. Health control and services;
5. Provisions for personnel protective equipment, etc; and
6. Monitoring and reporting.
7. ENVIRONMENTAL RISK MANAGEMENT INCLUDING A
DISASTER PREPAREDNESS PROGRAM
8. OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT
b. For the entire duration of the contract period, the
contractor/permittee/lessee/permit holder shall be responsible in the monitoring of
the safety and health program of the service contractor: Provided, That the former
shall ensure the compliance of the latter to existing rules and regulations: Provided,
further, That the safety records of the service contractor shall be included in the
safety record of the contractor/permittee/lessee/permit holder.
c. A Service contractor shall be required to assign a safety engineer and/or safety
inspector if the service area requires close supervision where imminent hazards
exist.
SECTION 160. Mine/Quarry Inspection - The Regional Director or his/her duly
authorized representative shall have exclusive jurisdiction over the conduct of safety
inspection of all installations, surface or underground, in mining/quarrying
operations and monitoring of the safety and health program in a manner that will not
impede or obstruct work in progress of a contractor/permittee/lessee/permit holder
and shall submit to the Director a quarterly report on their inspection and/or
monitoring activities: Provided, That the Director reserves the right to undertake
safety audit as may be necessary to assess the effectiveness of the safety and health
program.
SECTION [163]161. Registration of Safety Engineer and Safety Inspector - All
safety engineers and safety inspectors of a mining/quarrying operations shall be duly
registered with the Regional Office and the corresponding permit shall be issued for
this purpose (MGB Form Nos. 18-1, 18-2 and 18-3).
SECTION [164]162. Qualification for Registration as Safety Engineer or Safety
Inspector -
a. For Registration as Safety Engineer -
1. For Permanent Registration
i. A duly registered and currently licensed mining engineer with at least
one (1) year supervisory experience in mining/quarrying operations
and/or mine safety work; or
ii. A duly registered and currently licensed engineer, geologist, or chemist
with at least five (5) years experience in mining/quarrying operations
and/or mine safety work.2. For Temporary Registration - Any duly registered and currently
licensed engineer, geologist, or chemist with at least two (2) years
experience as safety inspector preferably in the employ of the company.
b. For Registration as Safety Inspector -
1. For Permanent Registration -
i. A graduate in any engineering, geology, or chemistry course with at
least one (1) year experience in safety work or two (2) years experience
in mining operations; or
ii. A college undergraduate in any engineering, geology, or chemistry
course with at least two (2) years experience in safety work or three (3)
years experience in mining operations; or
iii. At least high school graduate with four (4) years experience in safety
work or five (5) years experience in mining operations.
2. For Temporary Registration as Safety Inspector -
i. A graduate in any engineering, geology, or chemistry course with one
(1) year experience in mining operation; or
ii. A college graduate in any engineering, geology, or chemistry course
with at least one (1) year experience in safety work or two (2) years
experience in mining operation; or
iii. At least high school graduate with two (2) years experience in safety
work or three (3) years experience in mining operation.
SECTION 163. Permit to be Issued Upon Registration - The following requirements
shall be accomplished before a permit can be issued:
a. Duly filled-up application form, three (3) copies;
b. Certified photocopy of college diploma or high school diploma, or pertinent
credentials as the case maybe, three (3) copies;
c. Certificate of employment (present and previous), three (3) copies, signed under
oath;
d. Latest photograph, 2 in. X 2 in., three (3) copies; and
e. Registration fees in the amount specified under Annex 4-A.
SECTION 164. Duration/Term of Temporary Safety Engineer/Inspector Permit - A
temporary safety engineer/inspector permit is valid for one (1) year from date of
issuance, renewable every year.
SECTION 165. Permit for Electrical/Mechanical Installations - No electrical and/or
mechanical installation shall be undertaken inside a mining/quarrying operation
compound without a permit issued for the purpose by the Regional Director.SECTION 166. Applications and Plans -
a. Application for such installation shall be filed by the contractor/permit holder or
his/her authorized representative with the Regional Office concerned accompanied
by plans and specifications;
b. Plans shall be prepared in accordance with the provisions of Electrical
Engineering Law with respect to electrical installation and of Commonwealth Act
No. 294, as amended by R. A. 5336 (Mechanical Engineering Law) with respect to
mechanical installation and such plans must conform to the rules and regulations
which have been or may be formulated in pursuance of the above mentioned laws;
and
c. Application for alteration and/or addition of any electrical or mechanical
installations shall be filed in the same manner as for a new installation.
SECTION 167. Permits -
a. Authority to install shall be issued only after the plans have been cleared and
certified to conform with the rules and regulations of the aforementioned laws;
b. Upon completion of installation but prior to regular operation, an inspection shall
be conducted by the Regional Director or his/her duly authorized representative;
c. If upon inspection by the engineers of the Regional Office, the installation is
found to be in accordance with the plans and specifications, a written permit good
for a period of one (1) year shall be issued; and
d. Application for renewal of an electrical/mechanical permit shall be filed by the
contractor/permit holder or his/her authorized representative with the Regional
Office at least thirty (30) days before the expiration date of such permit.
SECTION 168. Charges - The applicant shall bear all expenses in the field
inspection including the cost of transportation of the field inspectors from their
official station to the mine/quarry and back. In addition, an inspection fee of One
Thousand Pesos (1,000.00) per man per day is charged to the applicant: Provided,
That the minimum charge shall not be less than Five Thousand (5,000.00) Pesos.
SECTION 169. Power to Issue Orders -
a. As the need arises, the Regional Director shall require the
contractor/permittee/lessee/permit holder and service contractor to remedy any
practice connected with mining or quarrying operations, which is not in accordance
with the provisions of MRD No. 51, Series of 1991; and
b. The same may summarily suspend the mining/quarrying operations, in case of
imminent danger to life or property until the danger is removed, or appropriate
measures are taken by the contractor/permittee/lessee/permit holder and service
contractor.
SECTION 170. Report of Accidents -a. In case of any incident or accident, causing or creating the danger of loss of life or
serious physical injuries, the person in charge of operations shall report the same to
the Regional Office where the operations are situated within twenty-four (24) hours,
copy furnished the Bureau. Failure to report the same without justifiable reason shall
be cause for the imposition of administrative sanctions prescribed under MRD No.
51; and
b. Other Reports. The employer shall furnish the Regional Office and the Bureau the
following:
1. Monthly Employer's Report of Accident or Sickness (MGB Form No. 18-4);
2. Monthly General Accident Report (MGB Form No. 18-5); and
3. Minutes of the Central Safety Committee meetings.
SECTION 171. Who Are Entitled to Possess Explosives - A contractor/permittee/
lessee/permit holder service contractor shall have the right to possess and use
explosives within its contract area as may be necessary for its mining/quarrying
operations upon approval of an application by the Philippine National Police thru
recommendation by the Regional Office and endorsement of the Bureau in
accordance with MRD No. 51, Series of 1991.
SECTION 172. Requirements in the Application to Possess and Purchase/Transfer
Explosives/Blaster Foreman's License for Mining/Quarrying Purposes - No
application for license to possess and purchase explosives (MGB Form No. 18-6)
shall be accepted for filing with the Regional Office unless accompanied by a
processing/application fee in accordance with schedule in Annex 4-A* and
accompanied by four (4) copies of supporting documents prescribed in Annex 18-
A*.
SECTION 173. Field Inspection of Proposed Storage Facilities (Magazines) and
Verification of Blasting Scheme - Immediately after the filing of application for
Purchaser's License, the Regional Director or his/her duly authorized representative
shall authorize the conduct of field inspection of storage facilities to determine
whether the location and specifications of magazines are in accordance with those
prescribed under MRD No. 51, Series of 1991 and to verify the proposed blasting
scheme(s). The applicant shall bear all expenses in the field verification and the cost
of transportation of the field investigators from their Official Station to the
mine/quarry site and return.
SECTION 174. License to Possess Explosives (Purchaser's License) - An
application, after satisfying all the requirements mentioned in these implementing
rules and regulations, shall be endorsed by the Bureau to the Philippine National
Police for approval.
SECTION 175. Applications For Amendment and Renewal of Purchaser's License -
a. Application for amendment of purchaser's license shall be filed in the same
manner as for a new purchaser's license; and
b. Application for renewal of purchaser's license shall be filed by the holder at least
thirty (30) days before the expiration date of such license.SECTION 176. Right of Inspection - The Director reserves the right to inspect the
mine/quarry explosives magazines and audit records of explosive transactions at the
expense of the explosive purchaser's license holder and at specified rates as may be
deemed necessary: Provided, That failure to immediately implement, without
justifiable reasons, the recommendation(s) to ensure the proper safekeeping and
maintenance of explosives and its magazines shall cause for the imposition of
administrative sanctions prescribed under MRD 51, Series of 1991.
SECTION 177. Submission of Reports by Purchaser's License Holders - Holders of
purchaser's licenses shall be required to keep records of daily explosive transactions
and regularly submit to the Director a monthly report of explosive transactions in the
prescribed (MGB Form No. 18-7) explosive form within (15) days after every
calendar month.
SECTION 178. Mine Labor - No person under sixteen (16) years of age shall be
employed in any phase of mining operations and no person under eighteen (18)
years of age shall be employed underground in a mine.
The Bureau shall coordinate with the Department of Labor and Employment in the
determination of hazardous operations, processes and/or activities in mining industry
in relation to the employment of minors.
SECTION 179. Mine Supervision - All mining and quarrying operations that employ
more than fifty (50) workers shall have at least one licensed mining engineer with at
least five years of experience in mining operations, and one registered foreman.
SECTION 180. Coverage of the Magna Carta for Public Health Workers - All
personnel of the Bureau, [and] ITS Regional Offices AND OTHER DEPARTMENT
BUREAUS/OFFICES PARTICULARLY THE ENVIRONMENTAL
MANAGEMENT BUREAU involved in the actual implementation of mines safety,
health and environmental rules and regulations shall be covered and entitled to the
allowances and other benefits under R.A. No. 7305, otherwise known as the "Magna
Carta of the Public Health Workers". As such, automatic funding for this purpose
shall be included in the regular budget of the Bureau/Department.
CHAPTER XIX
ENVIRONMENTAL PROTECTION
SECTION 181. General Provision - Consistent with the basic policy of the State to
assure the availability, sustainability and equitable distribution of the country's
natural resources, the Department adopts the policy that mining activities attendant
to permits, agreements and leases shall be managed in a technically, financially,
socially, culturally and environmentally responsible manner to achieve, generally,
the welfare of the country and, particularly, the sustainable development objectives
and responsibilities as provided for under these implementing rules and regulations.
