Library
Agency issuances
16,884 issuances · 1941–2026
13 issuances in 2008 by Gloria Macapagal Arroyo
Newest first
- ERC Resolution No. 18 (2008) RESOLUTION ADOPTING THE RULES FOR APPROVAL OF REGULATED ENTITIES’ CAPITAL EXPENDITURE PROJECTS
- ERC Resolution No. 16 (2008) A RESOLUTION ADOPTING POLICIES TO GOVERN THE TRANSITION SUPPLY CONTRACTS WHICH HAVE BEEN ASSIGNED AND TRANSFERRED TO NATIONAL POWER CORPORATION SUCCESSOR GENERATING COMPANIES
- ERC Resolution No. 20 (2008) RESOLUTION MODIFYING THE RULES FOR SETTING DISTRIBUTION WHEELING RATES FOR PRIVATELY OWNED DISTRIBUTION UTILITIES ENTERING PERFORMANCE BASED REGULATION (RDWR)
- ERC Resolution No. 19 (2008) RESOLUTION ADOPTING THE POSITION PAPER OF DISTRIBUTION UTILITIES (DUS) ENTERING PERFORMANCE-BASED REGULATION (PBR) FOR THE REGULATORY RESET PERIOD JULY 1, 2010 – JUNE 30, 2014 (3 RD ENTRANTS)
- ERC Resolution No. 17 (2008) A RESOLUTION ADOPTING A NEW SYSTEM LOSS CAP FOR DISTRIBUTION UTILITIES
- ERC Resolution No. 09 (2008) A RESOLUTION DIRECTING ALL DISTRIBUTION UTILITIES TO REMIT THEIR RESPECTIVE PROPORTIONATE SHARES TO THE DISTRIBUTION MANAGEMENT COMMITTEE'S 2008 BUDGET
Advertisements
- ERC Resolution No. 08 (2008)
- ERC Resolution No. 07 (2008) A RESOLUTION IMPOSING A MORATORIUM ON THE FILING OF RATE ADJUSTMENT PETITIONS/APPLICATIONS BY THE ELECTRIC COOPERATIVES
- ERC Resolution No. 05 (2008) A RESOLUTION ADOPTING THE RULES TO GOVERN THE ISSUANCE OF CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY (CPCN) TO ENTITIES ENGAGED IN THE TRANSMISSION AND DISTRIBUTION OF ELECTRICITY
- ERC Resolution No. 04 (2008) A RESOLUTION SETTING THE INSTALLED GENERATING CAPACITY PER GRID, NATIONAL GRID AND THE MARKET SHARE LIMITATIONS PER GRID AND THE NATIONAL GRID FOR 2008 PURSUANT TO THE "GUIDELINES FOR THE DETERMINATION OF INSTALLED GENERATING CAPACITY IN A GRID AND THE NATIONAL INSTALLED GENERATING CAPACITY AND ENFORCEMENT OF THE LIMITS OF CONCENTRATION OF OWNERSHIP, OPERATION OR CONTROL OF INSTALLED GENERATING CAPACITY UNDER SECTION 45 OF REPUBLIC ACT NO. 9136"
- ERC Resolution No. 03 (2008) A RESOLUTION REQUIRING THE USE OF METER STICKERS AS PART OF THE ENERGY REGULATORY COMMISSION'S (ERC) APPROVAL OF METERS FOR MEASUREMENTS USED BY AH DISTRIBUTION UTILITIES (DUS)
- ERC Resolution No. 02 (2008) A RESOLUTION ADOPTING THE RULES FOR CONTESTABILITY
- ERC Resolution No. 01 (2008) RESOLUTION ADOPTING THE RULES TO GOVERN THE IMPLEMENTATION OF THE TIME OF USE (TOU) RETAIL RATES OF DISTRIBUTION UTILITIES (DUS) SOURCING 100% OF THEIR POWER REQUIREMENTS FROM THE NATIONAL POWER CORPORATION (NPC) AND/OR INDEPENDENT POWER PRODUCERS (IPPS) WITH AUTHORIZED RATES PEGGED AT NPC'S RATE