RULES AND REGULATIONS IMPLEMENTING REPUBLIC
ACT NO. 7832
Pursuant to Section 14 of Republic Act No. 7832, the Energy Regulatory Board
hereby adopts and promulgates the following Rules and Regulations to implement
the aforesaid law.
RULE I
General Provisions
SECTION 1. Title — These Rules shall be known as the Implementing Rules and
Regulations of the Anti-Pilferage of Electricity and Theft of Electric Transmission
Lines/Materials Act of 1994.
SECTION 2. Construction — These Rules shall be strictly construed to attain the
efficient and effective implementation of R.A. 7832.
SECTION 3. Definition of Terms — As used in this Rules:
a. "ERB" means the Energy Regulatory Board;
b. "DOE" means the Department of Energy;
c. "NEA" means the National Electrification Administration;
d. "NPC" means the National Power Corporation;
e. "Utility" means the Private or Investor-owned Electric Utility and that
owned and/or operated by the Municipal, City, Provincial or National
Government;
f. "Cooperative" means the Rural Electric Cooperative;
g. "Electric Power Transmission Line/Material" refers to electric
power transmission steel towers, wood-poles, cables, wires, insulators,
line hardwares, electrical conductors and other related items with
minimum voltage of sixty-nine kilovolts (69 kv), such as the following:
1. Steel transmission line towers made of galvanized steel angular
members and plates or creosoted and/or tannelized
woodpoles/concrete poles and designed to carry and support the
conductors;
2. Aluminum conductor steel reinforced (ACSR) in excess of one
hundred (100) MCM;3. Overhead ground wires made of 7 strands of galvanized steel wires,
3.08 millimeters in diameter and designed to protect the electrical
conductors from lightning strikes;
4. Insulators made of porcelain or glass shell and designed to insulate
the electrical conductors from steel towers or woodpoles; and
5. Various transmission line hardwares and materials made of
aluminum alloy or malleable steel and designed to inter-connect the
towers, conductors, ground wires, and insulators mentioned in
subparagraphs (1), (2), (3), and (4) above for the safe and reliable
operation of the transmission lines.
h. "Differential Billing" shall refer to the amount to be charged to the
person concerned for the unbilled electricity illegally consumed as
determined through the use of methodologies outlined in Section 6 of
R.A. 7832;
i. "Apprehension" shall be understood to mean the discovery of the
presence of any of circumstances enumerated in Section 4 of R.A. No.
7832 in the establishment or outfit of the consumer concerned as
personally witnessed and attested to by the consumer concerned or a duly
authorized ERB representative or any officer of the law, as the case may
be.
j. "Power Sold by NPC or any other entity that supplies power
directly to the consumer" is deemed to be sale directly to the consumer
if: (1) the point of metering by the NPC or any other utility is less than
one thousand (1,000) meters from the consumer, or (2) consumer’s
electric consumption is three (3%) or more of the total load consumption
of all the customers of the utility, or (3) there is no other consumer
connected to the distribution line of the utility which connects to the
NPC or any other utility point of metering to the consumer meter;
k. "Current Bill" shall mean the latest monthly bill served by the utility
or cooperative which does not include any period before the time of
apprehension;
l. "Current Rate" shall mean the average rate of electricity per kilowatt-
hour as reflected in the current bill.
RULE II
Illegal Use of Electricity and Theft of Electric Power
Transmission Lines and Materials
SECTION 1. Illegal, Use of Electricity — It shall be unlawful for any person, natural
or juridical, private or public to:
a. Tap, make or cause to be made any connection with overhead lines,
service drops, or other electric service wires, without previous authority
or consent of the private electric utility or rural electric cooperative
concerned;b. Tap, make or cause to be made any connection to the existing electric
service facilities of any duly registered consumer without the latter’s or
the electric utility’s consent or authority;
c. Tamper, install or use a tampered electrical meter, jumper, current
reversing transformer, shorting or shunting wire, loop connection or any
other device which interferes with the proper or accurate registry or
metering of electric current or otherwise results in its diversion in a
manner whereby electricity is stolen or wasted;
d. Damage or destroy an electric meter, equipment, wire or conduit or
allow any of them to be so damaged or destroyed as to interfere with the
proper or accurate metering of electric current; and
e. Knowingly use or receive the direct benefit of electric service obtained
through any of the acts mentioned in subsections (a), (b), (c) and (d)
above.