SECTION 182. Environmental Protection Objectives - The environmental objectives
include the following:
A. MAINTENANCE OF SUSTAINABLE ENVIRONMENTAL CONDITIONS AT
EVERY STAGE OF THE MINING OPERATION.DURING EVERY STAGE OF THE MINING OPERATION AS WELL AS AFTER
THE TERMINATION STAGE THEREOF, ALL OPEN PIT WORK AREAS,
UNDERGROUND WORKPLACE, MINE WASTE AND TAILINGS
IMPOUNDMENT SYSTEM, QUARRY SITES AND OTHER MINING-
DISTURBED LANDFORMS, INCLUDING THOSE DISTURBED DURING
MINERAL EXPLORATION SHALL BE PERIODICALLY REHABILITATED TO
A CONDITION PRESCRIBED IN THE ENVIRONMENTAL COMPLIANCE
CERTIFICATE OR ENVIRONMENTAL MANAGEMENT AND PROTECTION
PLANS.
b. Establishment of A FUNCTIONAL POST-DISTURBANCE land use capability;
MINESITE DECOMMISSIONING AND REHABILITATION SHALL AIM TO
ESTABLISH A LAND USE CAPABILITY THAT IS FUNCTIONAL AND
PROXIMATE TO THE LAND USE PRIOR TO THE DISTURBANCE OF THE
MINE AREA, UNLESS OTHER BENEFICIAL LAND USES ARE
PREDETERMINED AND AGREED IN PARTNERSHIP WITH LOCAL
COMMUNITIES AND LOCAL GOVERNMENT UNITS.
c. Preservation of downstream freshwater quality;
THE QUALITY OF SURFACE AND GROUND WATER EMANATING FROM
THE EXPLORATION OR CONTRACT/LEASE AREA SHALL BE
MAINTAINED AT ACCEPTABLE LEVELS, AS DETERMINED FROM THE
ACTUAL AND/OR POTENTIAL DOWNSTREAM WATER USES.
d. Preservation of sea water quality and natural habitats for marine life; and
e. Preservation of communities (ICCs/non ICCs) with traditional and/or sustainable
management strategies of their natural resources.
SECTION 183. The Environmental Protection and Enhancement Program (EPEP)
and Environmental Work Program (EWP) - Rationale and Coverage -The
submission of an Environmental Protection and Enhancement Program (MGB Form
No. 19-1) shall be required to provide the operational link between the
environmental [management] PROTECTION AND ENHANCEMENT
commitments under these implementing rules and regulations, THE
ENVIRONMENTAL COMPLIANCE CERTIFICATE'S (ECC) UNDER P.D. 1586
and the contractors' plan of mining operation, except exploration work where the
environmental and social concerns shall be addressed through an Environmental
Work Program (MGB Form No. 19-2): PROVIDED, HOWEVER, THAT
SUBMISSION OF THE EPEP SHALL COMPLEMENT AND NOT SUBSTITUTE
FOR THE REQUIREMENT FOR AN ENVIRONMENTAL COMPLIANCE
CERTIFICATE.
The EPEP/EWP shall set out the environmental protection, enhancement and
rehabilitation commitments for the life-of-mine/exploration period and extend to the
completion of rehabilitation of disturbed land in a technically and environmentally
competent manner. The program shall be based on practical options and
demonstrated practice and should include costing, implementation schedules,
SYSTEM OF ENVIRONMENTAL COMPLIANCE GUARANTEES, monitoringand reporting provisions. Where proposed practices are unproven, a research
program prove the impact control and rehabilitation technology shall be required.
SECTION 184. Submission of the EPEP or EWP - The following shall be required to
submit an EPEP or EWP
a. Mineral Agreement or FTAA contractors and other permit holders shall submit,
within thirty (30) calendar days after the issuance and receipt of the ECC, an EPEP
covering all areas to be affected by mining development, utilization and processing
under their contracts. Environmental impact control and rehabilitation activities
proposed during the life-of-mine shall be costed to enable sufficient financial
resources to be allocated to meet the life-of-mine commitments. Such financial
requirements of the EPEP shall be the basis for the lodging of the Mine
Rehabilitation Fund;
b. Existing MPSA or FTAA contractors with ECCs, operating mines and quarries
may submit, within sixty calendar (60) days from the effectivity of these
implementing rules and regulations, an EPEP covering all areas to be affected by
mining development, utilization and processing under its contract and/or tease.
Environmental impact control and rehabilitation activities proposed during the
remaining life-of-mine period shall be costed to enable sufficient financial resources
to be allocated to meet the environmental and rehabilitation commitments. Such
financial requirements of the EPEP shall be the basis for the lodging of the Mine
Rehabilitation Fund; and
c. Permittees shall submit within sixty (60) calendar days prior to undertaking
ground geophysical survey, test pitting, trenching, diamond drilling, shaft sinking,
tunneling and other major earth moving activities, in lieu of an EPEP, an EWP
detailing the environmental impact control and rehabilitation activities proposed
during the exploration period including the cost to enable sufficient financial
resources to be allocated to meet the environmental commitments. A semi-annual
status report on the EWP shall be submitted to the Bureau within fifteen (15) days
after the end of each semester.
SECTION 185. Annual Environmental Protection and Enhancement PROGRAM
(AEPEP) - To effective implement the approved EPEP, an Annual Environmental
Protection and Enhancement [Strategy] PROGRAM (MGB) Form No. 19-3) shall be
submitted within thirty working days (30) prior to the beginning of every calendar
year. Such program shall be based on the approved EPEP and shall be implemented
during the year for which it was submitted and to include, but not limited to
exploration, development, utilization, rehabilitation, regeneration, revegetation and
reforestation of mineralized areas, slope stabilization mined-out areas, waste dumps,
tailings covered areas aquaculture, watershed development and water conservation,
and socioeconomic development.
SECTION 186. Processing and Approval of the EPEP and AEPEP - The contractor
shall submit at least seven (7) legible copies of the document to the Mine
Rehabilitation Fund (MRF) Committee (described in Sections 196 and 197 of these
implementing rules and regulations) thru the Bureau for review. THE
CONTRACTOR SHALL ALSO PROVIDE A COPY EACH TO THE
REPRESENTATIVES OF CONCERNED LOCAL GOVERNMENT UNITS AND
AFFECTED COMMUNITIES AT LEAST THIRTY CALENDAR DAYS (30)PRIOR TO THE INTENDED DATE OF COMMENCEMENT OF MINING
EXPLORATION OR OPERATION.
Upon receipt of the EPEP and/or AEPEP, the Bureau shall, within thirty (30)
working days from receipt thereof, conduct preliminary evaluation on the submitted
document as to its form and substance, require additional requirements and
documentation deemed necessary and consult with individual experts,
REPRESENTATIVES FROM THE LOCAL GOVERNMENT UNIT AND LOCAL
COMMUNITIES CONCERNED AND advisory body(ies) as may be required to
clarify proposals and to discuss adequacy of control and rehabilitation measures.
All preliminary evaluations shall be consolidated and forwarded to the members of
the MRF Committee for further evaluation and approval/disapproval. Both the EPEP
and AEPES shall be deemed automatically approved, if not acted upon within a
period of thirty (30) working days and unless the MRF Committee notifies the
contractors or other permit holders.
Any significant change in the mining plan particularly those on environmental
protection, enhancement and rehabilitation programs which in effect entail a
variance of minus twenty per centum (-20%) of the approved financial resources
shall require a notice of variations to be submitted to the MRF Committee for
approval at least thirty working (30) days before the proposed change would come to
effect and the conduct of an information dissemination directed to the host and
mining communities concerned. Unless the MRF Committee notifies the contractors
or other permit holders within the period of assessment, the variations as submitted
is deemed automatically accepted. THE NOTICE OF VARIATIONS SHALL BE
SUBJECT TO THE SAME PROCEDURES ON PUBLIC NOTICE,
CONSULTATION AND PARTICIPATION AS SET FORTH IN THE PRECEDING
PARAGRAPHS.
SECTION 187. Guidelines on the Preparation of EPEP and AEPEP - Guidelines in
the preparation of the EPEP and the AEPEP is provided for in Annex 19-A which
shall form as integral part of these implementing rules and regulations and is
intended to assist the development of project specific environmental management
practices.
SECTION 188. Organization of an Environmental Protection and Enhancement
Office - All contractors shall incorporate in their mine organization structures a
"Mine Environment Executive Office (MEEO)" which shall set the level of priority
and marshall the resources needed to implement environmental management
programs. The MEEO shall be responsible for addressing the company's
environmental concerns through adequate and sustainable programs.
SECTION 189. Environmental Monitoring and Audit - To ensure and check
performance and compliance of the approved AEPEP, a Multipartite Monitoring
Team to be formed and headed by Regional Office concerned shall conduct quarterly
environmental monitoring of the activities stipulated in the AEPEP and as deemed
necessary at the expense of the contractors/other permit holders. Environmental
monitoring reports shall be submitted by the Regional Offices concerned to the
Bureau. Said reports will be one of the basis for the annual environmental audit to be
conducted by the Bureau and during MRF Committee meetings as discussed in
Section 200 hereof.SECTION 190. Power to Issue Order - The Regional Director in consultation with
the Environmental Management Bureau shall require the
contractor/permittee/lessee/permit holder to remedy any practice connected with
mining or quarrying operations which is not in accordance with anti-pollution laws
and regulations. The Regional Director may summarily suspend mining or quarrying
operations in case of imminent danger to the environment, until the danger is
removed or appropriate measures are taken by the contractor/permittee/lessee/permit
holder.
SECTION 191. Mines Environmental Award - A Mines Environmental Award will be
given to mining company(ies) based on its yearly environmental performance,
accomplishments and merits in close coordination with the Environmental
Management Bureau. A Committee shall be created for this purpose and shall set the
criteria for the award, subject to approval of the Director.
CHAPTER XX
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
SECTION 92. PROCESSING OF THE ENVIRONMENTAL IMPACT STATEMENT
(EIS) AND THE PROJECT DESCRIPTION (PD) - THE ENVIRONMENTAL
MANAGEMENT BUREAU (EMB) AND THE REGIONAL ENVIRONMENTAL
MANAGEMENT AND PROTECTED AREAS SECTOR (EMPAS), AS THE CASE
MAY BE SHALL TAKE PRIMARY RESPONSIBILITY FOR THE
ACCEPTANCE, PROCESSING, and in coordination with the Bureau,
MONITORING AND EVALUATION OF THE ENVIRONMENTAL IMPACT
STATEMENTS (EISs) AND PROJECT DESCRIPTIONS (PDs). THE EMB
SHALL HAVE THE AUTHORITY TO RECOMMEND TO THE SECRETARY
ANY APPROPRIATE ACTION ON PENDING APPLICATIONS FOR AN
ENVIRONMENTAL COMPLIANCE CERTIFICATE (ECC).
SECTION 193. EIA Monitoring and Audit - The ECC issued by the Secretary or
his/her duly authorized representative to a contractor/permit holder shall be the basis
in the preparation of EPEP and AEPES. The EPEP and AEPES shall be subject to
environmental monitoring by the multipartite team described in Section 189 of these
implementing rules and regulations and an annual audit by the Bureau.
SECTION 194. Penalties - Mining projects found operating without ECC or mining
projects found willfully violating and grossly neglecting to abide by the terms and
conditions of the ECC and which causes environmental damage through pollution
shall suffer the penalty PRESCRIBED IN THE PENAL PROVISIONS OF DAO 11,
S. 1992 AND DAO 21, S. 1994 AND PERTINENT ENVIRONMENTAL LAWS.
CHAPTER XXI
REHABILITATION
SECTION 195. Mine Rehabilitation Fund - A Mine Rehabilitation Fund (MRF) shall
be established for each operating contractor as a reasonable environmental deposit to
ensure satisfactory compliance with the commitments/strategies of the
EPEP/AEPEP and availability of funds for the performance of the EPEP/AEPEP
during specific project phase. The MRF shall be deposited as Trust Fund in a
government depository bank and shall be used for physical and social rehabilitationof areas and communities affected by mining activities and for research on the
social, technical and preventive aspects of rehabilitation.
