Skip to law

DOE (17 December 1997)

ADDITIONAL FEE FOR INCLUSION IN THE DOE REVISED SCHEDULE OF FEES AND CHARGES UNDER THE ENERGY RESEARCH LABORATORY (ERL)

DOE · December 17, 1997


(NAR) VOL. 9 NO. 1/JANUARY-MARCH 1998

[ DOE, December 17, 1997 ]

ADDITIONAL FEE FOR INCLUSION IN THE DOE REVISED SCHEDULE OF FEES AND CHARGES UNDER THE ENERGY RESEARCH LABORATORY (ERL)

Costing for Mineral Analysis Using X-ray Flourescent Spectrometer 10 Elements/Sample (SiO2, Fe2O3, Al2O3 TiO2, CaO, MgO, Na2O, K2O, MnO2, and P2O5) 1. Equipment: Depreciation: ($199,686) (P 30/$) (1 year/1,825 days) (1 day/8 samples) = 410.31 Maintenance: ($6,000) (P 35/$) (1 year/264 days) (1 day/8 samples) = 99.43 Electricity: (13.86/kw-hr) (3 Kw) (0.80) (0.5 hr/sample) = 16.63 ———— P 526.37/sample 2. Calibration: Standards : ($4,000) (P 30/$)(1/264 days) (1 day/8 samples) = 56.82 Manpower : (P 881.86/day) (10 days/yr) (1 yr/264 days) (1 day/8 samples) = 4.18 ———— P 61.00/sample 3. Analysis: Manpower: (P 881.86/day) (1 day/8 samples) = 110.00 Gases: (P 17,803) (1/264 days) (1/8 samples) = 8.43 ———— P 118.43/sample 4. Sample Preparation: Equipment: ($11,800) (P30/$) (1/1825 days) (1/8 samples) = P 24.25 Electricity : (P 13.86/kw-hr) (1/3 hp) (0.746 kw) (0.17 hr/sample) = P 0.58 Manpower: (P 477.27/day) (1 day/8 samples) = P 59.66Petri dish: (P 22/pc) (3 pcs/sample) = P 66.00 Caps: (P 11.40/pc) (3 pcs/sample) = P 34.20 Boric Acid: (P 1.016/g) (15g/sample) = P 15.20 ————— P 199.93/sample 5. Ashing Manpower: (P 75/hr) (5 hrs/5 sample) = P 75.00 Equipment Depreciation: (DM12,967) (P 18.5/DM) (1/5 yrs) (1/1320 samples) = P 36.35 Electricity: (P 13.86/kw-hr) (5kw) (0.80) (5 hrs) = P 277.20 Consumables: (540/crucible & disk liner) (1 c & dl/10 samples) = P 54.00 ————— P 442.55/sample Total = P 1,348.00/sample +10% Incidentals = P 1,500.00/sample Adopted: 17 Dec. 1997

(SGD.) CESAR V. RAMIREZ OIC-Assistant Secretary

Contents