SECTION 2. Theft of Electric Power Transmission Lines and Materials — It shall be
unlawful for any person, natural on juridical, public or private to:
a. Cut, saw, slice separate, split, severe, smelt or remove any electric
power transmission line/material or meter from a tower, pole, any other
installation or place of installation or any other place or site where it may
be rightfully or lawfully stored, deposited, kept, stocked, inventoried,
situated or located, without the consent of the owner, whether or not the
act is done for profit or gain;
b. Take, carry away or remove or transfer, with or without the use of a
motor- vehicle or other means of conveyance, any electric power
transmission line/material or meter from a tower, pole any other
installation of place or installation, or any place or site where it where it
may be rightfully or unlawfully stored, deposited, kept, stocked,
inventoried, situated or located, without the consent of the owner,
whether or not the act is done for profit or gain;
c. Store, possess or otherwise keep in his premises, custody or control,
any electrical power transmission line/material or meter without the
consent of the owner, whether or not the act is done for profit or gain;
and
d. Load, carry, ship or move from one place to another, whether by land,
air or sea any electrical power transmission line/material, whether or not
the act is done for profit or gain, without first securing a clearance/
permit for the said purpose from its owner or the NPC or its regional
office concerned, as the case may be.
RULE III
Prima Facie Evidence
SECTION 1. Prima Facie Evidence of Illegal Use of Electricity — The presence of
any of the following circumstances shall constitute prima facie evidence of illegaluse of electricity by the person benefited thereby:
a. The presence of a bored hole on the glass cover of the electric meter or
at the back or any part of said meter;
b. The presence of salt, sugar and other elements inside the electric meter
that could result in the inaccurate registration of the meter’s internal parts
to prevent its accurate registration of consumption of electricity;
c. The existence of any wiring connection which affects the normal
operation or registration of the electric meter;
d. The absence of an ERB/NEA seal or the presence of a tampered,
broken or fake seal on the meter or mutilated, altered or tampered meter
recording chart or graph or computerized chart, graph or log;
e. The presence of a current reversing transformer, jumper, shorting
and/or shunting wire and/or loop connection or any other similar device
in any part of a building or its premises which is subject to the control of
the consumer or on the electric meter;
f. The mutilation, alteration, reconnection disconnection, bypassing or
tampering of instruments, transformers and accessories;
g. The destruction of or attempt to destroy any integral accessory of the
metering devise box which encases an electric meter or its metering
accessories; and
h. The acceptance of money and/or other valuable consideration by any
officer or employee of the electric utility concerned or the making of
such an offer to any such officer or employee for not reporting the
presence of any of the circumstances enumerated in subparagraphs (a),
(b), (c), (d), (e), (f ), or (g), hereof.
A prima facie evidence of illegal use of electricity shall be the basis for: (a)
immediate disconnection by the electric utility or cooperative to such person after
due notice; (b) the holding of preliminary investigation by the prosecutor and the
subsequent filing in court of the pertinent information; and (c) the lifting of any
temporary restraining order or injunction which may have been issued against a
utility or cooperative.
In order to constitute prima facie evidence, the discovery of any of the
circumstances enumerated in Section 1 thereof, must be personally witnessed and
attested to by the consumer concerned or a duly authorized ERB representative or
any officer of the law, as the case may be.
An ERB authorized representative is one who is assigned to conduct testing of
electric meters or inspection of electric lines and facilities of any distribution entity
or one who may be specially authorized by the duly authorized head of the main
regional ERB offices.An officer of the law is any person who, by direct provision of law or by election or
by appointment by competent authority, is charged with the maintenance of public
order and the protection and security of life and property, such as barangay captain,
barangay chairman, barangay councilman, barangay leader, officer or member of
Barangay Community Brigades, barangay policeman, PNP policeman, municipal
councilor, municipal mayor and provincial fiscal.