The MRF shall be in two forms:
a. Monitoring Trust Fund. This fund shall be initiated by the contractor/permit holder
and deposited in a mutually acceptable government depository bank for the
exclusive use in the monitoring program approved by the MRF Committee. The
program of activities shall be embodied in the EPEP/AEPEP as earlier discussed in
Chapter XIX, to be submitted to the MRF Committee thru the Bureau, for
consideration and approval.
The Trust Fund shall be in cash and in an amount to be determined by the MRF
Committee which shall not be less than the amount of Fifty Thousand pesos
(50,000.00) to cover maintenance and other operating budget for the transportation
and travel expenses, cost of laboratory analysis, cost of supplies and materials, cost
of communication services and other reasonable expenses incurred by the
monitoring team. The contractor/permit holder shall notify the Chairman or the Co-
Chairman of its compliance with the deposit requirement attaching a certification
from the bank.
Authorization for the disbursement of said funds shall only be given by the
designated representative of both the MRF Committee and the contractor/permit
holder. Replenishment of this amount shall be done monthly to correspond to the
expenses incurred by the monitoring team for the month. This amount shall be the
subject of review and may be increased as deemed necessary by the MRF
Committee based on the expenses incurred in research and monitoring.
b. Rehabilitation Cash Fund. The contractor/permit holder shall set up a cash fund
for a designated amount to ensure compliance with the approved rehabilitation
activities and schedule for specific mining project phase including research
programs as defined in the EPEP/AEPES. The cash fund shall be deposited as Trust
Fund in a mutually agreed government depository bank for an amount equivalent to
ten per centum (10%) of the total amount needed to implement the EPEP or Five
Million Pesos (5,000,000.00) annually, whichever is lower: Provided, however, That
said amount shall be deposited in four (4) equal quarterly deposit within fifteen (15)
calendar days from the beginning of each quarter.
For the succeeding years, until this Trust Fund is finally terminated and abolished,
the aforesaid amounts shall continue to be deposited as Trust Fund as earlier
described. Any interests or earnings of the fund shall be made part thereof to
comprise and satisfy the total amount required annually. The contractor/permit
holder shall notify the Chairman or the Co-Chairman of its compliance with the
deposit requirement attaching a certification from the bank.
The request for withdrawal and disbursement of said amounts by the
contractor/permit holder shall be based on its EPEP/AEPES to be submitted to the
MRF Committee thru the Bureau for consideration and approval.
SECTION 196. The Mine Rehabilitation Fund Committee - There shall be a Mine
Rehabilitation Fund (MRF) Committee to be created and which shall have the
following duties and liabilities:a. Manage, operate, monitor and look after the safety of the MRF that shall be
established and deposited in a government depository bank in accordance with the
provisions of these implementing rules and regulations;
b. Resolve issue involving mine decommissioning and rehabilitation that will be
brought before it;
c. Issue decisions on complaints/questions involving the implementation of the mine
rehabilitation program;
d. Hire credible experts to do independent studies and research regarding the
environmental, engineering and socio-cultural impacts of the project in order to
assist the MRF Committee in making judicious decisions.
e. Designate the composition and deputize a Multipartite Monitoring Team to serve
as the monitoring arm of the MRF Committee with the concerned Bureau/Regional
Office taking the lead role;
f. In the maintenance of records and reporting requirements, ensure that the funds
are kept separate and distinct from all other MRF's or property belonging to or in
custody of the MRF Committee and shall maintain independent and specific book of
records for all transactions of the fund per contractor/permit holder; and
g. In the absence of fraud, bad faith or gross negligence on the part of the MRF
Committee or any person acting on its behalf, the MRF Committee shall not be
liable for any loss or impairment of the fund arising out or in connection with any
act done or performed or caused to be done or performed by the Committee pursuant
to the provisions of these implementing rules and regulations.
SECTION 197. Composition of the MRF Committee - The Mine Rehabilitation Fund
Committee shall be composed of the following:
a. MGB Director as Chairman;
b. Environmental Management Bureau (EMB) Director as Co-Chairman;
c. Regional Director concerned as Member;
d. Representative of the Community from mining contract area as
member; and
e. Representative of the Contractor/permit holder as member.
In case the Director and/or the EMB Director will not attend any meetings or
functions of the MRF Committee, he/she shall designate or appoint a representative
duly authorized in writing with full power and authority to act in his/her behalf.
On or before the scheduled regular meetings of the Committee, the multipartite
monitoring team shall submit to the Committee a quarterly report on the status
and/or result of its monitoring activities.
SECTION 198. Meetings of the MRF Committee - The Committee shall have a
regular meeting once every quarter. Unless otherwise modified by the Chairman or,
in case of inability of the Chairman, by the Co-Chairman, the regular meeting shall
be held on the second Mondays of March, June, September and December. Noticesof meeting stating the date, time, place and the agenda shall be sent by the Chairman
or Co-Chairman to all members at least ten (10) days before the intended date.
Any member of the MRF Committee may call a special meeting of the Committee
as they may deem necessary: Provided, That notices of the meeting stating the date,
time, place and the agenda shall be sent by the Chairman or Co-Chairman to all
members at least fifteen (15) days before the intended date.
In all meetings, the presence of at least four (4) members shall constitute a quorum
to conduct business. The meetings shall be presided by the Chairman or in his
absence, by the Co-Chairman. In the absence of the Chairman or the Co-Chairman,
the meetings shall be presided by either one of their representatives. Unless
otherwise provided herein, a majority vote of the members present in the meeting
shall be required to give effect to any resolutions or decisions of the Committee. The
officer presiding the meeting shall not vote in any matter brought before the MRF
Committee except in case of a tie.
SECTION 199. Disbursement from the Trust Fund - Withdrawal from the Trust Fund
shall be made by the contractor/permit holder only with the written instruction to the
bank issued by the MRF Committee authorizing the contractor/permit holder to
withdraw the amount from the Trust Fund. The amount to be withdrawn shall be in
accordance with the EPEP/AEPES approved by the MRF Committee.
Anyone of the following is authorized to issue the instruction to the bank in behalf
of the MRF Committee:
a. The Chairman;
b. The Co-Chairman;
c. The designated representative of (a) and (b).
In event that anyone of the above mentioned named person shall fail to issue the
instruction to the bank after the lapse of thirty (30) days from the time the written
request for instruction is received by anyone of the above named persons, the
contractor/permit holder shall have the authority to sign the instruction in behalf of
the MRF Committee and to withdraw the amount in accordance with the approved
EPEP/AEPEP.
SECTION 200. Final Mine Rehabilitation Plan/Decommissioning - Five (5) years
before the final decommissioning of the mineral area, contractors/permit holders are
required to formally inform the MRF Committee of its final mine rehabilitation plan
and/or decommissioning including its financial requirements. The plan is subject to
evaluation and approval of the MRF Committee. The MRF Committee may call on
experts or consultants to assist in resolving questions.
SECTION 201. Suspension/Cancellation of Contracts - Failure of the
contractor/permit holder to post a mine rehabilitation fund in the form of a trust fund
is sufficient ground to cancel or suspend the operation of the areas under contracts.
CHAPTER XXII
MINE WASTE AND TAILINGS FEESSECTION 202. Collection of Fees and Objectives - Mine waste and tailings fees
shall be collected semi-annually from each operating mining contractor/lessee
permit holder based on the amounts of mine waste and mill tailings it generated for
the said period. The amount of fees collected shall accrue to a reserve fund and shall
be deposited in a government depository bank to be used for payment of
compensation for damages caused by any mining operations, the direct cause of
which are mine waste and tailings. Said fund shall also be utilized for research
projects approved by the Evaluation Committee which are deemed necessary for the
implementation of these implementing rules and regulations.
SECTION 203. Organization and Fund Administration - For the purpose of
administering the reserve fund, Inter-Agency Evaluation Committee shall be created
to be composed of the following:
a. Director of Mines and Geosciences Bureau (MGB) or his/her duly authorized
representative (MGB) as Chairman;
b. Director of Environmental Management Bureau (EMB) or his/her duly authorized
representative as Vice-Chairman;
c. Director of Lands Management Bureau (LMB) or his/her duly authorized
representative as member;
d. Director of Forest Management Bureau (FMB) or his/her duly authorized
representative as member;
e. Director of Bureau of Soils and Water Management (BSWM) or his/her duly
authorized representative as member;
f. Director of Bureau of Plant Industry (BPI) or his/her duly authorized
representative as member;
g. Director of Bureau of Fisheries and Aquatic Resources (BFAR) or his/her duly
authorized representative as member;
h. Administrator of the National Irrigation Administration (NIA) or his/her duly
authorized representative as member; and
i. Assistant Director of Mines and Geosciences Bureau as Executive Committee
Coordinator
SECTION 204. Inter-Agency Evaluation Committee Administrative Fund - The
Director shall ensure that adequate budget shall be allocated every year from its
regular appropriation to implement the "Mine Waste and Tailings Fees" provisions
of these implementing rules and regulations. Funds to be allocated for the Inter-
Agency Committee shall include sufficient maintenance and operating budget for
actual field and travel expenses needed during mine site inspections, cost of in-house
and external trainings, monthly honoraria for members of the Committee, cost of
supplies and materials, cost of communication services and adequate capital outlay
for the purchase of required photocopying machines, computers, microfiche
machines, and other support equipment.SECTION 205. Duties and Responsibilities of the Evaluation Committee - The
Evaluation Committee, which shall hold monthly meetings or special meetings when
deemed necessary, shall have the following duties and responsibilities:
a. Evaluates and decides on all applications for compensation for damages and
awards compensations therefor;
b. Implements duly approved guidelines, rules, and regulations;
c. Prescribes documentary requirements for applications for compensation for
damages;
d. Formulates policy recommendations to strengthen the provisions of these
implementing rules and regulations for consideration of the Secretary;
e. Appoints and/or designates members of the Technical Working Group and
Regional Investigation and Assessment Teams for the effective implementation of
these implementing rules and regulations and exercise general supervision over
them;
f. Provides appropriate funds for the development and implementation of research
and other special projects which it deems necessary in promoting the objectives of
these implementing rules and regulations;
g. Recommends to the Secretary the granting of allowances to officials and
personnel performing functions and duties relative to the effective implementation of
these implementing rules and regulations; and,
h. Performs other functions as may be assigned by the Secretary.
SECTION 206. Technical Working Group and Regional Investigation and
Assessment Teams - To assist the Evaluation Committee, there shall be a Technical
Working Group (TWG) to be created by the Bureau. The Regional investigation and
Assessment Teams (RIAT), which shall be composed of representatives from the
Regional Offices and other member agencies when their services are deemed
needed, shall also be created. The RIAT shall be headed by the Regional Director.
The functions of the TWG are as follows:
a. Receives, processes, evaluates, and conducts preliminary investigations, if
necessary, of claims for damages and submit appropriate recommendations to the
Committee;
b. Develops, packages, and recommends research and other special projects;
c. Prepares costings for the rehabilitation of damaged commercial, agricultural,
industrial and residential lands;
d. Determines/estimates the cost of rehabilitating damaged industrial, commercial,
residential, and agricultural lands caused primarily by mine waste and tailings;
e. Acts as secretariat to the Committee;f. Coordinates and monitors the activities of the Regional Investigation and
Assessment Teams, and other personnel involved in the implementation of these
implementing rules and regulations;
g. Verifies the amounts of mine waste and mill tailings generated by mining
companies;
h. Computes and collects the mine waste and tailings fees to be paid by mining
companies;
i. Drafts guidelines, rules and regulations, resolutions and other documents in
connection with the implementation of these implementing rules and regulations;
j. Assists in the investigation and assessment of claims for damages and submits
appropriate recommendations to the Committee;
k. Handles administrative functions specially on finance and budget; and
l. Performs other functions as may be assigned by the Committee.
The functions of the RIAT are as follows:
a. Provides advice to interested parties on matters relating to the implementation of
these implementing rules and regulations;
b. Provides applications and other related forms to prospective claimants for
damages;
c. Receives applications for compensation for damages under these implementing
rules and regulations;
d. Conducts field investigations and assessments of claims for damages (MGB Form
No. 22-1) and submits reports to the Committee, thru the TWG; and
e. Performs other functions that may be assigned by the Committee Chairman.
SECTION 207. Mine Waste and Tailings Fees (MWTF) - Basic fees shall be
0.05/MT of mine waste produced and 0.10/MT of mill tailings generated. The
Secretary is authorized to increase the said fees when public interest so requires,
upon the recommendation of the Director. Mine waste and tailings utilized for the
following are exempted from payment of fees:
a. Filling materials for underground mine openings;
b. Filling materials for surface mine openings: Provided, That such materials shall
not affect natural drainage systems as may be determined by the Committee or its
duly authorized representative;
c. Filling materials for engineered tailings dams, roads, and housing areas: Provided,
That such areas shall not affect natural drainage systems as may be so determined by
the Committee or his/her duly authorized representative;
d. Concreting and manufacture of concrete products; and,e. Mine waste impounded for future use: Provided, however, That a two-year work
program on the utilization of the said materials shall be submitted together with the
semi annual report: Provided, further, That said materials shall be utilized for its
beneficial use within a period of two (2) years. Mine waste, which are not utilized
within the two-year period, shall be charged the corresponding fee of 0.05/MT. Non-
submission of the work program shall mean disqualification from exemption from
payment of fees.
SECTION 208. Payment of Mine Waste and Tailings Fees Due - Mine waste and
tailings fees (MWTF) shall be payable to the Bureau within forty-five (45) calendar
days after the end of each semester. They shall be based on the submitted semi
annual report under oath (MGB Form No. 22-2) by each operating mining
contractor/lessee/permit holder stating among others the following:
a. The amounts of mine waste and tailings produced, stored/impounded or the
amounts of materials that were exempted from payment of fees; and
b. The manner for which these materials were utilized.
Mine Contractors/permit holder with no mine waste nor mill tailings generated shall
likewise submit sworn semiannual reports stating that for the said period no such
materials were generated from their operation.
SECTION 209. Application for Compensation for Damages - Compensable damages
are those damages caused by mine waste and tailings incurred on lives and personal
safety; lands, agricultural crops and forest products, marine life and aquatic
resources, cultural and human resources; and infrastructure and the revegetation and
rehabilitation of silted farm lands and other areas devoted to agriculture and fishing
areas.
The following are qualified to apply for compensation in accordance with damages
incurred:
a. Any individual whose lives and personal safety incurred damages;
b. Any private owners of damaged infrastructures, forest products, marine, aquatic
and inland resources;
c. Any applicant or successor-in-interest for damages to private lands who holds title
or any evidence of ownership;
d. Any applicant or successor-in-interest for damages to alienable and disposable
lands; and
e. Any agricultural lessors, lessees and share tenants for the damages to crops.
Application for compensation for damages under these implementing rules and
regulations shall be filed in a prescribed application forms (MGB Form No. 22-3)
with the Regional Investigation and Assessment Teams within thirty (30) calendar
days from the occurrence of the damage.
Applications should be supported by the following documents:a. Proof of ownership such as tax declaration, perfected land titles, homestead and
free patent. It should be understood, however, that tax declaration shall be honored
as proof of ownership only for the purposes of compensation under these
implementing rules and regulations;
b. Receipt of expenditures for improvements made in the affected property/ies; and
c. Other requirements that may be required by the Committee.
SECTION 210. Evaluation and Compensation of Claims for Damages - The
following guidelines shall apply in the evaluation of claims for damages under these
implementing rules and regulations:
a. Amounts paid as compensation for claims for damages under these implementing
rules and regulations shall be drawn from the mine waste and tailings fees collected
from a contractor(s)/permit holder(s) or contractors, as may be determined by the
Committee: Provided, That in case the assessed amount of damage exceeds the
MWTF paid for, the concerned contractor(s) shall be duty bound to pay for the
remaining balance;
b. Damages to lives and personal safety shall be compensated at an amount as
provided for under pertinent laws;
c. Damages caused to agricultural land which render such lands useless for the
traditional purpose for which it was intended, may be compensated at an amount
equivalent to either one of the following:
1. The fair market value of the lands as per tax declaration: Provided, however,
That a quitclaim/waiver to any future claims for compensation for damages
shall be executed by the claimant/owner before payment which shall be valid
only for the duration of the disturbance equivalent to five (5) years; or
2. The cost of rehabilitation of the land;
d. Damages to agricultural lands resulting in partial loss of productivity may be
compensated at an amount equivalent to the costs of rehabilitation;
e. Damages to industrial and residential lands may be compensated at an amount
equivalent to the costs of rehabilitation;
f. Damages resulting in total or partial loss of agricultural crops, forest products,
and/or inland aquatic resources may be compensated at an amount equivalent to the
loss of projected net income therefrom;
g. Damages to infrastructures may be compensated at an amount equivalent to the
costs of rehabilitation to be determined by the Committee;
h. The amount of compensation for damages shall be based on the amount claimed
or the amount assessed, whichever is lower;
i. In case of private leased lands, compensation under these implementing rules and
regulations shall be paid in accordance with the sharing agreement between theprivate landowner and the lessee/s. In the absence of such an agreement,
compensations shall be divided on the following scheme:
1. Seventy-five percent (75%) for tenants and twenty-five percent (25%) for
landowners for rice and corn; and
2. Fifty percent (50%) for tenants and fifty percent (50%) for landowners for
crops other than rice and corn.
j. Damages compensated by the operating mining company/ies shall no longer be
considered compensable under these implementing rules and regulations: Provided,
That written approval has been secured from the Evaluation Committee and such
payment shall be credited to the concerned contractor for the next paying period.
Waiver signed as a condition of payment for such compensation by mining
contractors shall also be considered as a waiver under these implementing rules and
regulations; and
k. The decision of the Evaluation Committee shall be final and executory unless
appealed to the Secretary within thirty (30) days from receipt of the decision.
SECTION 211. Penalty - Non-submission of semiannual reports shall mean non-
availment of the exemption from payment of mine waste and tailings fees and a
penalty of 5,000.00. Any mining contractors/permit holders, which are found to have
discharged their generated tailings in natural drainage systems, shall be subject to
suspension of the contract/permit.
Failure to comply with payments of the above fees shall mean a 10% surcharge on
the principal amount for every month of delay.
Mine waste and tailings generated, which were previously requested for exemption
from payment of fees but were denied based on the verification report, shall transmit
payments to the Bureau within ninety (90) calendar days upon receipt of notice.
Failure to comply on the said provision shall mean 10% surcharge on the principal
amount for every month of delay.
CHAPTER XXIII
SURFACE RIGHTS
SECTION 212. Easement Rights - when mining areas are so situated that for
purposes of more convenient operations it is necessary to build, construct or install
on the mining areas or lands owned, occupied or leased by other persons, such
infrastructures as roads, railroads, mills, waste dump sites, tailings ponds,
warehouses, staging or storage areas and port facilities, tramways, runways, airports,
electric transmission, telephone or telegraph lines, dams and their normal flood and
catchment areas, sites for waterwells, ditches, canals, new river beds, pipelines,
flumes, cuts, shafts, tunnels or mills, the contractor, upon payment of just
compensation, shall be entitled to enter and occupy said mining areas or lands.
As to the payment of just compensation mentioned in the preceding paragraph the
amount thereof shall be first agreed upon by the parties. In case of disagreement the
matter shall be brought before the Panel of Arbitrators.SECTION 213. Entry Into Lands - The holder(s) of mining right(s) shall not be
prevented from entry into their contract/mining area(s) for the purpose of mineral
exploration, development, and utilization: Provided, however, That written
notification(s) at their registered addresses were sent to and duly received by the
surface owner(s) of the land(s), occupant(s) and concessionaire(s) thereof.
If the surface owner(s) of the land, occupant(s) or concessionaire(s) thereof cannot
be found, the permittee, contractor or concessionaire shall notify the concerned
Regional Director, copy furnished the local officials concerned in case of private
land or in case of concessionaires, the government agency concerned, attaching
thereto a copy of the written notification and a written declaration under oath by the
holders of mining rights that he had exerted effort to search such surface
owner(s)/occupant(s)/concessionaire(s). Such notice(s) to the Regional Director
shall be deemed notice(s) to the surface owner(s) and concessionaire(s).
In cases where the surface owner(s) of the land(s), occupant(s) or concessionaire(s)
thereof refuse(s) to allow the permittee/contractor/permit holder entry into the
land(s) despite its/their receipt(s) of the written notification(s) or refuse(s) to receive
said written notification(s), the permittee/contractor/permit holder shall bring the
matter before the Panel of Arbitrators for proper disposition.
SECTION 214. Posting of a Bond - In all cases mentioned in Section 213 above, the
permittee, permit holder or contractor shall post a cash or surety bond from an
accredited surety with the Regional Office concerned. The amount of the bond shall
be agreed upon by the parties. In case of disagreement, it shall be determined and
approved by the Regional Director in areas outside government reservations, and the
Director in areas within government reservations, based on the (1) type of the land
and the (2) value of the trees, plants and other existing improvements thereto.
SECTION 215. Compensation of the Surface Owner and Occupant - Any damage
done to the property of the surface owner, occupant, or concessionaire as a
consequence of the mining operations shall be properly and justly compensated.
Such compensation shall be based on the agreement entered into between the holder
of mining rights and the surface owner, occupant or concessionaire.
In case of disagreement or in the absence of an agreement, the matter shall be
brought before the Panel of Arbitrators.
SECTION 216. Voluntary Agreement - A voluntary agreement between a surface
owner, occupant and concessionaire permitting holders of mining rights to enter into
and use its land for mining purposes shall be registered with the concerned Regional
Office. The said agreement shall be binding upon the parties, their heirs, successors
and assigns.