SECTION 2. Prima Facie Evidence of Theft of Electric Power Transmission Lines
and Materials — The possession, control or custody of electric power transmission
line/material by any person, natural or juridical, not engaged in the transformation,
transmission or distribution of electric power, or in the manufacture of such electric
power transmission line/material shall be prima facie evidence that such
line/material is the fruit of the offense defined in Section 2, Rule II hereof, and such
line/material may be confiscated from the person in possession, control or custody
thereof.
RULE IV
Incentives
SECTION 1. Incentive Scheme — An incentive scheme by way of monetary reward
in the minimum amount of Five Thousand Pesos (P 5,000) shall be given to any
person who shall report to the NPC or police authorities any act which may
constitute a violation of Section 2, Rule II hereof. The Department of Energy (DOE),
in consultation with the NPC, shall issue the necessary guidelines for the proper
implementation of this incentive scheme within thirty (30) days from the effectivity
of R.A. 7832.
RULE V
Disconnection of Electric Service
SECTION 1. Right to Disconnect and its Requirements — The utility or cooperative
concerned shall have the right and authority to disconnect immediately the electric
service of any person, natural or juridical, without the need of a court or
administrative order and deny restoration of the same, in the following
circumstances:
a. When the owner/occupant of the house or establishment concerned or
someone acting in his behalf shall have been caught in flagrante delicto
doing any of the acts enumerated in Section 1, Rule III hereof, Provided:
that a written notice or warning to that effect has been serve by the utility
or cooperative concerned to the owner of the house/establishment or his
duly authorized representative, prior to such disconnection.
b. When any of the circumstances enumerated in Section 1, Rule III shall
have been discovered for the second time, Provided: that a written notice
or warning shall have been issued upon the first discovery.
The written notice or warning being referred to herein shall be served prior to such
disconnection and shall indicate the name and address of the consumer, consumer
account number, date of apprehension, findings of fact, amount of energy pilfered in
kilowatt-hour, the amount representing the differential billing as determined herein,
which shall indicate the following :a. Computation of the unbilled consumption in kilowatt-hour.
b. The period to be used in computing the differential billing.
c. The latest Inspection Report prior to apprehension.
SECTION 2. Deposit — The utility or cooperative concerned shall not immediately
disconnect or shall immediately restore the electric service upon the deposit by the
person denied the service with the utility or the cooperative concerned or with the
competent court, as the case may be, of the amount representing the differential
billing.
RULE VI
Penalties
SECTION 1. Liability of the Utility/Cooperative — If the court finds by final
judgment that the person has not committed illegal use of electricity, the amount
deposited shall be credited against future billings, with legal interest thereon
chargeable against the utility or cooperative.
Likewise, the utility or cooperative shall be made to immediately pay such person
double the value of the payment or deposit with legal interest, which amount shall be
creditable against immediate future billings.
The foregoing remedies are without prejudice to any criminal, civil or administrative
action that such person may be entitled to file under existing laws, rules and
regulations.
SECTION 2. Liabilities under Section 1, Rule II hereof — If the person has been
found by final judgment to have violated Section 1, Rule II hereof, he shall be made
to pay the utility or the cooperative concerned double the value of the estimated
electricity illegally used which is referred to in this section as differential billing, in
addition to the penalty of prision mayor or a fine of Ten Thousand Pesos (P
10,000.00) to Twenty Thousand Pesos (P 20,000.00) or both, at the discretion of the
court.
a. If the offense is committed by, or in connivance with, an officer or
employee of the power company, electric utility or rural electric
cooperative concerned, such officer or employee shall, upon conviction,
be punished with a penalty one (1) degree higher than the penalty
provided herein, and forthwith be dismissed and perpetually disqualified
from employment in any public or private utility or service company and
from holding any public office.
b. If in committing any of the acts enumerated in Section 1, Rule II
hereof, any of the other acts enumerated is also committed, then the
penalty next higher in degree as provided herein shall be imposed.
c. If in committing any of the acts enumerated in Section 1, Rule II
hereof, any of the other acts enumerated is also committed by, or in
connivance with an officer or employee of the power company, utility or
cooperative concerned, such officer or employee shall, upon conviction,be punished with a penalty of one (1) degree higher than the penalty
provided herein, and forthwith be dismissed and perpetually disqualified
from employment in any public or private utility or service company.