CHAPTER XXIV
CONFLICTS/ADVERSE CLAIMS/OPPOSITIONS
SECTION 217. Creation of Panel of Arbitrators - There shall be a Panel of
Arbitrators in the Legal Staff of the Regional Office composed of three (3) members,
two (2) of whom must be members of the Philippine Bar in good standing and one
(1) a licensed mining engineer or a professional in a related field all duly designatedby the Secretary as recommended by the Director. Those designated as members of
the Panel shall serve as such in addition to their work in the Department without
additional compensation. The Regional Office shall provide administrative support
and structure to the Panel of Arbitrators.
The Panel of Arbitrators shall promulgate its own rules and regulations governing
the litigation and disposition of cases.
SECTION 218. Jurisdiction of Panel of Arbitrators - The Panel of Arbitrators shall
have exclusive and original jurisdiction to hear and decide on the following:
a) Disputes involving rights to mining areas;
b) Disputes involving mineral agreements or permits;
c) Disputes involving surface owners, occupants, and claimholders/concessionaires;
and
d) Disputes pending before the Regional Office and the Department at the date of the
effectivity of the Act.
SECTION 219. Filing of Adverse Claims/Conflicts/Oppositions - Notwithstanding
the provisions of Sections 28, 43 and 57 above, any adverse claim, protest or
opposition specified in said Sections may also be filed directly with the Panel of
Arbitrators within the concerned periods for filing such claim, protest or opposition
as specified in said Sections.
SECTION 220. Substantial Requirements for Adverse Claims, Protests and
Oppositions - No adverse claim, protest or any other kind of opposition involving
mining rights shall be accepted for filing unless verified and accompanied by the
prescribed docket fee and proof of services to the respondent(s), either personally or
by registered mail.
Likewise, no adverse claims, protest or opposition shall be entertained unless it
contains the names and addresses of the adverse party, protestant, oppositor and the
respondent and their respective counsels, if any; a detailed statement of the facts
relied upon; the grounds for adverse claim, protest or opposition; and an exhaustive
discussion of the issues and arguments raised; together with all supporting plans,
documents, data and other documentary evidences and affidavits of all witnesses.
SECTION 221. Due Course - If the Panel of Arbitrators finds that the adverse claim,
protest or opposition contains a cause of action and is sufficient in form and
substance, it shall give due course thereto by requiring the respondent to answer
within a period which shall be fixed by the Panel: Provided, however, That said
period shall not be less than five (5) or more than fifteen (15) days from receipt of
the summons.
SECTION 222. Answer - Such answer shall likewise contain a detailed statement of
the facts relied upon by the respondent, an exhaustive rebuttal or refutation of the
issues and arguments raised in the adverse claim, protest, or opposition, and all the
affirmative defenses that he/she may like to raise and may be accompanied by all
supporting documentary evidence and affidavits of all witnesses.In the answer, any counter-adverse claim, counter-protest, or counter-opposition, if
any, must be incorporated otherwise, it shall be barred: Provided, That it must
comply with all the formal requirements of an adverse claim, protest or opposition.
The adverse claimant, protestant or oppositor shall have fifteen (15) days from
receipt of the counter-adverse claim, counter-protest or counter-opposition within
which to answer the same. Failure to file the answer shall not prevent the filing of a
counter-adverse claim, counter-protest, or counter-opposition.
SECTION 223. Preliminary Conference/Compromise Agreement - Upon receipt of
the answer to the complaint/protest and/or answer to the counter-adverse claim,
counter protest, or counter-opposition, the issues are considered joined.
The Panel shall summon the parties to a conference for the purpose of amicably
settling the case upon a fair compromise or determining the real parties in interest,
defining and simplifying the issues in the case, entering into admissions and/or
stipulation of facts, and threshing out all other preliminary matters.
The summons shall specify the date, time and place of the preliminary conference.
Should the parties arrive at any agreement as to the whole or any part of the dispute,
the same shall be reduced to writing and signed by the parties and their respective
counsels, if any, before the Panel. The settlement shall be approved by the Panel
after being satisfied that it was voluntarily entered into by the parties and after
having explained to them the terms and consequences thereof.
A compromise agreement entered into by the parties not in the presence of the Panel
before whom the case is pending shall be approved if, after confronting the parties,
particularly the complainants, it is satisfied that they understand the terms and
conditions of the settlement and that it was entered into freely and voluntarily by
them and the agreement is not contrary to law, morals, public order and public
policy.
A compromise agreement duly entered into in accordance with this Section shall be
final and binding upon the parties and the Order approving it shall have the effect of
a judgment rendered by the Panel in the final disposition of the case.
SECTION 224. Hearing - Should the parties fail to agree upon an amicable
settlement, either in whole or in part, during the conference, the Panel shall issue an
Order requiring the parties to attend the hearing, as scheduled in the aforesaid Order.
Such hearing shall be conducted as much as possible in one sitting or in a number of
successive sessions which, to the greatest extent possible, shall be conducted and
completed within fifteen (15) days.
SECTION 225. Period to Decide the Case - The Panel shall render its decision
within thirty (30) working days after the submission of the case by the parties for
decision.
SECTION 226. Execution and Finality of Decision - The decision of the Panel of
Arbitrators shall become final and executory after the lapse of fifteen (15) days from
the receipt of the notice of decision by the aggrieved party, unless the latter appeals
to the Mines Adjudication Board within the same period, by filing a notice of appealwith the Panel of Arbitrators and paying the prescribed appeal fee (Annex 4-A) to
the concerned Regional Office. The receipt of payment shall be attached to the
records of the case.
The concerned Panel of Arbitrators shall transmit such notice together with the
records of the case within five (5) days to the Mines Adjudication Board.
SECTION 227. Proceedings Before the Panel - The proceedings before the Panel
shall comply substantially with the requirements of due process. The Panel may
avail itself of all reasonable means to ascertain the facts of the controversy speedily,
including ocular inspection and examination of well-informed persons.
SECTION 228. Postponement of Hearings - The parties and their counsels or
representative(s) appearing before the Panel shall be prepared for continuous
hearing. Postponements of hearing shall be allowed by the Panel only upon
meritorious grounds and subject always to the requirement of expeditious
disposition of cases. In the event of such postponements, the Panel shall set two or
more successive dates of hearing in advance.
SECTION 229. Priority for First Applicant in Conflict of Claims - Whenever there is
any conflict between two or more applicants over the contract/mining area, the
applicant who first filed and registered his application with the Mines Regional
Office concerned, shall be preferred in the processing of said application: Provided,
That such preferred applicant is qualified to acquire mining rights as provided for
under the Act and under these implementing rules and regulations and has paid the
required filing and occupation fees and that the area sought to be registered is free
and open for registration: Provided, further, That in case such applicant is
represented by an agent or attorney-in-fact, the power of attorney in writing shall be
recorded with the proper Regional Office on or before the registration of the
corresponding mining rights: Provided, finally, That if such authority is given in the
articles of Partnership/Incorporation, such Articles shall likewise be recorded with
the Regional Office concerned.
CHAPTER XXV
MINES ADJUDICATION BOARD/APPEALS
SECTION 230. Mines Adjudication Board - There shall be a Mines Adjudication
Board composed of three (3) members. The Secretary shall be the Chairman with the
Director of the Bureau and Undersecretary for Field Operations of the Department
as members thereof. The Board shall promulgate its own internal rules and
regulations governing its administration and disposition of appealed cases.
SECTION 231. Secretariat - The Bureau shall act as the Secretariat of the Board and
shall be provided with permanent and full time administrative support with sufficient
funding in its annual budget appropriation.
SECTION 232. Period to Resolve Appeal - The Board shall resolve the appeal within
thirty (30) days from submission thereof for decision.
SECTION 233. Petition for Review by Certiorari - The decision of the Board may be
reviewed by filing a petition for review with the Supreme Court within thirty (30)
days from receipt of the order or decision of the Board.CHAPTER XXVI
GOVERNMENT SHARE IN MINERAL AGREEMENTS/FTAAs
SECTION 234. Government Share in Mineral Production Sharing Agreement - The
total Government share in a mineral production sharing agreement shall be the
excise tax on mineral products as provided for in R. A. No. 7729, amending Section
151(a) of the National Internal Revenue Code, as amended.
For mineral production sharing agreements, other mining agreements or FTAA
within the mineral reservations, the Government share shall be in addition to the
royalties payable to the Government.
SECTION 235. Government Share in Other Mining Agreements - The share of the
Government in co-production and joint venture shall be negotiated by the
Government and the contractor taking into consideration: (a) capital investment in
the project, (b) risks involved, (c) contribution of the project to the economy, and (d)
other factors that will provide for a fair and equitable sharing between the parties.
The Government shall also be entitled to compensations for its other contributions
which shall be agreed upon by the parties, and shall consist, among other things, the
contractor's income tax, excise tax, special allowance, withholding tax due from the
contractor's foreign stockholders arising from dividend or interest payments to the
said foreign stockholders, in case of a foreign national, and all such other taxes,
duties and fees as provided for under existing laws.
SECTION 236. Government Share in FTAA - The Government share in a financial or
technical assistance agreement shall consist of, among others things, the contractor's
corporate income tax, excise tax, special allowance, withholding tax due from the
contractor's foreign stockholders arising from dividend or interest payments to the
said foreign stockholder in case of a foreign owned corporation and all such other
taxes, duties and fees as provided for under existing laws.
The Government share in an FTAA shall be negotiated by the government and the
contractor taking into consideration (a) capital investment of the project (b) risks
involved (c) contribution of the project to the economy (d) technical complexity of
the project and (e) other factors that will provide for a fair and equitable sharing
between the parties.
The collection of Government share shall commence after the FTAA contractor has
fully recovered its pre-operating, exploration and development expenses, inclusive.
The period of recovery which is reckoned from the date of commercial operation
shall be for a period not exceeding five years or until the date of actual recovery,
whichever comes earlier. For clarification, the Government's entitlement to its share
shall commence after the FTAA contractor has fully recovered its pre-operating,
exploration and development stage expenses, inclusive and the contractor's
obligations under Chapter XXVII of the rules and regulations do not arise until this
time.
SECTION 237. Place and Manner of Payment and Allocation of Government Share -
The Government share in a mineral agreement and FTAA as provided for in Sections
234, 235 and 237 hereof, shall be paid to the nearest Bureau of Internal Revenue(BIR) office where the mining contract area is located and in accordance with
existing BIR rules and regulations.
The Government share in mining operations within mineral reservations shall be
paid directly to the Bureau in addition to the royalty provided for in Section 23
hereof. The share of the Bureau from this royalty shall be paid separately and
directly to the Bureau.
The Government share shall be allocated in accordance with Sections 290 and 292
of R. A. No. 7160 otherwise known as the "Local Government Code of 1991." In
case the development and utilization of mineral resources is undertaken by a
government-owned or controlled corporation, the sharing and allocation shall be in
accordance with Sections 291 and 292 of the said Code.