Likewise the electric utility concerned which shall have knowingly
permitted or having knowledge of its commission shall have failed to
prevent the same, or was otherwise guilty of negligence in connection
with the commission thereof, shall be made to pay a fine not exceeding
triple the amount of the “differential billing” subject to the discretion of
the courts.
d. If the violation is committed by a partnership, firm, corporation,
association, or any other legal entity, including a government-owned or
controlled corporation, the penalty shall be imposed on the president,
manager, and each of the officers thereof who shall have knowingly
permitted, failed to prevent or was otherwise responsible for the
commission of the offense.
SECTION 3. Liabilities under Section 2, Rule II hereof — A person found by final
judgment to have violated Section 2, Rule II hereof, shall be meted the penalty of
reclusion temporal or a fine ranging from Fifty Thousand Pesos (P 50,000.00) to
One Hundred Thousand Pesos (P 100,000.000) or both, at the discretion of the court.
a. If the offense is committed by, or in connivance with, an officer or
employee of the power company, utility or cooperative concerned, such
officer or employee shall, upon conviction, be punished with a penalty
one (1) degree higher than the penalty provided herein, and forthwith be
dismissed and perpetually disqualified from employment in any public or
private utility or service company and from holding any public office.
b. If in committing any of the acts enumerated in Section 2, Rule II
hereof, any of the other acts enumerated is also committed, then the
penalty next higher in degree as provided herein shall be imposed.
c. If in committing any of the acts enumerated in Section 2, Rule II
hereof, any of the other acts enumerated is also committed by, or in
connivance with an officer or employee of an electric utility concerned,
such officer or employee shall, upon conviction, be punished with a
penalty of one (1) degree higher than the penalty provided herein, and
forthwith be dismissed and perpetually disqualified from employment in
any public or private utility or service company. Likewise, the utility
concerned which shall have knowingly permitted or having knowledge of
its commission shall have failed to prevent the same, or was otherwise
guilty of negligence in connection with the commission thereof, shall be
made to pay a fine not exceeding triple the amount of the "differential
billing" subject to the discretion of the courts.
d. If the violation is committed by a partnership, firm, corporation,
association, or any other legal entity, including a government-owned or
controlled corporation, the penalty shall be imposed on the president,
manager, and each of the officers thereof who shall have knowingly
permitted, failed to prevent or was otherwise responsible for the
commission of the offense.RULE VII
Billings and Surcharges
SECTION 1. Testing of Watt-hour Meter Standard Equipment — The NPC, the NEA
and all electric utilities shall submit all their working watt-hour meter standard
equipment (which are used in the testing of their respective consumers’ watt-hour
meters) for testing and sealing by the ERB within thirty (30) days following the
publication of this Implementing Rules and Regulations and every year thereafter.
The NEA shall likewise furnish the ERB, within that same period above prescribed,
with copies of the test reports on the calibration of the watt-hour meter standards
equipment of all the electric cooperatives.
SECTION 2. Testing of Meters — All electric utilities and cooperatives, as the case
may be, shall cause the calibration of the meters of their respective customers at
least once every two (2) years.
The said utilities and cooperative a shall likewise furnish the ERB with copies of the
test reports within thirty (30) days after each calibration.
SECTION 3. Computation of the Differential Billing — The differential billing shall
be determined by multiplying the unbilled consumption in kilowatt-hour, the period
covered by the differential billing and the current rate of electricity at the time of
apprehension.