CHAPTER XXVII
TAXES AND FEES
SECTION 238. Taxes -
a. Income Tax. - After the lapse of the income tax holiday as provided for in the
Omnibus Investment Code of 1987, as amended, the Contractor shall pay income tax
provided for in the National Internal Revenue Code, as amended.
b. Excise Tax on Mineral Products - The Contractor shall pay the excise tax on
mineral products as provided for under Section 151 of the National Internal Revenue
Code, as amended in accordance with the following:
1. On all metallic minerals, a tax based on the actual market value of the gross
output thereof at the time of removal, in case of those locally extracted or
produced; or the value used by the Bureau of Customs in determining tariff
and customs duties, net of excise tax and value-added tax in the case of
importation in accordance with the following schedule:
i. For Copper and other metallic minerals except gold and chromite -
Period of Production Excise Tax Rate
June 24, 1994 - June 23, 1997 1.0%
June 24, 1997 - June 23, 1999 1.5%
June 24, 1999 and onwards 2.0%
ii. Gold and chromite - a tax of two percent (2%).
2. On all non-metallic minerals and quarry resources, a tax of 2% based on the
actual market value of the annual gross output thereof at the time of removal,
in case of those locally extracted or produced; or the value used by the Bureau
of Customs in determining tariff and customs duties, net of excise tax and
value-added tax in the case of importation.
SECTION 239. Occupation Fees - There shall be collected from any contractor or
permittee on public or private lands, an annual occupation fee in accordance with thefollowing schedule:
a. For areas outside mineral reservation -
1. Exploration permit - Five (5.00) pesos per hectare or fraction thereof per
annum;
2. Mineral agreements and FTAA - Fifty (50.00) pesos per hectare or fraction
thereof per annum; and
b. For mineral reservation areas -
1. Exploration permits, mineral agreements and FTAA - One hundred (100.00)
pesos per hectare or fraction thereof per annum.
The Secretary is authorized to increase the occupation fees provided herein when the
public interest so requires, upon recommendation of the Director.
SECTION 240. Manner and Place of Payment of Occupation Fees - The occupation
fees shall be paid on the date the mineral agreement/FTAA is registered with the
appropriate office and on the same date every year thereafter. It shall be paid to the
Treasurer of the municipality or city where the onshore mining areas are located, or
to the Bureau in case of offshore mining areas. For this purpose, the appropriate
officer (the Director for FTAAs or the Regional Director for mineral agreements)
shall submit to the Treasurer of the municipality or city where the onshore mining
area is located, a complete list of all onshore mining rights registered with his/her
office, indicating therewith the names of the holders, area covered in hectares, name
of municipality or city and its provincial location, and date of registration. If the fee
is not paid on the date specified, the contractor shall pay a surcharge of twenty-five
per centum (25%) of the amount due in addition to the occupation fees.
If applied area lies on several municipalities, the Director in the case of mineral
reservations or the Regional Director in the case of areas outside mineral
reservations shall determine the amount to be paid by the contractor based on
official maps available in the respective offices and endorses the same to the
Municipal/City Treasurer concerned. If disagreements arise from this payment later,
the Provincial Governor shall decide on the proportionate amount to be paid to the
municipalities.
SECTION 241. Allocation of Occupation Fees - Thirty per centum (30%) of all
occupational fees collected from permittee/contractor in onshore mining areas shall
accrue to the province and seventy per centum (70%) to the municipality where the
onshore mining areas are located. In a chartered city, the full amount shall accrue to
the city concerned.
SECTION 242. Other Fees and Charges - Filing fees and other charges for services
rendered by the Bureau and/or its Regional Office shall be payable in accordance
with the fees and charges in Annex 4-A.
CHAPTER XXVIII
INCENTIVESSECTION 243. Incentives Available To Contractors And Permittees - investment
incentives granted under Executive Order No. 226 (EO 226), as amended, and
otherwise known as the "Omnibus Investment Code of 1987," the Act and other laws
shall be made available to contractors/permittees subject to their compliance with
the provisions and implementing rules and regulations of said laws. However, fiscal
and non-fiscal incentives sought to be availed of shall require prior approval from
the agency administering the incentives.
The incentives granted under Sections 91, 92 and 93 in Chapter XVI of the Act are
additional incentives aside from those available under the Omnibus Investment Code
of 1987, as amended. They are available to all contractors in mineral agreements or
FTAAs only to the extent in which they are engaged in activities covered by their
respective agreements.
SECTION 244. Availment Of Incentives Under EO 226, As Amended - Contractors
can avail of fiscal and non-fiscal incentives granted under EO 226, as amended,
subject to their registration with the Board of Investments (BOI) and compliance
with requirements provided for by the order and its rules and regulations. Holders of
exploration permits registered with BOI can also avail of fiscal incentives under EO
226, as amended, but only for the duration of the permits or effectivity of EO 226 as
amended, whichever comes first. BOI registration and enjoyment of incentives
under said registration shall be governed by the Investment Priorities Plan subject to
the provisions of EO 226, as amended, applicable rules and regulations and future
amendments thereof. The incentives availed of under EO 226 shall be administered
by BOI.
No entitlement to any incentive under EO 226 shall accrue to any contractor prior to
the date of approval of its mineral agreement, or FTAA and/or date of BOI
registration, as the case may warrant in the latter.
All mining activities shall always be included in BOI's listing of Investment
Priorities Plans.
SECTION 245. Availment Of Incentives For Pollution Control Devices - Pollution
control and infrastructure devices as herein defined which were acquired,
constructed or installed by contractors shall not be considered as improvements on
the land or building where they are placed, and as such, shall not be subject to real
property and other taxes or assessments.
The contractor shall avail of this incentive in writing to the Director supported by a
sworn report containing a detailed list of such devices and infrastructure together
with relevant maps or diagrams indicating their location and use in the operations.
Such report shall include the acquisition and installation cost of the devices or
infrastructure, the corresponding amount of tax exemption availed of by the
contractor. If such devices and infrastructure, after evaluation by the Bureau, were
found necessary and appropriate for the operations, only the Director shall issue a
Certificate of Tax-Exemption covering the declared devices and infrastructures for
the purpose of availing of exemption from local government taxes and assessment.
The Director or its representative shall monitor the utilization of these devices and
infrastructures in relation to the contractor's operation to ascertain that such are used
for pollution control purposes.A separate guideline on how to implement this Section shall be prepared by the
Bureau.
SECTION 246. Availment Of Incentive For Income Tax-Carry Forward of Losses - A
net operating loss without the benefit of income tax-accelerated depreciation
incurred in any year during the first ten (10) years of the contractor's operation may
be carried over as a deduction from taxable income for the next five (5) years
immediately following the year of such loss: Provided, That the net operating loss
shall be deducted from the taxable income derived from the activity covered by the
mineral agreement or FTAA.
Losses incurred in activities other than those pertinent to mining operations cannot
be carried over. Only such losses attributable to mining operations covered by the
mineral agreement or FTAA, incurred after the approval of the mineral agreement or
FTAA and within the ten-year period from date of commercial operation of activity
covered by such agreement shall be considered for purposes of availment of
incentives on income tax carry forward of losses.
Applications for availment of the incentive on income tax carry forward of losses
shall be filed with the Bureau within one (1) month from date of filing with the
Bureau of Internal Revenue of the Income Tax Return where net operating loss was
deducted.
The following documentary requirements relative to the application for the
availment of this incentive should be submitted to the Director:
a. Two (2) copies of Audited Financial Statement (AFS) and Income Tax Return
(ITR) for the year the net operating loss was incurred;
b. Two copies of the AFS and ITR for the year the net operating loss was partially
deducted or statement of projected income for the current year (duly certified by an
external auditor) from which the net operating loss may be deducted;
c. If the contractor is engaged in an activity other than that covered by the mineral
agreement or FTAA, the income statement must be aggregated per activity and duly
certified by an external auditor; and
d. Sworn statement issued by the contractor as to the start of commercial operation
of the activity applied for the incentive on income tax-carry forward of losses.
Late filing of application for availment of the incentive on income tax-carry forward
of losses shall incur a basic fine of 1/2 percent of the amount of the net operating
loss to be carried over to applicable taxable year as provided under Section 92 of the
Act plus a daily fine of five pesos (5) but not to exceed one hundred thousand pesos
(100,000) which shall be paid to the Bureau.
The net operating loss referred to in this Section shall be computed in accordance
with the provisions of the National Internal Revenue Code. The ten (10) year period
prescribed herein shall be counted from the first year of commercial operation in the
activity covered by the mineral agreement or FTAA. The computation of net
operating loss shall be subject to post audit by the Bureau of Internal Revenue.SECTION 247. Availment Of Incentive For Income Tax-Accelerated Depreciation -
At the option of the contractor and in accordance with procedure established by the
Bureau of Internal Revenue, fixed assets may be depreciated at the rates authorized
under Section 93 of the Act. Fixed assets refers to assets subject to depreciation
under the National Internal Revenue Code.
Contractors shall avail of this incentive in writing to the Director accompanied by a
sworn report containing detailed list of the fixed assets relevant to the contractor's
operation together with relevant maps and diagrams indicating the location and
names of the assets. Such report shall include the applicable book value, expected
life in years, depreciation schedule and the fixed asset's use in the contractor's
operation.
This incentive may also be availed of for fixed assets acquired before the date of the
approval/conclusion of the mineral agreement or FTAA, but only to the
undepreciated portion of the fixed assets.
As provided for under Section 93 of the Act, fixed assets may be depreciated as
follows:
a. To the extent of not more that twice as fast as the normal rate of depreciation or
depreciated at normal rate of depreciation if the expected life is ten (10) years or
less; or
b. Depreciated over any number of years between five (5) years and the expected life
if the latter is more than ten (10) years, and the depreciation thereon allowed as a
deduction from taxable income: Provided, That the contractor notifies the Bureau of
Internal Revenue at the beginning of the depreciation period which depreciation rate
allowed by this Section will be used.
In computing taxable income, the contractor may at his/her option, deduct
exploration and development expenditures accumulated at cost as of the date of the
exploration permit as well as exploration and development expenditures paid or
incurred during the taxable year: Provided, That the total amount deductible for
exploration and development expenditures shall not exceed twenty-five per centum
(25%) of the net income from mining operations. The actual operation shall be
carried forward to the succeeding years until fully deducted.
Net income from mining operations is defined as gross income from operations less
allowable deduction which are necessary or related to mining operations. Allowable
deductions shall include mining, milling and marketing expenses, depreciation of
properties directly used in the mining operations: Provided, That such other
deductions allowed by the BIR can also be deducted to arrive at the net income. This
paragraph shall not apply to expenditures for the acquisition or improvement of
property of a character which is subject to the allowances for depreciation.
Either of the following methods shall apply in the treatment of income tax
accelerated depreciation in the income statement:
a. Accelerated depreciation charges may be shown as among the expense items to be
deducted from the net income; orb. Depreciation expenses at normal life of the assets may be shown as among the
expense items to be deducted from the net income. The accelerated depreciation
would be made only in the adjustment of the taxable income for income computation
as an additional expense.