SECTION 4. Computation of the Unbilled Consumption in Kilowatt-hour — The
unbilled consumption in kilowatt-hour may be computed by using the following
methodologies:
4.1 For cases falling under paragraphs (a), (e), (f) and (g) Section 1, Rule
III hereof, the following methodologies shall be used:
a. The estimated monthly consumption as per report of load and
inspection conducted during the time of discovery;
b. The highest recorded monthly consumption within the five-year
period preceding the time of the discovery;
c. The higher consumption between the average consumptions before
or after the highest drastic drop in consumption within the five-year
billing period preceding the discovery;
d. The highest recorded monthly consumption within four (4) months
after the time of the discovery.
4.2 For cases falling under paragraphs (b), (c) and (d) Section 1, Rule III
hereof, the following methodologies shall be used:
a. The result of the ERB test during the time of discovery;
b. The higher consumption between the average consumptions before
or after the highest drastic drop in consumption within the five-year
billing period preceding the discovery;
c. The estimated monthly consumption as per report of load
inspection conducted during the time of discovery;d. The highest recorded monthly consumption within four (4) months
after the time of the discovery; or
e. The highest recorded monthly consumption within the five-year
period preceding the time of the discovery.
4.3 For cases falling under paragraph (h) Section 1, Rule III hereof, any
of the foregoing methodologies may be used, whichever is applicable.
SECTION 5. Period to be Recovered — In determining the period to be recovered
under the differential billing, the following shall be considered:
a. When there was a change in the customer’s service connection, such as
change of meter, change of seal or reconnection, or replacement of parts,
the period to be recovered under the differential billing shall be reckoned
from the time of the last inspection.
b. In the absence thereof, the period to be recovered under the differential
billing shall start from the time the electric service of the person
concerned recorded an abrupt or abnormal drop in consumption; or
In the absence of both, a maximum of sixty (60) billing months, up to the
time of the discovery may be used as basis for the consumption;
Provided, however, that if the person concerned presents adequate and
indubitable proof showing that the period to be recovered by the
differential billing is less than sixty (60) billing months, the utility or
cooperative may recompute the amount of the differential billing based
on the established period for recovery.
The period to be used shall, in no case, be less than one (1) year
preceding the date of discovery of the illegal use of electricity.
In cases where the affected period is less than one (1) year, the utility or
cooperative may be allowed to compute for the differential billing using
one (1) year as the minimum basis for computation.
SECTION 6. Discovery of Prima Facie Evidence — The electric utility or rural
electric cooperative, upon discovery of any of the circumstances mentioned in Rule
III hereof, shall notify in writing the owner/occupant of the house or establishment
concerned or someone of suitable age and discretion residing therein and acting in
behalf of the owner/occupant of the incident.
In case the apprehension is witnessed by an officer of the law and not by an ERB
authorized representative, the tampered electric meter subject of the offense must be
placed in a suitable container, properly identified and sealed, and shall be opened
only for testing in the ERB’s meter laboratory by the duly authorized representative
of the Board.
SECTION 7. Inspection Report — An Inspection Report must be accomplished by
the utility or cooperative concerned after every inspection, monitoring of meter
installation or apprehension, indicating the following:
a. Date and time of the inspection;b. Condition of the meters, instrument transformers and metering
installations;
c. Changes made with the connections during the time of inspection;
d. Replacement made on the metering installations, if there is any;
e. Signature over the printed name of inspector; and
f. Signature over the printed name of the consumer or his duly authorized
representative.
The accomplished Inspection Report shall be attested to by the
authorized ERB representative or by his officer of the law, as the case
may be.
The original copy of the Inspection Report shall be kept by the electric
utility or electric cooperative concerned and shall not be destroyed
without prior authority from the ERB. A duplicate of the said report shall
likewise be furnished to the owner/occupant of the establishment
concerned or someone of suitable age and discretion residing therein and
acting in behalf of the owner/occupant.
SECTION 8. Imposition of Surcharges — An electric utility or rural electric
cooperative may impose surcharges in addition to the value of electricity pilfered, on
the bills of any consumer apprehended for tampering with his electric
meter/metering facility installed on his premises, as well as other violations of
contract like direct connection, use of jumper and other means of illicit usage of
electricity found installed in the premises of the consumer. The surcharge for the
violation of contract shall be collected from and paid by the consumer concerned as
follows:
a. First apprehension — twenty-five percent (25%) of the current bill;
b. Second apprehension — fifty percent (50%) of the current bill;
c. Third and subsequent apprehensions - one hundred percent (100%) of
the current bill.
The electric utility or rural electric cooperative is authorized to
discontinue electric service in case the consumer is in arrears in the
payment of the above imposed surcharges.
RULE VIII
Issuance of Restraining Orders or Writs of Injunction
SECTION 1. Issuance of the Writ of Injunction — Unless there is a prima facie
evidence that the disconnection was made with evident bad faith or grave abuse of
authority, no writ of injunction or restraining order shall be issued by any court
against any utility or cooperative exercising the right and authority to disconnect
electric service as provided in this Rules.SECTION 2. Filing of Bond/Counterbound — A writ of injunction or restraining
order issued by a court in the absence of evident bad faith or grave abuse of
authority on the part of the utility or cooperative concerned shall be effective only
when the affected person/customer files a bond with the court in the form of cash or
cashier’s check equivalent to the differential billing, penalties and other charges in
cases of illegal use of electricity. Such writ of injunction or restraining order shall
automatically be refused or, if already granted, shall be dissolved upon the filing by
the utility or cooperative concerned of a counterbond similar in form and amount as
that above registered.
SECTION 3. Report to the Supreme Court — Whenever a writ of injunction or
restraining order is granted, the court which is issued the shall submit a report to the
Supreme Court within ten (10) days from its issuance, setting forth in detail the
grounds or reasons therefor.
RULE IX
Rationalization of System Loss
SECTION 1. Caps on Recoverable System Loss Allowed to Private Electric Utilities
— The maximum rate of system loss that the utility can pass on to its customers
shall be as follows:
1. Fourteen and a half percent (14 ½ %) effective on February 1996 billings.
2. Thirteen and one fourth percent (13 ¼ %) effective on February 1997 billing.)
3. Eleven and three-fourths percent (11 3/4 %) effective on February 1998
billing.
4. Nine and a Half percent ( 9 ½ %) effective on February 1999 billing.
SECTION 2. Automatic Cost Adjustment Formula — Each and every utility shall file
with the ERB, on or before September 30, 1995, an application for approval of an
amended Generation Charge or Power Cost Adjustment formula that would reflect
the new system loss cap to be included in its schedule of rates.
The automatic cost adjustment clause of every utility shall be guided by the
following formula:
Generation Charge
Subsidizing consumption shall be charged a generation charge per KWH
equal to:
____A____ x ____1___ - E
B-(C+D) 1 - FT
Where:
A = Cost of electricity purchased and generated for the previous month
less revenue from subsidized Kwhrs on generation charge as applicable
B = Total KWH purchased and generated for the previous monthC = The actual system loss but not to exceed the maximum recoverable
rate of system loss in Kwh plus actual company use in Kwhrs but not to
exceed 1% of total KWHRS purchased and generated
D = KWH consumed by subsidized consumers
E = Applicable base cost of the amount incorporated into their basic rate
per KWH
FT = Franchise tax rate
SECTION 3. Fixing the Level and Effectivity of the New System Loss for the Utility
— Each and every utility shall file with the ERB, before the end of the fourth year
following the effectivity of this Rules, an application for the purpose of determining
the following:
a. whether the caps fixed shall be reduced further which shall in no case
be lower than nine percent (9%) after taking into account the viability of
the private electric utilities and the interest of the consumers;
b. the date of effectivity of the new caps; and
c. the permissible levels of recovery of system loss in areas that may be
added to the franchise area of the private electric utility after the date of
the effectivity of R.A. No. 7832.