SECTION 248. Simultaneous Availment Of Incentives Under EO 226 And Additional
Incentives Under The Act - The contractor may avail of either the incentive on
Income Tax-Carry Forward of Losses under Section 92 of the Act or the Income Tax
Holiday provided under EO 226, as amended. If the contractor opts to avail of the
Income Tax Holiday incentive under its BOI registration, if and when applicable,
then the incentive on Income Tax Carry Forward of Losses under the Act should not
be granted to him/her and vice versa. It should then be a choice between Income Tax
Holiday or Income Tax-Carry Forward of Losses, with the choice of the first
availment governing the succeeding availments. There shall be no switching of these
two incentives within the entire prescribed period within which the contractor is
entitled to such incentives.
In availing of the Income Tax Holiday incentive under EO 226, as amended, the
contractor shall submit to the BOI a certification from the Director that the
contractor has never availed of the incentives on Income Tax-Carry Forward of
Losses under the Act during the term of the mineral agreement or FTAA. In the same
light, contractors availing of the incentive on Income Tax-Carry Forward of Losses
shall submit a certification from the BOI that the contractor has never availed of the
Income Tax Holiday incentive under EO 226, as amended during the duration of the
mineral agreement or FTAA.
Incentives on Income Tax Accelerated Depreciation provided under Section 93 of
the Act may be availed of simultaneously with the Income Tax Holiday provided
under the BOI registration.
SECTION [251]249. Conditions For Availment Of Incentives - The contractor's right
to avail of incentives under Sections 246 to 248, both inclusive, shall be subject to
the following conditions:
a. Compliance with obligations. - The contractor shall observe and abide by the
provisions of the Act and its implementing rules and regulations, and take adequate
measures to ensure that its obligations thereunder are faithfully discharged;
b. Compliance with directives. - The contractor shall comply with the directives and
instructions which the Bureau may issue from time to time in pursuance of its
authority under the law;
c. Visitorial powers - The contractor shall allow the duly authorized representatives
of the Bureau to inspect and examine its books of accounts and other pertinent
records and documents to ascertain compliance with the Act and its implementing
rules and regulations, and the terms and conditions of the mineral agreement or
FTAA;
d. Delinquent contractors - No availment of incentives may be allowed to a
contractor delinquent in compliance with any of the terms and conditions of the
mineral agreement or FTAA and/or with the terms and conditions of registrationwith BOI as the case may warrant, including submission of reports and statistical
data which may be required by the Bureau and/or BOI; and
e. Activities not covered by the mineral agreement of FTAA - The contractor
proposing to engage in activities not covered by its mineral agreement or FTAA
shall install an adequate accounting system segregating the investments, revenues,
sales, receipts, purchases, payrolls, costs, expenses, and profits and losses of its
operations covered by mineral agreement or FTAA from those which are not
covered; or the Bureau may, in appropriate cases, require the establishment of a
separate entity for the activity covered by the agreement in order to facilitate the
proper implementation of the Act.
SECTION 250. Investment Guarantees - In addition to the above, the Contractor
especially foreign investors shall be entitled to the basic rights and guarantees
provided in the Constitution and such other rights recognized by the Government as
enumerated hereunder:
a. Repatriation of investments - In the case of foreign investments, the right to
repatriate the entire proceeds of the liquidation of the investment in the currency in
which the investment was originally made and at the exchange rate prevailing at the
time of repatriation;
b. Remittance of earnings - In the case of foreign investments, the right to remit
earnings from the investment in the currency in which the investment was originally
made and at the exchange rate prevailing at the time of remittance;
c. Foreign loans and contracts - The right to remit at the exchange rate prevailing at
the time of remittance such sums as may be necessary to meet the payments of
interest and principal on foreign loans and foreign obligations arising from technical
assistance contracts;
d. Freedom from expropriation - There shall be no expropriation by the Government
of the property represented by investments or loans or of the property of the
enterprise except for public use or in the interest of national welfare or defense and
upon payment of just compensation. In such cases, foreign investors or enterprises
shall have the right to remit sums received as compensation for the expropriated
property in the currency in which the investment was originally made and at the
exchange rate prevailing at the time of remittance;
e. Requisition of investment - There shall be no requisition of the property
represented by the investment or of the property of the enterprises except in the
event of war or national emergency and only for the duration thereof. Just
compensation shall be determined and paid either at the time of requisition or
immediately after cessation of the state of war or national emergency. Payments
received as compensation for the requisitioned property may be remitted in the
currency in which the investments were originally made and at the exchange rate
prevailing at the time of remittance; and
f. Confidentiality - Any information supplied by the contractor which has been
agreed upon by the parties in the negotiation as confidential pursuant to the Act and
these implementing rules and regulations shall be treated as such during the term ofthe project to which it relates. However, the following information shall not be
classified as confidential:
1. Production and sales of minerals;
2. Employment;
3. Royalty and tax payments;
4. Metallic and Non-metallic Reserves;
5. Operational parameters such as mining and milling capacities and
rates, mine and mill recoveries, dilution factors, etc.; and
6. Other data as may be agreed upon by the parties.
The term confidentiality refers only to the act of divulging publicly any information
classified as such. It does not prevent the Director or his/her representative(s) from
using the data internally within the Bureau for monitoring and for policy, planning
and research studies. Documents not otherwise covered by a valid confidentiality
agreement between the concerned parties shall be made available to the public upon
the filing of an appropriate request duly approved by the authorized officer.
Reproduction of such documents shall be allowed upon presentation of an approved
written request in sufficient form and payment of reasonable fees.
CHAPTER XXIX
CANCELLATION, REVOCATION AND TERMINATION OF A
PERMIT/MINERAL AGREEMENT/FTAA.
SECTION 251. Grounds - The following are the grounds for cancellation, revocation
and termination of a permit/mineral agreement/FTAA:
a. Violation of any of the terms and conditions of the permits or agreements;
b. Non-payment of taxes and fees due the Government for two (2) consecutive
years; and
c. Falsehood or omission of facts in the application for exploration permit, mineral
agreement, FTAA, or other permits which may alter, change or affect substantially
the facts set forth in said statements.
SECTION 252. Suspension or Cancellation of Tax Incentives and Credits -
a. Grounds for cancellation/suspension - The Bureau may suspend or cancel wholly
or partially any incentive granted under the rules and regulations for any cause
including the following:
1. Any violation of the Act, rules and regulations implementing the same or of
the terms and conditions in the mineral agreement or FTAA;
2. Any material misrepresentation or false statements made to the Bureau at any
time before or after the approval/conclusion of its mineral agreement or FTAA;
3. Whenever the project ceases to be viable and its continued operation would
require additional costs to the economy. In this case, the Bureau shall evaluate
the status of the project and shall decide if suspension/cancellation shall be
imposed;b. Withdrawal from the mineral agreement or FTAA - Whenever a contractor decides
to withdraw from business or suspend its operations covered by the agreement,
written notice thereof shall be sent to the Director before decision is implemented.
Withdrawal from business operations shall automatically cancel the mineral
agreement or FTAA. Upon such withdrawal, the contractor shall cease to be entitled
to the incentives. The effect of withdrawal from business or suspension of operations
covered by the agreement shall, in each particular instance, be determined by the
Bureau, taking into account the reasons therefor; or
c. Refund and penalties - In case of cancellation of the mineral agreement or FTAA,
the Bureau may in appropriate cases, recommend to other incentive-dispensing
agencies the cancellation of registration without prejudice to the imposition of the
corresponding penalties and refund of incentives availed of pursuant to and under
EO 226, laws creating export processing zones and other laws.
SECTION 253. Effect of Expiration and Cancellation of a Permit and Mineral
Agreements/FTAA - Upon the expiration of a permit or mineral agreement/FTAA,
the mining operations may be undertaken by the Government through one of its
agencies or through a qualified independent contractor. In the latter case the contract
shall be awarded to the highest bidder in a public bidding held after due publication
of the notice thereof. The contractor/permit holder shall have the right to equal the
highest bid upon reimbursement of all reasonable expenses of the highest bidder.
Upon cancellation of a mineral agreement/FTAA, the Director shall cause the same
to be entered in the registration book and a notice thereof shall be posted on the
bulletin board of the Bureau and Regional Office and the mining area covered
thereby shall thereupon be open to new applicants.
Non-payment of taxes and fees causing for the cancellation of a mineral
agreement/FTAA shall have also the effect of re-opening the mining area to new
applicants.
CHAPTER XXX
ORGANIZATIONAL SET-UP OF THE MGB AS LINE BUREAU
SECTION 254. Organizational Set-up - The Mines and Geosciences Bureau shall be
comprised of a Central Office and the necessary regional, district and other pertinent
offices. The Secretary shall issue the necessary administrative order for the
organizational set-up of the Mines and Geosciences Bureau as a line bureau.
The staff Mines and Geosciences Bureau created under DENR Administrative Order
No. 1, Series of 1988, shall be transformed to become the Central Office of the said
Bureau under the Act.
The Mines and Geosciences Development Services created pursuant to DENR
Administrative Order No. 41, Series of 1990, shall also become the regional offices
of the same Bureau.
CHAPTER XXXI
REPORTING REQUIREMENTS AND FINESSECTION 255. Reporting Requirements - Every contractor or holder of any of the
permits covering exploration, quarry resources, sand and gravel, guano and
gemstone and Mineral Processing or its operator is required to submit the following
reports:
a. Monthly Report On Production, Sales And Inventory Of Metallic Minerals And
Employment - A contractor or its operator or holder of mineral processing permit
shall submit to the Director a sworn Monthly Report on Production, Sales, and
Inventory of Metallic Minerals and Employment as prescribed in MGB Forms Nos.
31-1 to 31-9, whichever mineral is applicable, within fifteen (15) days after the end
of each calendar month.
b. Monthly Report On Production, Sales And Inventory Of Non-Metallic Minerals
And Employment - In the case of mineral agreements, FTAAs or Mineral Processing
Permits involving non-metallic minerals, a contractor or its operator or permit holder
shall submit to the Regional Director concerned, copy furnished the Director, a
sworn Monthly Report on Production, Sales and Inventory of Non-Metallic Minerals
and Employment as prescribed in MGB Form No. 31-10 within fifteen (15) days
after the end of each calendar month.
c. Quarterly Report on Production, Sales And Inventory Of Quarry Resources
(Except Sand and Gravel) And Employment - A holder of a quarry permit or its
operator shall submit to the Provincial Governor/City Mayor, copy furnished the
Director and Regional Director concerned, a sworn Quarterly Report on Production,
Sales and Inventory of Quarry Resources and Employment as prescribed in MGB
Form No. 31-11 within fifteen (15) days after the end of each calendar quarter.
d. Monthly Report on Production, Sales And Inventory Of Industrial Sand and
Gravel And Employment - A holder of an industrial sand and gravel permit or its
Operator shall submit to the Director, copy furnished the Regional Director
concerned, a sworn Monthly Report on Production, Inventory and Sales of Industrial
Sand and Gravel And Employment as prescribed in MGB Form No. 31-12 within
fifteen (15) days after the end of each calendar month.
e. Monthly Report on Production And Sales of Commercial Sand and Gravel And
Employment - A holder of a commercial sand and gravel permit or its Operator shall
submit to the Provincial Governor/City Mayor, copy furnished the Director and
Regional Director concerned, a sworn Monthly Report on Production, Sales And
inventory of Commercial Sand and Gravel And Employment as prescribed on MGB
Form No. 31-13 within fifteen (15) days after the end of each calendar month.
f. Quarterly Report on Production And Sales Of Small-Scale Metallic Mines And
Employment - The holder of a Small-Scale Metallic Mines Permit shall submit to
the Provincial Governor/City Mayor, copy furnished the Director and Regional
Director concerned, a sworn Quarterly Report on Production and Sales of Small
Scale Metallic Mines and Employment as prescribed on MGB Form No. 31-14 for
metallic minerals other than gold or MGB Form No 31-15 for gold mineral only
within fifteen (15) days after the end of each calendar quarter.
g. Integrated Annual Report - A Contractor of a mineral agreement, FTAA or
Mineral Processing Permit holder or its operator shall submit to the Director a swornIntegrated Annual Report using prescribed MGB Form No. 31-16 within two (2)
months after the end of each calendar year.