SECTION 4. Caps on System Loss Allowed to Rural Electric Cooperatives — The
maximum rate of system loss that the cooperative can pass on to its customers shall
be as follows:
a. Twenty-two percent (22%) effective on February 1996 billing.
b. Twenty percent (20%) effective on February 1997 billing.
c. Eighteen percent (18%) effective on February 1998 billing.
d. Sixteen percent (16%) effective on February 1999 billing.
e. Fourteen percent (14%) effective on February 2000 billing.
SECTION 5. Automatic Cost Adjustment Formula — Each and every cooperative
file with the ERB, on or before September 30, 1995, an application for approval of
an amended Purchased Power Adjustment Clause that would reflect the new system
loss cap to be included in its schedule of rates.
The automatic cost adjustment of every electric cooperative shall be guided by the
following formula:
Purchased Power Adjustment Clause
(PPA) = _____A____ - E
B - (C + D)Where:
A = Cost of electricity purchased and generated for the previous month.
B = Total Kwh purchased and generated for the previous month
C = The actual system loss but not to exceed the maximum recoverable
rate of system loss in Kwh plus actual company use in Kwhrs but not to
exceed 1% of total KWHRS purchased and generated
D = KWH consumed by subsidized consumers
E = Applicable base cost of power equal to the amount incorporated into
their basic rate per kwh.
SECTION 6. Fixing the Level and Effectivity of the New System Loss Cap — Each
and every cooperative shall file an application with the ERB, before the end of the
fifth year following the effectivity of this Rules, to determine the following:
a. whether the caps fixed shall be reduced further which shall in no case
be lower than nine percent (9%) after taking into account the viability of
the electric cooperatives and the interest of the consumers;
b. the date fixed for the effectivity of the new caps; and
c. the permissible levels of recovery of system loss in the areas that may
be added in the area of coverage of the rural electric cooperative after the
date of the effectivity of R.A. No. 7832.
SECTION 7. Authority of the Energy Regulatory Board — Nothing in this Rule shall
impair the authority of the ERB to reduce or phase out technical or design losses as a
component of system losses.
RULE X
Recovery of Pilferage Losses
SECTION 1. Submission of Report — A utility or cooperative which recovers any
amount of pilferage losses shall submit to the ERB, within thirty (30) days from said
recovery, a written report under oath, which shall contain the following:
a. the fact of recovery
b. the date of recovery
c. the name of consumer concerned
d. the amounts recovered including the amounts resulting from
compromise agreement and surcharges imposed, if any
e. the amount of pilferage loss claimed
f. the explanation for the failure to recover the whole amount claimedg. itemized expenses incurred, if there is any
h. the amount passed on to the consumer
The utility or cooperative shall not accept payment from the consumer
during the pendency of the case for the recovery of a pilferage loss,
unless so provided in a compromise agreement duly executed by the
parties and approved by the Court.
SECTION 2. The full amount recovered by the utility or cooperative under the
preceding section shall be reflected as a reduction in the customer’s electric bill
through the automatic cost adjustment formula abovementioned, the application of
which shall be verified and confirmed by the Board through an Order.
RULE XI
Information Dissemination
SECTION 1. Information Dissemination — The private electric utilities, the rural
electric cooperatives, the NPC, and the National Electrification Administration
(NEA) shall, in cooperation with each other, undertake vigorous campaign to inform
their consumers of the provisions of the Implementing Rules and Regulations,
within sixty (60) days from the effectivity thereof and at least once a year thereafter,
and to incorporate a faithful condensation of said provisions in the contract with new
consumers.
RULE XII
Repeal and Separability
SECTION 1. Repeal and Separability — All existing rules, regulations or orders or
any part thereof inconsistent with this Rules are hereby repealed, amended or
modified accordingly. If any part or provision of these Rules is declared
unconstitutional or illegal, the other parts or provisions shall remain valid.
RULE XIII
Effectivity
SECTION 1. Effectivity — These Rules shall take effect fifteen (15) days after its
publication in two newspapers of general circulation in the country.
Adopted: 7 July 1995