A holder of a Quarry Permit or its Operator shall likewise submit same report (MGB
Form No. 31-16) to the Provincial Governor/City Mayor concerned, copy furnished
the Director and the Regional Office concerned, within two (2) months after the end
of each calendar year.
All books of accounts, reports and correspondences shall be filed and kept by the
Contractor/Quarry Resources Permit Holder or its Operators and shall be opened at
all times for verification by the Director or its duly authorized representative.
A Small-Scale Mining Permit Holder shall submit to the Provincial Governor/City
Mayor, copy furnished the Director and the Regional Director concerned, a sworn
Integrated Annual Report for Small Scale Mines as prescribed on MGB Form No.
31-17 within two (2) months after the end of each calendar year.
h. Quarterly Energy Consumption Report - A Contractor of mineral
agreement/FTAA or Mineral Processing Permit holder or its Operator shall submit to
the Director, copy furnished the Regional Director concerned, a Quarterly Energy
Consumption Report using prescribed MGB Form No. 31-18 within fifteen (15)
days after the end of each calendar quarter.
A holder of a Quarry Permit or its Operator shall submit to the Provincial
Governor/City Mayor, copy furnished the Director and the Regional Director
concerned, a Quarterly Energy Consumption Report using prescribed MGB Form
No. 31-18 within fifteen (15) days after the end of each calendar quarter.
i. Quarterly Drilling Report - A contractor or permittee conducting any drilling
project or a lessee of an MGB drill machine shall submit to the Director a sworn
Quarterly Drilling Report in his/her contract area/permit area/project area within
thirty (30) days at the end of each calendar quarter. This drilling report shall include,
among others, a description of the geology, a topographic- drill collar location map
in 1:50,000 scale and corresponding drill section showing geology: structures and
orebody, if applicable; and the core log which shall contain the coordinates of the
collar elevation, drill inclination, direction and length, and the physical/chemical
analysis of the cores.
j. Annual Mineral Reserve Inventory Report - A contractor of a mineral
agreement/FTAA or its operator shall submit to the Director copy furnished the
concerned Regional Director, an Annual Mineral Reserve/Resources Inventory
Report using the prescribed MG8 Form No. 31-19, on or before the end of the first
quarter of each calendar year.
For areas outside mineral reservations, a holder of Quarry, Sand and Gravel, and
Small-Scale Mining Permit or its operator shall likewise submit the same report
(MGB Form No. 31-20) to the Provincial Governor/City Mayor concerned, copy
furnished the Director and the Regional Director concerned, on or before the end of
the first quarter of each calendar year. For areas within mineral reservations, the
permit holder or its operator shall submit the same report to the Director.The contractor/permittee/operator may submit other types of mineral reserve report
provided that the required information data contained in the said form must be
included in their report.
k. Monthly General Accident Report - A contractor, permit holder or its operator
shall submit to the Regional Office and Bureau within fifteen (15) days after each
calendar month a Monthly General Accident Report using MGB Form 18-5.
l. Monthly Explosive Consumption Report - Holders of Purchaser's License for
explosives shall submit to the Regional Director, copy furnished the Director, a
Monthly Explosive Consumption Report within fifteen (15) days after each calendar
month using the prescribe MGB Form 18-7.
m. Semi-Annual Report on Mine Waste and Tailings Generated - Refer to relevant
section in these implementing rules and regulations.
n. Semi-Annual Status Report on the Environmental Work Program - Refer to
relevant section in these implementing rules and regulations.
o. Quarterly Report on Production, Sales, and Inventory of Small-Scale Mines
Within Mineral Reservation - The holder of a small-scale mining permit within a
mineral reservation shall submit to the Director, a sworn and verified Quarterly
Report on Production, Sales, and Inventory of Small-Scale Mines Within Mineral
Reservation as prescribed in MGB Form No. 31-20 within 30 days after the end of
each calendar quarter.
p. Annual and Quarterly Status Report based on Work Program of MPSA/FTAA
Contractor - Refer to relevant section of these implementing rules and regulations.
q. Annual Land Use Report - A contractor of a mineral agreement or FTAA or its
operator shall submit to the Director a sworn annual land use report within sixty
days after each calendar year.
r. Other reports as may be required by the Director - The contractor of a mineral
agreement or the holder of a Quarry Permit, any of the Sand and Gravel permits,
Guano Permit, Gemstone Gathering Permit or Small Scale Mining Permit is also
required to submit reports (a) to (h) mentioned in this Section, whichever is
applicable to its operation, even when there is no production for a given period. The
report, however, should indicate the causes or reasons for non-production. The
Director, Regional Director concerned and in the case of Quarry Resources and
Small-Scale Mining Permits, the Provincial Governor/City Mayor shall be promptly
notified in writing before implementation of any mine suspension or mine closure.
Submission of the applicable report cited above shall be made part of the terms and
conditions of mineral agreements, FTAA, exploration permit, quarry permit, sand
and gravel permit, guano permit and gemstone gathering permit.
SECTION 256. Fines - In case of late or non-submission of any of the reports
mentioned in Section 255 (a) to (h) and (o), the following fines shall be imposed:
a. Late submission of any of the required reports including copies to be furnished to
the Director and Regional Director concerned.Basic Fine Daily Fine
1st Violation 1,000.00 10.00
2nd Violation 2,000.00 20.00
3rd Violation and
3,000.00 30.00
subsequent violations
b. Non-submission of any of the required reports after one (1) month from the
prescribed reporting period.
Basic Fine Daily Fine
1st Violation 2,000.00 20.00
2nd Violation 3,000.00 30.00
3rd Violation and
5,000.00 50.00
subsequent violations
Provided, That, a late report classified under non-submission category shall not pay
the accumulated fine in (a) but instead pay the fines imposed in (b) of this Section.
Provided further that, the total fine for non-submission of any of the required reports
at any one time shall not exceed 10,000.00.
c. Failure of the Contractor or holder of any of the Quarry Resources Permits or its
Operator to submit any of the reports prescribed in the preceding Section three
months after the third violation or failure to pay fines within one (1) year shall be
sufficient ground for cancellation or non-renewal of a permit, mineral agreement or
FTAA.
In case of late or non-submission of reports mentioned in Section 255 (h) to (q)
except (m), a fine of 1,000.00 shall be imposed. The Secretary may adjust the above-
mentioned fines from time to time as conditions may warrant such changes.
Payment of fines involving the herein cited reports shall be made to the Treasurer or
Cashier of the following offices:
a. Provincial Governor - MGB Form No. 31-11
City Mayor - MGB Form No. 31-13
- MGB Form No. 31-14
- MGB Form No. 31-15
- MGB Form No. 31-17
- MGB Form No. 31-18
- MGB Form No. 31-10 (for mineral
b. Regional Director
agreements and FTAA's)
c. Director - MGB Forms No. 31-1 to 9
- MGB Form No. 31-16
- MGB Form No. 31-18- MGB Form No. 31-12
CHAPTER XXXII
TRANSITORY AND MISCELLANEOUS PROVISIONS
SECTION 257. Non-impairment of Existing Mining/Quarrying Rights - All valid and
existing mining lease contracts, permits/licenses, leases pending renewal, mineral
production-sharing agreements, FTAA granted under Executive Order No. 279, at
the date of the Act shall remain valid, shall not be impaired, and shall be recognized
by the Government: Provided, that the provisions of Chapter XXVI on government
share in Mineral Production-Sharing Agreement and of Chapter XVIII on incentives
of these implementing rules and regulations shall immediately govern and apply to a
mining lessee or contractor unless the mining lessee or contractor indicates its
intention to the Secretary, in writing, not to avail of said provisions: Provided,
further, That no renewal of mining lease contracts shall be made after the expiration
of its term: Provided, finally, That such leases, production-sharing agreements,
Financial or Technical Assistance Agreements shall comply with the applicable
provisions of these implementing rules and regulations.
All pending applications for MPSA/FTAA and exploration permits issued prior to
the promulgation of these implementing rules and regulations shall be governed by
the provisions of the Act and these implementing rules and regulations: Provided,
however, that where the grant of such FTAA applications/proposals would exceed
the maximum contract area restrictions contained in Section 34 of the Act, the
applicant/proponent may assign, to the extent allowed by law, the excess area, to
other qualified person(s), as defined by law, within a period of one (1) year from the
effectivity of these implementing rules and regulations, otherwise, the same shall be
considered relinquished and open to mining operations: Provided, finally, That this
provision is applicable only to all FTAA applications filed under DAO 63 prior to
the approval of the Act.
All pending applications for Industrial Sand and Gravel Industrial Permit covering
more than five (5) hectares with the local government unit shall be endorsed to the
concerned Regional Office for its processing, evaluation, and approval.
SECTION 258. Recognition of Valid and Existing Mining Claims and Lease/Quarry
Applications - Holders of valid and existing mining claims, lease/quarry applications
shall be given preferential rights to enter into any mode of mineral agreement with
the Government within two (2) years from the promulgation of these implementing
rules and regulations: Provided, That failure on the part of the holders of valid and
subsisting mining claims, lease/quarry applications to exercise its preferential rights
within two (2) years from the promulgation of these implementing rules and
regulations to enter into any mode of mineral agreements shall constitute automatic
abandonment of the mining claims, quarry/lease applications and the area thereupon
shall be declared open for relocation by other interested parties.
SECTION 259. Separability Clause - If any clause, sentence, section or provision of
these implementing rules and regulations is held or declared to be unconstitutional
or invalid by a competent court, the remaining parts of these implementing rules and
regulations shall not be affected thereby.SECTION 260. Repeal and Amendment - All orders, rules and regulations
inconsistent with or contrary to the provisions of these implementing rules and
regulations are hereby repealed or modified accordingly. The Secretary shall
furthermore have the authority, inter alia, to amend, revise, add to, clarify,
supplement, interpret, delete or make exceptions (to the extent not contrary to the
provisions of the Act) to any provisions of these implementing rules and regulations
with the end in view of ensuring that the Act or its objectives are appropriately
implemented, enforced and achieved.
SECTION 261. Effectivity - These implementing rules and regulations shall take
effect fifteen (15) days following its complete publication in two newspapers of
general circulation.
Adopted: 15 Aug. 1995
(SGD.) VICTOR O. RAMOS
Secretary
*
Not Included here.